Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Calculating Shock Wave Over pressure from High-Speed Video

    By Catherine Johnson, Kelly Williams

    The ability to measure the overpressure of a shock wave is necessary for explosives research such as shockwave focusing and field testing of blast-resistant designs for buildings and vehicles. To reco

  • ISEE
    Overpressure and Ground Vibration for Pipeline Construction Blasting - Measurements and Predictions

    By David Jones, Jeff Bregar, Damien Bell

    We have analyzed overpressure and ground vibration measurements for construction blasting for a large pipeline project. These field-measured levels have been compared to existing prediction curves in

    Feb 1, 2020

  • ISEE
    A Kinematic Approach for Blast Modeling

    By Ruilin Yang

    Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.

    Feb 1, 2020

  • ISEE
    Blasting Parameters for Concrete Fly-Overs

    By Bob de Raadt

    The main problem in blasting a fly-over spanning a main road is the brief time available for blasting and the removal of the debris, in order to minimize the ensuing traffic disruption in the public h

    Jan 1, 1984

  • ISEE
    Ground Vibration Attenuation Rate due to Blasting in South Florida

    By W. Sharkey Bowers

    This study was undertaken in order to determine a conservative estimate of the attenuation rate of vibrations through the shallow limestone in South Florida due to quarry blasting.

    Feb 1, 2020

  • ISEE
    Risk Management for the Explosives User

    By J T. Patterson

    The mining, quarrying and construction industries are often blamed for causing damage to residential-type structures when explosives are used. The claim experience for blasting vibration damage has be

    Jan 1, 1978

  • ISEE
    Computer Aided Blast Design for Tunnels

    By J L. Jethwa, A G. Gaithankar

    The paper deals with a software method developed to design the optimum blast parameters for tunnels and mine roadways for a given set of geo-mining condition without any major discontinuity. The appli

    Jan 1, 1993

  • ISEE
    Blast Optimization for Improved Dragline Productivity

    By Hike Humphreys, Geoff Baldwin

    A project aimed at blast optimisation for large open pit coal mines is utilising blast monitoring and analysis techniques, advanced dragline monitoring equipment, and blast simulation software, to ass

    Jan 1, 1994

  • ISEE
    Blast Vibration Predictions, Damage Assessment and Vibration Monitoring for a Medical Center Expansion

    By D. Lee Petersen, Travis Davidsavor

    The 2003-2004 expansion of a Duluth medical center required rock blasting adjacent to the existing structures, a Mn/DOT retaining wall and other urban structures. This case history describes the metho

    Jan 1, 2010

  • ISEE
    General Requirement for Effective Overburden Casting

    By James D. Cook, Dan McCutchen

    Effective overburden casting requires the efficient use of todays explosives and initiations systems if a mine is to survive. This paper uses a major coal stripping operation as an example of the prop

    Jan 1, 1994

  • ISEE
    Training and Licensing Requirements for Blasters

    By Stanley L. Lippincott

    A number of Federal and State agencies require formal training for blasters. Federal agencies often specify the need for initial training involving all job responsibilities as well as periodic refresh

    Jan 1, 1995

  • ISEE
    Three Laboratory Tests for Explosive Ruggedness

    By Michael Wieland

    Three laboratory tests were developed for rating the wave-impact ruggedness of cap-sensitive explosives that are used for blasting in underground coal mines. Destructible pipe fixtures, called simulat

    Jan 1, 1996

  • ISEE
    Blast Created Trenches for Groundwater Remediation

    By Jeffrey E. Loney, Andrew F. McKnown

    Recovery of contaminated groundwater migrating through bedrock can be very difficult due to the low transmissivity of many bedrock fracture systems. To overcome these difficulties, a system of control

    Jan 1, 1995

  • ISEE
    Stemming Selection for Large-Diameter Blastholes

    By Jack Eloranta

    Proper selection of stemming has a profound effect on blast performance. This paper describes several methods of evaluating stemming performance in 16-inch blastholes. Tests are done on stemming rangi

    Jan 1, 1994

  • ISEE
    Get Proper Insurance For Blasting Exposure

    By A. W. (Sandy) Neilson

    Whether you are a general contractor who hires subcontractors to perform blasting work or you have your own blasting crew, it is extremely important to understand how Business Liability Insurance work

    Jan 1, 2002

  • ISEE
    Micro-bit Analysis for Drillability Estimation

    By T. N. Singh, Vasudev Singh

    To explore and exploit the natural resources like oil, gas, economic mineral water drilling is still considered to be the reliable and economical method. When a drill bit penetrates the rock mass eith

    Jan 1, 2008

  • ISEE
    Elements of Dynamic Airblast Overpressure Modelling

    By A. S. Romphf, C. K. McKenzie

    Recent full-scale field studies involving single-hole charges fired to free faces under a wide range of operating conditions have delivered precious insights into airblast characteristics and propagat

    Jan 26, 2026

  • ISEE
    Development of a Blasting Mat Test

    By Paul Worsey, Matthew K. Coy

    New blasting mat designs are currently tested in the field on actual blasting jobs and only undergo qualitative rather than quantitative assessment. The majority of matted blasting occurs in trenching

    Jan 1, 2015

  • ISEE
    Close-In Blasting at Cornell

    By Jeff Yaro, Steven P. Case, Carl Kish

    This project involved the construction of a new 4-story library on the campus of Cornell University in Ithaca, New York. The new building was constructed completely below grade, adjoining several of t

    Jan 1, 1992

  • ISEE
    Comparison of Techniques Used to Develop a Slot Raise

    By Mauro F. Dobran

    The use of Slot Raises has been common for many years. The following presentation will compare various methods of developing these Slot Raises and introduce two new ones.

    Jan 1, 1996