    Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago

    By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin

    This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca

    Jan 1, 2018

  • DFI
    Understanding Soils Reports - Presented At A Structural Engineers Association Of Northern California Continuing Education Seminar On Foundations/Excavations, March 1984

    By Loring A. Wyllie

    Preparation, understanding and use of soils reports must be a team effort to be fully effective. The soils engineer must know what is to be built and exactly where. The structural engineer and owner m

    Jan 1, 1986

  • DFI
    A Small Diameter Vibration Pile With Soil Compaction

    By Miklós Kovács

    A new type of the cast in situ piles is introduced. The installation of the new pile is based on a pushing in/gaining back procedure. A temporarily closed tip element with square shaped cross-section

    Jan 1, 2002

  • DFI
    Determining The End Bearing Capacity Of Steel Tube Piles Driven To Glacial Till In The Montréal Area Of Canada

    By Richard Deakin

    This case study describes aspects of the design of bridge foundations using 320mm diameter steel tube piles in the vicinity of Montréal, Canada. In this area, these piles are a very commonly used and

    Jan 1, 2011

  • DFI
    Concrete Overbreak Estimation and Analysis Errors in Bored Piles

    By Nuno Cruz

    "The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before

    Jan 1, 2017

  • DFI
    Underpinning Atlanta International Airport Concourse E for APM Tunnel Extension

    By Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith

    "Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access

    Jan 1, 2017

  • DFI
    High Capacity Hollow Core Bar Piles

    By Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel

    "A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry

    Jan 1, 2017

  • DFI
    Rapid Lateral Load Testing Of Deep Foundations

    By Dan A. Brown

    This paper describes a method of conducting rapid lateral loading tests of deep foundations in which the load is applied to the foundation with a time duration of less than one second. For purposes of

    Jan 1, 2007

  • DFI
    Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - Summary

    By Edmund J. Cardoza

    The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is

    Jan 1, 1992

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • DFI
    Design of the Lift-in Dam at Olmsted on the Ohio River

    By Dale E. Berner

    A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo

    May 11, 2007

  • DFI
    Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.

    By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille

    "Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair

    Jan 1, 1900

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • DFI
    Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, Ga

    By Robert L. Goehring, Fred Munene

    This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.

  • DFI
    Remediation Of Rail Structures Impacted By Landslides Using Sleeved Bored Piles

    By Paul Hewitt, Aaron Rastall

    The New South Wales South Coast rail corridor is key infrastructure for both freight and passenger transport. Geomorphological and geological evidence suggests that land instability has been widesprea

    Nov 1, 2022

  • DFI
    Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket Design

    By S. Chilka, I. Maloney, J. Brady

    "The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e

    Jan 1, 2017

  • DFI
    Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative Solution

    By Filippo Maria Leoni, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co

    Jan 1, 2017

  • DFI
    Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement Project

    By Richard Hanke, Franz-Werner Gerressen

    "The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re

    Jan 1, 2015

  • DFI
    Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro Clay

    By Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong

    "Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al

    Jan 1, 2017

  • DFI
    TTMJ – The New System for Slurry (Diaphragm) Wall Joints

    By Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley

    "TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-

    Jan 1, 2017