Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ground Penetrating Radar Investigations at the Planned Unki Platinum Mine, Great Dyke, Zimbabwe

    By R. Thierbach, W. Kahnt, Oberthür. T., D. Eisenburger, V. Gundelach

    ABSTRACT: The ground penetrating radar (GPR) method was used in a platinum mine in Zimbabwe by members of the Federal Institute for Geosciences and Mineral Resources (BGR). The measurements were carri

    Jan 1, 2010

  • CIM
    Nickel Recovery from Metallurgical Slags

    By S. C. Livanou, S. P. Tampouris, E. N. Zevgolis

    In ferronickel (Fe-Ni) production from oxidized nickeliferous ores, mechanical losses of ferronickel in the slag are reduced by magnetic separation. Slag from the electric furnaces (E/Fs) contains 0.1

    Jan 1, 2005

  • CIM
    The Chuktukon Niobium-Rare Earth Metals Deposit: Geology and Technological Characteristics of the Ores

    By S. N. Kalyakin, D. S. Flett, M. A. Mulagaleeva, N. V. Gudkova, S. S. Serdyuk, V. I. Kuzmin, Institute of Chemistry and Chemical Technology SB RAS, O. A. Logutenko, V. N. Kuzmina, V. G. Lomayev

    "The Chuktukon niobium-rare earth elements ore deposit is located in Siberia (Russia). Weathered carbonatite crusts are the basis of the ore deposit. The deposit itself is 3.5 km in length, about 800

    Jan 1, 2016

  • CIM
    Composite Materials in Aircraft Applications

    By Eugene Sun, Qiang Xu

    This presentation will review current applications of composite materials in aircraft design and discuss the challenges involved in maximizing the potential of the composites in aircraft applications.

    Jan 1, 2010

  • CIM
    A hydraulic ore hoisting installation at the Detour Lake Mine QK Zone project: A feasibility study

    By H. J. Glass, J. G. L. Bekkers

    "In order to determine the feasibility of a hydraulic ore hoisting installation, the optimal operating conditions were calculated for applying such a system at the Detour Lake Mine of Placer Dome Ltd.

    Jan 1, 1998

  • CIM
    Remediation of a Uranium Processing Facility

    By Ernest Becker

    Golder Associates provided overall radiological direction and assistance to the client in their interactions with the Canadian Nuclear Safety Commission and operational radiation protection services f

    Aug 1, 2010

  • CIM
    An Investigation on the Effect of Age Hardening on the Formability of 7075 Aluminum Alloy

    By A. Sadough vanini A. Kami

    In this paper, effects of different ageing treatments on the mechanical properties, microstructure and formability of 7075 aluminum alloy have been studied. Forming limit diagrams of the alloy have be

    Oct 1, 2011

  • CIM
    CRIRSCO-Russia Protocol 2008 (Multi-Jurisdiction) - Protocol of Intentions between Russia and CRIRSCO

    "In 2008, the Committee for Mineral Reserves and International Reporting Standards (CRIRSCO) and the Russian State Commission on Mineral Reserves (GKZ) entered into an agreement leading towards harmon

    Jan 1, 2003

  • CIM
    Geomechanical Assessment for Drifts and Chambers Development in the Athabasca Basin

    By Theophile Yameogo

    Much has been said about the methodology of geomechanical design in underground excavations. However, the geological, hydrogeological and geotechnical complexities encountered at t

    Aug 1, 2010

  • CIM
    Pinchi Lake Mercury Belt

    By J. E. Armstrong

    "Pinchi Lake and Bralorne Takla mercury mines; Canada's only producing mercury mines during the past war (1939-1945); occur within the Pinchi Lake mercury belt. This belt is in central British Columbi

    Jan 1, 1954

  • CIM
    Cover Systems for the Uranium Industry: Are We Doing it Right?

    By Ward G. Wilson

    Best practice in the design and construction of soil cover systems for mine waste management has advanced extensively over the past two decades. While significant progress has been achieved, we still

    Aug 1, 2010

  • CIM
    Overcoming the Geotechnical Challenges of Drift Development at the Unconformity in the Athabasca Basin

    By Theophile Yameogo

    The rock mechanics literature has documented the challenges, failures and successes of tunneling through weak rocks. Cases usually deal with low RMR rock masses or high stresses in a fractured zone. W

    Aug 1, 2010

  • CIM
    Evolution of Gold Gravity Recovery in Grinding Circuits - A Critical Review

    By S. Makni, S. Koppalkar, A. Bouajila

    This paper reviews briefly the gravity recovery involving conventional gravity separators and centrifugal gravity separators. The advantages of semi-continuous gravity separators will be discussed. Te

    Jan 1, 2011

  • CIM
    Bioleacidng of Fine Low Grade Copper Ores

    By M. Oliazadeh

    The bioleaching of fine low grade copper sulfide ore is described. A sample of ground (> 1 mm) copper ore from Sarcheshmeh, Iran, was subjected to a series of agglomeration procedures and subsequently

    Jan 1, 2007

  • CIM
    Determination of the Constitutive Behaviour of AA6022-T4 Aluminium Alloy Spot Welds at Large Strains

    By J. Kang

    There is increasing demand to utilize aluminium alloy sheets and their spot welds by the automotive industry. While traditional uniaxial tensile tests only determine mechanical properties to small str

    Jan 1, 2011

  • CIM
    Computer Vision Applied to Corrosion Evaluation on Pipe Radiographs

    By M. Brochu

    In this paper, we present a computer-vision approach developed for wall-thickness measurements of corroded pipes inspected by double-wall radiography. The main objective of the work is to optimize dat

    Jan 1, 2005

  • CIM
    The Development of Uranium Mining in Australia: a Look from the Past to the Future

    By John Battista

    Uranium mining in Australia has a chequered history. This paper reviews the development of the Australian uranium mining industry from the 1930?s to the present day. It outlines the geology of the var

    Aug 1, 2010

  • CIM
    Uranium Ionic Exchange Performance at KATCO

    By Sergio Bustos

    A significant expansion project is under way at KATCO?s Torkuduk In Situ Leaching (ISL) operation to increase uranium production up to about 4000 tU/year. Higher flows and lower uranium concentration

    Aug 1, 2010

  • CIM
    Investigating the Combustion Conditions of TSL Lance in an Ambient Atmosphere

    By Avinash Kandalam, Markus Reuter, Jörg Kleeberg, Michael Stelter

    The Top Submerged Lance (TSL) technology has obtained significant importance in the pyrometallurgy industry for nearly four decades. One of the advantages of TSL furnace is its high reaction rate, whi

    Jan 1, 2019

  • CIM
    Aerial Detection of Radioactive Mineral Deposits

    By A. F. Gregory

    "AbstractA resumé of aerial radiation survey studies performed by and for Eldorado Mining and Refining, Limited, since 1943 is presented. Flight tests were initiated in 1947 and were followed .by inte

    Jan 1, 1955