Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Biogeochemical Prospecting for Zinc and Lead in the Te Aroha Region of New ZealandThe uptake of zinc, lead, and copper by the flora of the Tui Base Mine area near Te Aroha is described.Vegetation and soil samples were taken from two traverses across the Raukaka Lode. Results. after
Jan 1, 1969
 - 
                    
                Pegmont: A Stratiform Lead-Zinc Deposit in the Precambrian of Northwest QueenslandStratiform lead-zinc mineralization at the Pegmont prospect occurs as a 4-6 m thick body interbedded within arkose, schist, amphibolite, and pegmatite of the Kuridala Formation in the Eastern Belt of
Jan 1, 1977
 - 
                    
                Some Rb-Sr Measurements on Granites Near Mount IsaRb-Sr measurements on total-rock samples of granitic rocks from the Mount Isa region have confirmed the existence of two periods of granite-forming activity. The Kalkadoon Granite, together with the E
Jan 1, 1966
 - 
                    
                The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist InstallationThe hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista
Jan 1, 2005
 - 
                    
                Advanced Design Concept on Largest Diesel-Mechanical Truck-Komatsu HD1600MBy Kato Y
As a direct result of the Mining Industries need to improve efficiency and production in Open Pit type operations, the size of haulage units have increased dramatically. This trend has continued su
Jan 1, 1982
 - 
                    
                Dewatering Investigation at Koolan IslandBHP Minerals Ltd operates an open cut iron ore mining operation on Koolan Island, off the coast north of Derby in the Kimberley region of Western Australia. The mine comprises a number of pits, the
Jan 1, 1986
 - 
                    
                Strata Movement Associated WIH Longwall MiningBy Hughson B
A multi-wire borehole instrumentation system was used to monitor strata movement caused by a retreating longwall face at the Ellalong Colliery, situated in the Lower Hunter Valley in New South Wal
Jan 1, 1987
 - 
                    
                Planning the Extraction of the Lead Orebodies Below 15 Level at Mount IsaBy Clifford C. E
The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extr
Jan 1, 1979
 - 
                    
                Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut MineBy Tilley H. L
The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio
Jan 1, 1989
 - 
                    
                An Economic Appraisal of Small to Medium Scale Alluvial Gold Mining Systems in Papua New GuineaThe small scale alluvial gold mining industry in Papua New Guinea (PNG) is c.irrently the only form of small scale mining carried out in this country. It already contributes significantly to the
Jan 1, 1991
 - 
                    
                A Detailed Assessment of Concentrator Performance at Broken Hill South LimitedBy S B. Stewart, C J. Restarick
Over a four-hour period of steady plant operation samples were taken at regular intervals frum points within the grinding and flotation circuits. Size fractions of each composite sample were analysed
Jan 1, 1971
 - 
                    
                The CSA ventilation upgrade – geotechnical challenges and learningsBy T M. Brettell, D Sidea
The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre
Oct 16, 2017
 - 
                    
                A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking SystemBy A T. Spathis, K E. Leslie, K R. Blay
Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore
Aug 24, 2015
 - 
                    
                Mineral Exploration in the Western United States Using Visible Short-Wave Infrared and Mid-Wave Long-Wave Infrared Hyperspectral Imagers û Joint Airborne Collection Using Hyperspectral Systems (JACHS)By W A. Peppin, D N. Riley, N W. Schulenburg
In June 2008, a joint airborne collection using hyperpspectral systems was tested on a single Twin Otter aircraft. This experiment was designed to incorporate two airborne hyperspectral sensors for ge
Jan 1, 2008
 - 
                    
                Thermal Modelling and Mitigation Measures for the Bogong Power DevelopmentBy D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
 - 
                    
                Large Diameter Core SamplingBy P J. Jacobs
FORACO is the third-largest global drilling services company, and recently celebrated its 50th anniversary. The company’s historical roots are in French-speaking West Africa, delivering hydrogeologica
Jul 29, 2014
 - 
                    
                Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity SettingBy B P. Wrench, M J. Gowan, P J. Chapman
Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat
Jul 27, 2015
 - 
                    
                Monitoring of M10000 IsaMill™ Process Performance by Passive Acoustic EmissionsBy A McEwan, J Masters, C A. Jackson, A Catanzano, V Sharp, M Millen, S Rainey, S J. Spencer, G Roberts
A passive acoustic emission (AE) monitoring system has been developed and trialled on two M10000 IsaMillsTM. The analyser detects AE stress waves generated by grinding media impacts with the mill line
Sep 1, 2014
 - 
                    
                Opening Supports to Segmental Linings – A Novel Shotcrete Support SolutionBy M Burdick, A Harding, M Krulc, M Chappell
Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How
Sep 17, 2014
 - 
                    
                Tarnagulla Gold MineBy L Faulkner
The Tarnagulla Gold Project in Central Victoria, Australia, was developed and operated by Reef Mining NL between 1994 and early 2000, producing 53 000 ounces of gold from the Nick OÆTime Shoot, a sing
Jan 1, 2008