Search Documents

  • AUSIMM
    Purification of Nickel and Cobalt from Heap Leaching Effluents Using Ion Exchange Resins

    Purification of Nickel and Cobalt from Heap Leaching Effluents Using Ion Exchange Resins A comparative study among several chelating resins for purification of a heap leaching effluent from a nickel

    Sep 13, 2010

  • AUSIMM
    Driving the 1,480 Ft Level at the South Mine, Broken Hill

    A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub

    Jan 1, 1965

  • AUSIMM
    Gravity Concentration ù A Better Way (or How to Produce Heavy Mineral Concentrate and Not Recirculating Loads)

    By D Wyatt, J Domenico, W Kow

    Over the past few years developments in heavy minerals processing have concentrated on the mineral separation portion of the business. The best example of this would include new developments in rare-e

    Jan 1, 2001

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • AUSIMM
    Dealing with Organic Wastes and Byproducts - One Economic and Environmentally Sound Solution

    By Keet B. A, Waid J. S

    The Gippsland Basin is one of Australia's most important producers of petroleum products. An inevitable byproduct of the production, refinement and transport of the millions of barrels of oil i

    Jan 1, 1992

  • AUSIMM
    The Genesis of the Iron Ores of the Middleback Range, South Australia

    The Physiographical Features of the Region The Middleback; Range proper, from the Iron Duke in the south to the Iron Prince in the north, extends in a meridional direction for 21 miles, but may well b

    Jan 1, 1949

  • ISEE
    A Case Study of Near-Field Vibration Monitoring, Analysis, And Modeling

    By Tamara Whitaker, James Gunderson, Ruilin Yang

    This paper presents the results of a vibration control project conducted in soft overburden at a surface coal mine located in the western United States. The study uses near-field blast vibration monit

    Jan 1, 2008

  • SAIMM
    A critical comparison between a compressed air driven rocker arm shovel and a track-bound non-throw loader - Synopsis

    By A. Meek

    This report compares the compressed air driven rocker shovel to the newly developed Warthog Non-throw development end loader. The two machines were compared on aspects such as safety, loading potentia

    Jan 1, 2009

  • AUSIMM
    The Geology of the Manto Verde Mine, Atacama Desert, Chile

    The Manto Verde mine is found in the coastal ranges of the Atacama desert, 1000 km north of Santiago,

    Jan 1, 1992

  • ISEE
    Platform Loading from Explosions in Saturated Sand using a Visco-Plastic Model

    By W G. Szymczak, Leslie C. Taylor

    The University of Maryland (UMD) has conducted a series of small-scale tests using explosive charges buried in saturated sand. Twelve different combinations of depth of burial of the charge and height

    Jan 1, 2007

  • NIOSH
    IC 9483 - Water Well Safety Bits - Health and Safety Information for the Water Well Industry

    By Dana C. Reinke

    A job analysis is a written list of the tasks associated with doing a particular job. In drilling, describing the steps associated with adding rod to the drill steel would be an example of a task asso

    Jan 1, 2005

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • DFI
    Prediction Of Jet Grout Column Diameter In Cohesive Soil

    By Chu E. Ho

    Current methods of determining jet grout column diameters are highly empirical and site specific, and do not take into account the jet hydrodynamics and soil parameters explicitly. A theoretical model

    Jan 1, 2006

  • AUSIMM
    Dynamic Trial of an On-Stream Analyser for Iron Ore Fines

    By Messenger A. J, Miles J. G

    A thermal neutron irradiation technique using a mCf neutron source has been developed and applied to thp.simultaneous determination of iron and aluminium (expressed as AI2O3) in iron ore fines (-6 mm

    Jan 1, 1980

  • ISEE
    Practical Aspects of GPS Positioning and Equipment Monitoring Technology in Drilling and Blasting

    By Carl Hendricks

    Aquila Mining Systems Ltd., is the world leader in drill monitoring, control and GPS-based machine navigation systems for the mining industry. This paper will review the design and application of AQUI

    Jan 1, 2000

  • SME
    Foreign coal is a threat, but US producers are finding ways to compete

    By Steve Kral

    Competition from foreign coal producers could displace as much as 9 Mt/a (10 million stpy) of US coal bound for power plants located near waterways. But, according to a Maryland-based coal consultant,

    Jan 1, 1986

  • SME
    Shanxi Wanjiazhai Yellow River Diversion Project—Lots II & III

    By Edgardo Fogli, Mario Lampiano, Antonio Nicola

    The project is located in the northern region of the People’s Republic of China and was awarded to Impregilo, as sponsor of the Wan Long Joint Venture, in September1997. The project consists of fo

    Jan 1, 2001

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011

  • NIOSH
    OFR-32-80 Dewatering Systems For Surface Coal Mines

    By J. E. Rourke, O&apos

    This report incorporates a review of available dewatering technology and an evaluation of its relevance to surface coal mines in the Interior Province of the United States. Guidelines for the selectio

    Jan 1, 1979

  • SME
    The Relationship Between Tunnel Convergence and Machine Operational Parameters and Chip Size for Double Shield TBMs— A Case History of Ghomroud Water Conveyance Tunnel

    By Jamal Rostami, Ebrahim Farrokh

    Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel co

    Jan 1, 2007