Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mining-induced subsidence and deformation characteristics with thick unconsolidated overlying strataBy Dapeng JIANG, Haixiao YANG, Shanxi WU, Jinwang Zhang, Guoliang XU, Yipeng ZHANG
The subsidence and deformation characteristics of strata with thick unconsolidated overlying strata is quite different from that with consolidated overlying strata. In this paper, based on the enginee
-
Longwall Dust Trends And Developments In Longwall Dust ControlsBy Robert A. Jankowski, George E. Niewiadomski
INTRODUCTION The utilization of longwall mining technology in the United States has steadily increased since the first longwall plow system was installed in 1952. At the errs of FY 1992, some 76 co
Jan 1, 1993
-
Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, GermanyBy Axel Nitschke, Josef Arnold
Bochum’s Underground Lot 306 was characterised by a confined site and unique tunnelling methods. A highly mechanized construction concept was developed to achieve high progress rates. Bespoke backup s
Jan 1, 2005
-
Importance Of Geotechnical Field Mapping In Assessing The Stability Of Underground ExcavationsBy A. Adu-Acheampong
Stope instability at Ashanti Goldfields Company Ltd. (AGC) is a major concern. Using information from field mapping, major discontinuity sets were defined, Rock Quality Designation (RQD) was determine
Jan 1, 2003
-
High Altitude Passive Water Treatment System Design And Construction For Leach Pad EffluentBy K. Whiting, R. Huffsmith, R. Olsen, D. Adams
Long-term closure alternative selection for heap leach pad effluent is a daunting task. Passive water treatment, if designed with enough long-term capacity, can minimize long term O&M while meeting w
Jan 1, 2002
-
Shield-Driven Tunnel Enlargement By Pipe-Roof' Method For Subway Station ConstructionBy Keiichi Fujita, Michio Miyoshi, Hisashi Miyazaki
In the construction of "Hamacho" subway station (Tokyo Metropolitan Rapid Transit), in order to minimize ground surface settlement, the pipe-roof method was employed as an auxiliary measure when remov
Jan 1, 1979
-
Heavy Medium Cyclone Clearing 28 x 100 Mesh Raw CoalBy David G. Chedgy, Edward A. Zawadzki, Robert D. Stoessner
Extensive research and testing in commercial facilities has clearly demonstrated that heavy medium cyclones are the most effective process for cleaning a 0.6 x 0.15mm (28 x 100 Mesh) coal at low separ
Jan 1, 1988
-
Climax Panel Caving and Extraction SystemBy John C. Gould
GENERAL DESCRIPTION The Climax mine is located 161 km (100 miles) southwest of Denver on Fremont Pass astride the Con¬tinental Divide. Climax employs 2800 people to pro¬duce 42 670 t/d (47,000 stpd
Jan 1, 1982
-
Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build ContractBy David Hake, David Salisbury
The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT
Jan 1, 2005
-
Reducing Longwall Noise With Acoustical Material On The Shields - 4 Preliminary Analysis – Preprint 97-108By A. D. Prokop, J. P. Rider
Along with increased production from longwall units has come the likelihood of increased worker noise exposures. In recent years, equipment has become larger, more powerful, and noisier than its prede
Feb 24, 1997
-
Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case HistoryBy Bob Rautenberg
The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s
-
Field comparison of a roof bolter dry dust collection system with an original designed wet collection system for dust control "Mining, Metallurgy & Exploration (2020)"By D. Blackwell, W. R. Reed, G. Ross, S. Peters, M. Shahan
Dust collectors for roof bolting machines generally use a dry box to collect the roof bolting material. Recently, an underground mining operation converted a dry box dust collector to a wet box dust c
Aug 26, 2020
-
Expanding TLP Copper Production By Heap LeachingBy W. K. Katoto
The Tailings Leach Plant (TLP) of the Zambia Consolidated Copper Mines Ltd at Nchanga was commissioned in 1974 as the world's first largest successfully operated agitation leach SX-EW plant for c
Jan 1, 1996
-
Hydrometallurgical treatment of zinc ash from hot-dip galvanizing process Mining, Metallurgy and ExplorationBy G. Włoch, E. Rudnik
The oxide fraction of industrial zinc ash was characterized in terms of chemical and phase composition, leaching behavior in sulfuric acid solutions, and leaching thermal effect. The waste product con
-
Convection mechanisms for geothermal heat exchangers in a vertical mine shaft - SME Transactions 2013By N. Wahl, D. M. Blackketter, R. Thornton
This paper evaluated using a water-filled abandoned mine (Orphan Boy) as a heat source for a 240- kW closed-loop heat pump with the goal of heating a 2,000-m2 building. The mine has a 245-m vertical s
Jan 1, 2013
-
North Airfield Drainage Improvement at Chicago-O’Hare International Airport: Soil Stabilization Using Jet GroutingBy Martin G. Taube, Dwayne A. Lewis
Drainage improvements at O’Hare International Airport, Chicago, IL included the installation of a drainage and storm water system to control the over?ow from nearby Willow Higgins Creek. This involved
Jan 1, 2003
-
Expomin 2008 Expected To Attract More Than 60,000One of the largest mining shows in the world is set take place April 15-18 in Santiago, Chile. Expomin 2008 is expected to attract more than 60,000 professionals from around the world who are involve
Jan 1, 2008
-
Separated Kriging And Stochastic Simulation In Planning And Coal Content Production ControlBy Simona Markic
With the aim of environment protection the program package HOMOGEN is used for realizing the planning and noxious components control in the coal produced. Using the program package PRIPREMA the divisi
Jan 1, 1992
-
Handling of Heavily Alternating Water Inflow in the Shield Driven "Mangfallstollen"By Michael Beyer
Following the last Cholera Epidemic in 1872, resulting in approximately 400 deaths, the City Council of Munich decided to re¬place the former water supply system within the city limits by tapping new
Jan 1, 1995
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007