Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Strain-Controlled Thermo-Mechanical Fatigue Testing of Aluminum Alloys Using the Gleeble® 3800 System

    By X. -G. Chen, J. Qin, K. Liu, D. Racine

    "Understanding the thermo-mechanical fatigue (TMF) behavior of materials plays a significant role in the safety design of critical components used in aerospace and automotive industries, such as engin

    Jan 1, 2018

  • CIM
    Study on Sulfidation Roasting and Flotation of Refractory Lead-Zinc Oxide Ore

    By Ltd Changsha Research Institute of Mining and Metallurgy Co., Shi Yunliang, Luo Yunbo, Chen Jun, Liu Miaohua, Xiao Jinxiong, Long Yan

    "A refractory lead-zinc oxide ore located in Yunnan has hundreds of tons of metal reserves, which is hard to be recovered effectively by conventional oxide ore beneficiation methods. In this study, by

    Jan 1, 2016

  • CIM
    Filterability of Asbestos Fibres Used in Wet Processes

    By M. S. Badollet

    Introduction The manufacture of some asbestos products involves the use of asbestos in combination with water, cement and granular fillers. This type of production is often called the wet or semi-w

    Jan 1, 1949

  • CIM
    Supervisory Control Project Of A Copper Solvent Extraction Pilot Plant

    By L. G. Bergh

    The experience developing a supervisory control and information systems in a SX pilot plant is presented. The plant is located at the Process Control Laboratory, Santa Maria University, in Chile. In t

    Jan 1, 2007

  • CIM
    The Effect of Weak Layers on Pillar Performance in South African Chrome and Platinum Mines

    By Gregory C. More O'Ferrall

    Generally pillars in the Southern African hard rock tabular underground mining environment are designed using either empirical pillar design formulae or numerical modelling (analytical) methods utiliz

    Jun 1, 2012

  • CIM
    Testing procedures for fire-resistant materials

    By J. A. Bossert

    "In 1957, the Department of Mines and Technical Surveys (now Energy, Mines and Resources Canada) issued their first certificate for a fire-resistant conveyor belt. The testing procedure used was a com

    Jan 1, 1982

  • CIM
    Recent Smelting Practice at Noranda

    By W. B. Boggs

    A paper describing the Noranda smelter was presented at the 1930 annual meeting of the Institute (1). A lacer article appeared in the Trans-actions of the A.I.M.&M.E. in 1933. Since that time there ha

    Jan 1, 1939

  • CIM
    SEDEX Lead-zinc Deposits - Proposed Sub-types and Their Characteristics

    By E. M. Hillary, D. F. Sangster

    "Abstract - As a contribution to the World Minerals Geoscience Database Project, an index-level database comprising information on 142 SEDEX Pb-Zn deposits and occurrences was constructed in Microsoft

    Jan 1, 1998

  • CIM
    Influence of Low Iron Inputs on Impurity Co-Precipitation in Teck’s Iron Removal Processes at Trail Operations

    By B. R. Neufeld, M. G. Heximer, S. J. Roach, W. G. Van Luven, D. G. Reynolds

    "Teck Metals Ltd. operates an integrated zinc-lead complex at Trail, British Columbia, Canada. In the zinc plant, zinc concentrates are roasted to produce calcine, which is then processed in the leac

    Jan 1, 2016

  • CIM
    Étude métamorphique d?un système hydrothermal à Cu-oxydes de fer métamorphisé au faciès amphibolite supérieure à granulite, Groupe de Wakeham, secteur oriental de la Province de Grenville, Québec.

    By Anne-Laure Bonnet

    Les connaissances acquises au cours des dernières décennies sur les gîtes de métaux de base et précieux intensément métamorphisés (p. ex. Vokes, 1991; Cornell et al., 1992; Zaleski et Peterson, 1995)

    May 1, 2003

  • CIM
    Two Dimensional Numerical Simulation of Fault Reactivation and Induced Seismicity

    By R. R. Song, Q. Li, H. Xing, X. C. Wei

    Geomechanical modelling of fault stability is an important part of CO2 capture and storage (CCS) research program to ensure its viability and long-term safety. Storage of CO2 in deep subsurface reserv

    Jan 1, 2015

  • CIM
    Application of Ultra-Wide Band (UWB) Radar in Detecting Unexpected Utility Lines in Open Cut Operations

    By J. Zou

    Open-cut method is most widely used for shallow utility lines installation. In urban areas, unexpected utility lines buried underground potentially turn open-cut construction into a highly risky opera

    Aug 1, 2013

  • CIM
    New Developments in Ion Exchange Resins for the Recovery of Gold from Complex Ores

    By J. van Deventer

    Volatile gold prices in the face of rising costs for mining and refining is causing the mines to look for new ways to reduce costs and increase recoveries. This task is complicated by the fact that th

    Jan 1, 2014

  • CIM
    Modeling Design of Working Boards with Reloading Points at the Border of Transferring Cargo from Railway to Motor Transport

    By B. R. Rakishev

    When transferring from the railway transport to the combined automobile-conveyor transport by stripping works at coal mines, it was proposed to form at the working zone a concentration horizon for rel

    Aug 1, 2013

  • CIM
    The Quebec Asbestos Testing and Quality Industry Control

    By J. P. Wiser

    THIS paper discusses testing and quality control of milled asbestos fibre. It has been composed with the intention of: (I) Summarizing past, present and probable future methods of testing and classify

    Jan 1, 1962

  • CIM
    The Exshaw Formation, Alberta

    By E. W. Mountjoy

    THE Exshaw formation is a thin but very persistent black shale unit generally well exposed along the easterly scarp faces of the fault blocks comprising tl1e front ranges of the Rocky mountains. It is

    Jan 1, 1956

  • CIM
    Assessment of Energy Efficiency and GHG Emissions for Iron- and Steel Production

    By Freislich. M., Y. Gordon

    "In the changing global market scenario for raw materials for the steel industry, a number of novel iron- and steelmaking process technologies are being developed to provide the steel companies with e

    Jan 1, 2012

  • CIM
    Comparison of Personnel Protection Methods Used on Mobile Electrical Equipment

    By E. W. O'Brien

    Personnel protection involves effective grounding and positive clearance of faults. This paper deals, in a general sense, with various schemes to achieve fool-proof personnel protection and reduce, to

    Jan 1, 1966

  • CIM
    Optimisation and Continuous Improvement of Antamina Comminution Circuit (f8192cd7-9bd8-4215-8434-d5a9df56e042)

    By Edward Rybinski, Serkan Dikmen, Walter Valery, Jorge Ghersi, Roberto Valle, Alex Jankovic, Javier Linares, Frank Davila

    Compañía Minera Antamina is a polymetallic mining complex that produces copper and zinc concentrates as primary products and molybdenum and lead/bismuth/silver concentrates as by-products. In 2007, Me

    Jan 1, 2012

  • CIM
    Optimization of the Refractory Lining Life of Copper Converters

    By A. J. Rigby

    The wear mechanisms of the tuyere lines of Peirce-Smith and Hoboken converters are a subject of endless debate and speculation. However, there has been an indication that one of the primary factors in

    Jan 1, 2019