Jet Grouting for Strength in Marine Sediments with HydrocarbonsBy Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston
Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest
Jan 1, 2019
-
Remedial Work On Large Pile Deviation In The Very Thick Marine Swamp Clay DepositBy Wanchai Teparaksa
Pile deviation generally can happen after installation of driven pile particularly in soft soil layers. In this case study, all 242 diameter 0.8 m spun piles were deviated from 20 to 820 mm. The large
Jan 1, 2002
-
BRING YOUR A-GaME! THE BENEFITS OF ADVOCATING FOR ADVANCED GEOTECHNICAL EXPLORATION METHODSBy Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers
Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali
-
Toe Protection For H-Piles On Sloping Bedrock At Rainy River - SummaryBy Jon E. Bischoff
Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi
Jan 1, 1993
-
Marine Foundations Of Bridges In The Northeastern USABy James S. Graham
Marine design and construction methods are presented on the caisson foundations for the tower piers at the Brooklyn, Ben Franklin, Delaware Memorial 1st, Tappan Zee, Walt Whitman, Throgs Neck, Verraza
Jan 1, 2005
-
Application Of Several Soil Improvement Methods In ChinaBy J. H. Qian
China is one of the countries with comparatively wide distribution of soft soil. In the wake of the rapid developement in the national economy and construction, the improvement technique of soft soil
Jan 1, 2010
-
Ground Energy Systems In London - A Best Practice ApproachBy Ryan Law
Ground energy systems are being installed in increasing numbers in the United Kingdom. This is particularly true in London where planning regulations require larger scale developments to provide at l
Jan 1, 2008
-
Risk Management and Ground Improvement Technologies in the Case of LiquefactionBy Sebastian Fischer, Rolf Katzenbach, Steffen Leppla
"The risk management in the case of liquefaction is one of the most serious and also difficult issues in geotechnical engineering because failure caused by liquefaction is always a sudden failure with
Jan 1, 2015
-
Verification of Installation and Performance of ACIP Piles for BridgesBy W. Morgan NeSmith
"The DFI ACIP Pile Committee, in conjunction with the Florida DOT, completed an ACIP Pile installation monitoring and performance test program in late 2016 to advance the inclusion of ACIP piles in fu
Jan 1, 2017
-
A Review of the Design Formulations for Static Axial Response of Deep Foundations from Cone Penetration Test DataBy Fawad S. Niazi
Analysis of deep foundations in terms of axial capacity has been a topic of great interest in the soil-structure interaction problems. Soil behavior is governed by a series of complex stress-strain ch
Jan 1, 2013
-
Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.By Sudhir Kumar Das
"The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted
Jan 1, 2015
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Accumulated Rotations of Bucket Foundations under Long-Term Cyclic Loads in Sandy GroundBy Sung-Ryul Kim, Woong-Jong Park, Juhyung Lee, Si-Hoon Lee
"A bucket foundation has been considered to be a potential foundation technology for offshore wind turbines. In this study, a series of 1-g model tests were performed to analyze the accumulated rotati
Jan 1, 2016
-
Ground Improvement Utilizing Vibro Probes Eliminates Liquefaction Concern For A Bridge FoundationBy Aly M. Mohammad
Croton Point Avenue Bridge carries Croton Avenue over Metro-North main tracks at Harmon Rail Yard in Westchester County, New York. The new bridge is 1100 foot long and 36 foot wide nine span structur
Jan 1, 2007
-
Using Thermal Integrity Profiling to Evaluate the Structural Integrity of Soil NailsBy Inc. Pile Dynamics, Daniel S. Belardo, Marcus Galvan, George Piscsalko
Soil nails are often utilized as a temporary or permanent earth retention technique for slope stabilization and for excavation retention for existing or new structures. Soils nails are generally advan
Jan 1, 2017
-
Using Large Pile Driving Hammers For The Foundation Of Bridges And WindparksBy Bernhard Bruggaier
Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u
Jan 1, 2002
-
Practice Of Large Diameter Stepped Section Bored Pile Foundation Of A Deep Water BridgeBy Cen Guoji
The foundation of bored pouring concrete pile have been adopted in the bridge engineering of China since early in the sixties. They demonstrated tremendous technical advantage and achieved notable eco
Jan 1, 1991
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling MethodBy Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Pile Installation Recorder Tests For ACIP/CFA Piles - IntroductionBy Garland Likins
The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t
Jan 1, 1998
-
Engineering Foundation Support For Las Vegas Strip's Tallest Hotel CasinoBy Nicholas P. Gura
This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A
Jan 1, 2007