A hydraulic ore hoisting installation at the Detour Lake Mine QK Zone project: A feasibility study

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 5
- File Size:
- 322 KB
- Publication Date:
- Jan 1, 1998
Abstract
"In order to determine the feasibility of a hydraulic ore hoisting installation, the optimal operating conditions were calculated for applying such a system at the Detour Lake Mine of Placer Dome Ltd. Next, a financial analysis was conducted in order to estimate the cost per tonne for hydraulic hoisting of the ore. Subsequently, the cost per tonne was compared with the hoisting costs associated with a new borehole hoist. Installing a hydraulic ore hoist at Detour Lake Mine was found to be feasible with considerably lower costs per tonne of ore. The applied research method appears to be very functional and can be used to do similar research for other mining operations. IntroductionThe principle of hydraulic ore hoisting is well known, yet hardly accepted in hard rock mining. Application of the system would result in a smaller diameter shaft requirement and a flexible, easily expandable system. However, underground ore size reduction might be necessary and practical experience with the system is limited. Following recent innovations in the field of pumping hardware, e.g. new GeHo and Siemag Transplan equipment, hydraulic ore hoisting should be seriously considered for certain mining operations. As a case study, a design was made for the development of the newly found QK-Zone at Placer Dome Ltd.’s Detour Lake Mine. Hydraulic ore hoisting has been compared with conventional skip hoisting by establishing the optimal operating conditions and pumping equipment requirements for similar capacities at a selected mining operation. Generally accepted equations for slurry transport were used to predict the variation of pressure and power requirements as a function of hourly production and pipeline diameter. These data are used to select suitable equipment and estimate cost figures in order to make a financial assessment."
Citation
APA:
(1998) A hydraulic ore hoisting installation at the Detour Lake Mine QK Zone project: A feasibility studyMLA: A hydraulic ore hoisting installation at the Detour Lake Mine QK Zone project: A feasibility study. Canadian Institute of Mining, Metallurgy and Petroleum, 1998.