Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Shear Strength Assessment of a Footwall Slab Using Finite Element Modelling (8b2e89dc-c0b3-4744-93cc-ccc49b155f5c)

    By N. Bahrani

    Photogrammetry surveys were used to document a footwall slab failure that occurred at a surface coal mine located on the eastern slope of the Rocky Mountains. Photographs taken before and after the fa

    Jan 1, 2009

  • CIM
    The Use of a Novel Chemistry Significantly Enhances the Strip Rate of both Gold and Silver from Carbon in Strip Circuits

    By E. J. Fuller, J. C. Monette

    "Gold and silver cyanide complexes are presently desorbed from activated carbon by means of hot caustic elutions. These solutions may or may not contain additional sodium cyanide. There are several pa

    Jan 1, 1992

  • CIM
    UNIFLOT SP129 - Copper Sulphide Collector

    By S. Auger, S. McDonald, K. Ward

    "This preliminary paper provides a summary of lab and mill flotation investigations into the copper collector at two Canadian operations. The orebodies illustrated in these studies both contain mainly

    Jan 1, 1992

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    The Role of Applied Biotechnology in Decommissioning Mining Operations

    By Margarete Kalin

    "Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma

    Jan 1, 1998

  • CIM
    Tank Cell Operation at Manibridge Mine

    By I. E. Wahn, E. A. Boutin

    "The Manibridge Mill is unique in its treatment of relatively high grade nickel-copper ore because in the mill design are included one 10' diam. x 10' Maxwell cell, and three 12' diam. x 12' tank cell

    Jan 1, 1974

  • CIM
    Column Flotation Operation at Mines Gaspé Molybdenum Circuit

    By V. Coffin, T. Cienski

    "(Figure 1) Reagentized pulp enters into the column at about 1/4 of the distance from the top. Inside the column it meets with a downward flowing stream of water and with an upward flowing mass of air

    Jan 1, 1981

  • CIM
    The Strength and Flow Performance of Glassfill Technology

    By Euler De Souza

    Backfilling in Canadian mines has been practised for close to 100 years and evidence anticipates the application of mine fill technology at an increasing rate during the foreseeable future. The evolut

    Apr 1, 2005

  • CIM
    Hydraulic Excavator versus Electric Rope Shovel Performance

    By J. Sammut, T. G. Joseph, R. Andreev, M. Curley

    "Decisions regarding mining method and subsequent choice of excavator must take into account the quantitative factors of productivity, availability, and capital, operating, and maintenance costs. Dig

    Jan 1, 2019

  • CIM
    Mineralogical Tools for Ore Characterization – Key Data at all Steps of Iron Ore Concentration

    By Sylvie Lévesque, Frederic Couët, Laura Pérez-Barnuevo, Cory Hennessey

    Determining mineralogical characteristics of samples throughout the iron ore concentration process – from drill core samples up to the concentrate – is critical to process improvement and remediation.

    Jan 1, 2016

  • CIM
    Advances in Centrifugal Gravity Concentration – Beyond Low Mass Yield

    By Ish Grewal

    "Batch centrifugal gravity concentrators, which produce very high ratios of concentration, have become common place for recovering free gold within milling circuits. Their effectiveness has proven to

    Jan 1, 2009

  • CIM
    New Method for Controlling the Volumetric Filling Condition in a Mill

    By J. Miettunen

    "The lining of a grinding mill has an important role in creating the conditions for the grinding process. The main purpose of the lining is to transfer the energy taken by the mill motor to the conten

    Jan 1, 1991

  • CIM
    Water Management and Effluent Treatment Practice

    By C. Larsen, E. Goodwin, E. Konigsmann

    "This paper describes the development of an innovative effluent treatment process for cyanide and heavy metal removal from tailings wastewaters at Hemlo Gold Mines Inc. Golden Giant operation.The impo

    Jan 1, 1989

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005

  • CIM
    On The Floatability of Gold Grains

    By Stephen L. Chryssoulis, Daniela Venter, Stamen Dimov

    "Comparative surface analysis of floated and rejected free gold grains from a number of full scale benefication plants and from pilot plant testwork, has shown silver (the most common impurity in gold

    Jan 1, 2003

  • CIM
    White Pass and Yukon Route

    By C. J. Brown

    "Access to the outside world is supplied by the Alaska Highway to continental Canada and the United States, the Haines Highway, and by the White Pass & Yukon Route to Skagway and Vancouver. Communitie

    Jan 1, 1973

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • CIM
    Mine-Mill Waste Water Treatment at Brunswick Mining

    By D. M. Fraser

    "Brunswick Mining and Smelting Corporation Limited operates two mines; one open pit (No. 6) and one underground (No. 12), approximately 20 miles south-west of Bathurst, New Brunswick. Both are massive

    Jan 1, 1980

  • CIM
    The Polaris Process Barge (413f976a-6a5f-4235-9531-1db4119721bb)

    By J. K. Gowans

    "INTRODUCTIONTo bring a mining property into production in the Canadian High Arctic a company must deal with the harsh environment, the short shipping season and the high cost of labour. In trying to

    Jan 1, 1983

  • CIM
    Recommended Practices for Application, Installation and Calibration of a Weightometer

    By D. G. MacBeth

    Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the

    Jan 1, 1975