Shanxi Wanjiazhai Yellow River Diversion Project—Lots II & III

Society for Mining, Metallurgy & Exploration
Mario Lampiano Antonio Nicola Edgardo Fogli
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
1096 KB
Publication Date:
Jan 1, 2001

Abstract

The project is located in the northern region of the People’s Republic of China and was awarded to Impregilo, as sponsor of the Wan Long Joint Venture, in September1997. The project consists of four tunnels for a total length of 88,700 m, with an excavation diameter of about 4.9 m. The lining is made of honeycomb pre-cast segments, connected by PVC dowels and the joints are sealed with elastomeric gaskets. The geology is mainly Limestone, Dolomite and Sandstone. Karst cavities are abundant and are often in-filled with plastic red clay. This has adversely affected the TBM’s progress. Four double shield telescopic TBMs were mobilized to cope with the very tight construction schedule and, at the end of November 2000, more than 80% of the tunnel has been bored. The article analyses the TBMs’ productions in the various geological conditions and the results of different technical solutions adopted at the project.
Citation

APA: Mario Lampiano Antonio Nicola Edgardo Fogli  (2001)  Shanxi Wanjiazhai Yellow River Diversion Project—Lots II & III

MLA: Mario Lampiano Antonio Nicola Edgardo Fogli Shanxi Wanjiazhai Yellow River Diversion Project—Lots II & III. Society for Mining, Metallurgy & Exploration, 2001.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account