Separated Kriging And Stochastic Simulation In Planning And Coal Content Production Control

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 248 KB
- Publication Date:
- Jan 1, 1992
Abstract
With the aim of environment protection the program package HOMOGEN is used for realizing the planning and noxious components control in the coal produced. Using the program package PRIPREMA the division in levels and transformation (Hermite polynoms) in the N (0,1) distribution are made. By separated kriging 50 m x 50 m blocks are estimated on the levels and detailed distributions of the estimated component content are obtained. The face - longwall face is built in the blocks estimated in this way, and the direction of mining is determined. Using the stochastic simulation the distribution of the estimated production component (e.g. sulfur) on the face is obtained. Simulating the production of all faces in operation the distribution of the estimated daily mine production component is obtained. The estimated depot component is obtained in the same way. This procedure is used in the short-term planning of the estimated component movement for a given period in advance, and also in the daily production control in the case of changing conditions, e.g. the increased atmospheric pressure. The technology is successfully applied to the Velenje Lignite Mine Slovenia.
Citation
APA:
(1992) Separated Kriging And Stochastic Simulation In Planning And Coal Content Production ControlMLA: Separated Kriging And Stochastic Simulation In Planning And Coal Content Production Control. Society for Mining, Metallurgy & Exploration, 1992.