Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Improving Quality Assurance and Quality Control Practices - Basic Methodology Using Worked Examples

    By P Stoker

    The need for quality assurance and quality control (QA/QC) in the sampling and assaying of minerals is fundamental to the reliability and confidence of a mineral resource estimate, reserve estimate an

    Jan 1, 2009

  • AUSIMM
    Kinetics of Collector Adsorption on Mineral Surfaces

    By A Holmgren, W Forsling

    In the present study infrared attenuated total reflection (IR-ATR) was used to monitor the rate of in situ adsorption of heptyl xanthate on a layer of zinc sulfide synthesised on a germanium ATR cryst

    Jan 1, 2005

  • AUSIMM
    Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel Caving

    By G J. Zhang

    The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved

    Jul 11, 2011

  • AUSIMM
    The Copper-Lead-Sulphur System at High Temperatures, and its Application to Continuous Copper Drossing

    By Willis GM

    The matte-metal-equilibria in the system Pb-Cu-S have been studied at temperatures between 720 and 920¦C by direct sampling and D.T.A. methods. These results are compared with those of other worker

    Jan 1, 1975

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • AUSIMM
    Experience with Pre-Drainage of Seam Gas in the Western Area of the National Coal Board

    Methane predrainage from coal seams in the Western Area of the U.K. has been practiced over the past decade. The differing reasons for the practice include the controlling of gas emission rates in

    Jan 1, 1982

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    The Development of the In Stream Analysis System as used at Z.C. Mines

    By Freeman NV

    The concept of an in stream analysis probe was developed at The Zinc Corporation (now Z.C. Mines) in the late 1960's and commercialised quite rapidly, by Phillips and then AMDEL, as an alternat

    Jan 1, 1988

  • AUSIMM
    A New Tool for Extensometer Data Analysis and Improved Understanding of Geotechnical Risk Factors

    By M Szwec, P Corbett, P Sheffield

    Centennial Coal operates the Springvale and Angus Place longwall mining operations that extract coal beneath the Newnes Plateau in the Western Coalfields of New South Wales. Springvale and Angus Place

    Nov 5, 2014

  • AUSIMM
    Chronostatistics ù A Powerful, Pragmatic New Science for Metallurgists

    Forty years ago Dr Pierre M Gy, a metallurgist, introduced variography as applied to monitoring a process. Consequently, his followers used the variogram to elaborate meaningful process control charts

    Jan 1, 2006

  • AUSIMM
    QPM hematite by-product as an ironmaking feed material

    By G Reynolds, L Lu

    Queensland Pacific Metals (QPM) is developing its flagship Townsville Energy Chemicals Hub (TECH) facility to produce nickel and cobalt sulfates from imported high-grade nickel laterite ore for nickel

    Sep 18, 2023

  • AUSIMM
    A Unique Vessel for Offshore Construction

    By Dawson CF

    About 17% of the world's present day oil supplies comes from wells drilled in the continental shelf of some 28 countries. The demand for oil is increasing each year and is expected to quintuple

    Jan 1, 1970

  • AUSIMM
    Training our New Starters – Between a Rock and a Hard Place

    By M Davis

    Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested

    Aug 22, 2011

  • AUSIMM
    Parametric study of flotation with acoustic sound

    By B Yang, L Wang, C Y. Ng

    Flotation process intensification is often achieved through changing chemical reagent scheme or flotation machine or both, which likely brings a hefty burden to the flotation plants in terms of capita

    Aug 24, 2022

  • AUSIMM
    A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron Ore

    By J Planner

    As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.

    Nov 22, 2011

  • AUSIMM
    Tregoora Gold Project, North Queensland

    The Tregoora Gold Project is centred around the old Mitchell River Antimony Field located 100 kilometres west-northwest of Cairns, North Queensland. The project is currently the subject of a joint ven

    Jan 1, 1986

  • AUSIMM
    The Kinetics of Ilmenite Leaching in Hydrochloric Acid

    The production of synthetic rutile from ilmenite using hydrochloric acid leaching is investigated. Previously published data is used to comment on the optimum process conditions. It is shown that the

    Jan 1, 2001

  • AUSIMM
  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007