Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Real-Time Monitoring Of Cable Shovel Stress For Improved Machine HealthBy S. Frimpong
Cable shovel requires continuous monitoring through excavation to achieve reliability, longevity and economic usage. The operating environment and the stress and deformation fields on the front-end as
Jan 1, 2006
-
Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021By Mirko Martini, Marcelo Benaglia, Andrea Codalli
Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its
Jun 13, 2021
-
Comparison Of Arched And Flat Seal Designs Using Finite Element AnalysisThe failure of a seal in an underground coal mine can have devastating consequences. Traditionally seals have been constructed as flat walls. Large hydraulic dams, on the other hand, are constructed
Jan 1, 2007
-
Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage PreventionBy Fritz Grübl
Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.
Jan 1, 2001
-
Mine Modeling Software for Less Than $1000 – Usefulness and LimitationsBy Betty L. Gibbs
Geologically simple deposits can be modeled quickly and easily with inexpensive gridding and mapping software. Hundreds of mines around the world use RockWorks99 and Surfer 7 for generating contour m
Jan 1, 2000
-
Building Human Resources Through Systematically Designed InstructionBy R. E. Mclvor
This is an update of an original dissertation on this topic by Lavallee, McIvor and Stolovitch (1992). A step-by-step, technical procedure used to measure and improve the performance of plant grinding
Jan 1, 2008
-
Correct Identification Of Chrysotile Asbestos In OresBy Allison
During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the
Jan 1, 2005
-
Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a
Jan 1, 2009
-
Selective Leaching of Arsenic from High-Arsenic Dust in the Alkaline System and its Prediction Model Using Artificial Neural Network - Mining, Metallurgy & Exploration (2021)By Yun-tao Xin, Yu Yi, Kang Yan, Gang Li, Xiao-dong Lv
This study investigated the selective removal of arsenic from high-arsenic dust in alkaline systems and the effects of different leaching conditions. The results indicated that the liquid–solid ratio,
Jul 29, 2021
-
Evaluation of Airborne Crocidolite Fibers at an Asbestos-Cement PlantBy Matthew S. Sanchez, Richard J. Lee, Matthew D. Zock, Drew R. Van Orden, Yumi Kamiya, Edward B. Ilgren
In many developing countries, asbestos is still used for friction products, insulation, and asbestoscement products. However, there is very limited modern data evaluating the airborne concentrations o
Jan 1, 2012
-
Rare Earths Not Rare AnymoreBy F. G. Heivilin
We are no longer short of viable Rare Earth deposits. As little as 2 years ago China mined and produced 97% ofthe world?s rare earths. Only a few deposits were in an advanced stage of exploration and
Feb 27, 2013
-
Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? IntroductionBy Geoffrey Hughes
The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive
Jan 1, 2008
-
The Planning, Design and Construction of the Tuas Cable Tunnel and Future Power Transmission Cable Tunnels in SingaporeBy G. D. Mainwaring, Weng L. W, Lam Y. K.
The first power transmission cable tunnel in Singapore was the 2.6km long undersea tunnel between Pulau Seraya and mainland Singapore, constructed in the1980s. Ten years later, similar concepts were u
Jan 1, 2001
-
Design and Construction of the Shoal Creek Raw Water Intake at Lake LanierBy D. Rendini, R. D. Gutridge
INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr
Jan 1, 2005
-
A Novel Probe For Investigation Of Slurry FiltrationBy D. W. Wu, M. T. Haque
A novel impedance probe has been commissioned specifically for capturing fast dynamic information about filtration processes. It provides an attractive alternative to more complex measurement techniq
Jan 1, 2000
-
Increased TBM Mobility and Adaptations for Special ProjectsBy Dennis Ofiara
Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin
Jan 1, 2008
-
Sampling Methods for Seamount Cobalt-rich Crusts and Determination of the Minimum Reliable Assay Sample QuantityBy Xuehua Zhang, Shengxiong Yang, Huiqiang Yao, Gaowen He
"Seamount cobalt-rich ferromanganese crusts (hereafter crusts) are authigenic iron/manganese hydroxide/oxide deposits formed from direct precipitation of minerals from seawater onto a hard substrates
Sep 1, 2014
-
The Economics of Mechanical Raise BoringBy James H. Dye, N. E. Norman
There will be about 300 raise boring machines used worldwide by late 1981, attesting to the acceptance of this drilling system by the mining and construction industries. Over the past few years, many
Jan 3, 1981
-
Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut TunnelsBy W. G. Brunner
The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a
Jan 1, 2007
-
An Underground Concept For Oil Field Development In Offshore AreasBy Cherie H. Tilley
The possibility of drilling oil wells from underground locations is not a new concept. It bas not been cost effective for the oil industry in the past and therefore disregarded. Today's state of
Jan 1, 1983