Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability
By Jinsheng Chen
Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron
Jan 1, 2002
-
Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.
By Styles P.
To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est
Jan 1, 1992
-
Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)
By Shosei Serata
Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in
Jan 1, 1984
-
Frictional Properties of Rock Applied to Mining Excavations
Results of direct shear tests on rock discontinuities and triaxial compression tests on intact rocks are presented and - discussed. The main parameters considered area stress functions, angle of in
Jan 1, 1987
-
Design Factors In Near-Seam Interaction
By A. Grenoble
The mining of seams in close proximity can greatly accentuate interaction problems. At distances of less than 110 feet vertically interaction can occur for both over and under mining. Research into gr
Jan 1, 1984
-
Ground Control Experiences in a High Horizontal Stress Field at Inland Steel Coal Mine NO. 2,
By C. Thomas Blevins
This paper is intended to be a hands on experience account about ground control in a Southern Illinois coal mine. Its aim is to show how a combination of real world mining practices and constraints al
Jan 1, 1984
-
Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine
In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,
Jan 1, 1997
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)
By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984
-
The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)
By Stephen Tadolini
Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen
Jan 1, 2003
-
Bailey Mine Slurry Impoundment Longwall Subsidence Monitoring
By Richard J. Perin
Subsidence monitoring was conducted in proximity to the 1-A and 2-A longwall panels at Consol Pennsylvania Coal Co.'s (CPCC) Bailey Mine slurry impoundment. Monitoring fullfills federal Mine Safe
Jan 1, 1988
-
Field Measurements of Chain Pillar Response to Longwall Abutment Loads
By Christopher Mark
Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess
Jan 1, 1986
-
Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)
By Deno Pappas
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr
Jan 1, 2002
-
Continuing Development of Innovative Cable Support Systems
By John G. Oldsen
Passive cable bolting and active cable trusses have been used in roof support for more than two years Excellent roof control has been experienced by many coal operations. This paper covers the new
Jan 1, 1997
-
A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel Coal
By Dion Pastars
Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the
Jan 1, 2007
-
Effect of In Situ Stresses on the Stability of Coal Mine Development Workings
By Murali Gadde
Among different types of ground control problems associated with underground coal mining, those related to in situ stresses are the most common ones affecting the safety and economy of a mining operat
Jan 1, 2004
-
Optimizing Secondary Roof Support With The NIOSH Support Technology Optimization Program (STOP) (9d51b6a2-7ba0-4aba-9b0e-5647ea8b90eb)
By Thomas M. Barczak
The decade of the 90's brought an unprecedented increase in the development of innovative technologies to provide more effective and easier to install roof support in underground mines. To facili
Jan 1, 2000
-
A Case History of Computer-Aided Lineament Analysis for Ground Control Planning
By C. D. Peters
The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu
Jan 1, 1986
-
Understanding and Optimizing the Performance of Passive Primary Support on Coal Mines
By Anthony Spearing
There are approximately 68 million rockbolts installed annually in underground coal mines in the USA (Tadolini and Mazzoni, 2006). The most utilized is the passive fully grouted resin rebar bolt, whic
Jan 1, 2014
-
Selection of Tunnel Support System by Using Multi Criteria Decision Making Tools
By Kazem Orace, Navid Hosseini, Mehran Gholinejad
"Selection of the optimum support system for underground openings such as tunnels is a complex process. In this paper a new approach, based on a combination of the Analytical Hierarchy Process (AHP) t
Jan 1, 2010
-
A Comprehensive Computer Model For Predicting Dynamic Subsidence For Longwall Operations
By Y. Luo
This paper presents a number of mathematical models for predicting the different phases of the complete surface subsidence process associated with underground longwall mining. A computer program devel
Jan 1, 1992