Hurtières Tunnel Geological Hazard

Society for Mining, Metallurgy & Exploration
Hingant Pierre
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
20
File Size:
8643 KB
Publication Date:
Jan 1, 1999

Abstract

The Hurtières Tunnel was built in 1995 with drill and blast method, in metamorphic schist. It is located between Lyon and Torino on the A 43 motorway in the French Alps. During the construction, a geological hazard was encountered, which caused a massive ground collapse. The tunnel was filled up with 3,000 m3of glacial materials. Geological investigations realized after the accident showed that a narrow glacial valley was present at this location the water table was 40 m above the tunnel level. The paper will describe the collapse and the remedial methods which were implemented to proceed through the failure area. These included drainage works,2,000 m3 grouting and 6,200 ml jet grouting columns.
Citation

APA: Hingant Pierre  (1999)  Hurtières Tunnel Geological Hazard

MLA: Hingant Pierre Hurtières Tunnel Geological Hazard. Society for Mining, Metallurgy & Exploration, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account