Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Half-Way House - Controlled Demolition Group "Rocks the Casbah" with Tricky Special-Effects-Laden Blast

    By Jane Wright, Brent Blanchard

    Question: When it comes to demolition projects, what could be more demanding than asking a blaster to explosively demolish a stubby, heavily-reinforced concrete structure in the heart of a third-world

    Jan 1, 2002

  • ISEE
    Iron Ore Company of Canada (IOCC) Blast Optimization with Emulsion Explosives

    By M Lemieux, R Mason

    The SABREX blast modeling program was introduced to I.O.C.C.'s Carol Lake Iron Ore Project in December 1987. As part of CIL's Technical Services, SABREX was used to implement an optimization program d

    Jan 1, 1989

  • ISEE
    Changing Powder Distribution in the Highwall Holes Reduces Overbreak and Rockfall Hazards

    By Virgil J. Stachura, Calvin L. Cumerlato

    The Bureau of Mines conducted a series of tests to develop a blasting method that would reduce overbreak and rockfall hazards at a limestone quarry in northeastern Wisconsin. Reductions in overbreak w

    Jan 1, 1989

  • ISEE
    New Developments in Seismic Explosives

    By Oldrich Machacek

    Seismic explosives are very important tools in the search for oil and gas. Changes and new techniques in seismic exploration methods are also demanding new developments in seismic explosives. This art

    Jan 1, 1985

  • ISEE
    Trends in Drilling and Blasting (8aa24a46-8326-4148-8007-63f421ba2d8b)

    By Alan Bauer

    During the past several years, the trend to large-diameter blastholes in both open pits and underground mines along with the continuing developments in slurried explosives and delay systems has kept t

    Jan 1, 1978

  • ISEE
    Tester for SCB Detonators

    By John Arrell, James Stuart

    We have developed a tester that is uniquely able to measure the no-fire power level of certain types of electro explosive devices (EEDs). In the past, it has been difficult to establish a no-fire powe

    Jan 1, 2011

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • ISEE
    Silently Controlling Cracking Technology

    By Guang-Xin Li, Rui-Ping Guo

    Based on the analysis of factors affecting the cracking performance of Silently Cracking Agent (SCA), a new SCA structural model is built and a study on the swelling mechanism of SCA and a method to i

    Jan 1, 2000

  • ISEE
    Blasting a Narrow Orebody at Bong Mines, Liberia

    By Dieter Froelich, Giles Turcotte

    In the near future, Bong Mining Company (BMC) will start mining a new deposit known as Zaweah II which is a narrow iron orebody requiring multiple row blasts with the bench floor as a free face. This

    Jan 1, 1980

  • ISEE
    Excavation for Underground Salt Plant (1f20b243-bfe6-4609-ad5c-cf707711398b)

    By Steven P. Case

    To meet salt production needs over the remaining life of the Cayuga Mine at Lansing, New York, the Salt Division of Cargill, Inc. decided to build a new underground screening plant. The new plant requ

    Jan 1, 1996

  • ISEE
    A New Digital Centralized Blasting System

    By Peter Reinders, Dirk Hummel

    This paper describes a new digital Centralized Blasting System (CBS), which is currently being introduced into underground applications. The CBS makes use of the field-proven detonator and equipment t

    Jan 1, 2004

  • ISEE
    Facing the Drilling and Blasting Difficulties at Helwan Quarry, Egypt

    By M. Khaled, K. Abdel Rahman, M. Khattab

    Helwan limestone quarry is located at a distance of 35 km (21.7 miles) to the south of Cairo downtown. Drilling and blasting operations are used to extract the limestone for the Helwan Cement Company

    Jan 1, 2008

  • ISEE
    Planning for Profit

    By Isaac E. "Chip" Harris

    Any contractor who agrees to supply materials or to perform services for a sum, is well aware of the importance of proper pre-bid information. Being able to properly plan costs and methods results in

    Jan 1, 1975

  • ISEE
    Boosters for Explosives

    By E E. Cloete, R I. McCrindle

    Permitted explosives were previously nitroglycerine based and cap sensitive. Due to safety, health and environmental requirements, water-containing explosives, such as watergels and emulsions, were us

    Jan 1, 1999

  • ISEE
    Shape Charge Effectiveness

    By Daniel Castelo, Ben Potter

    This paper will discuss the most efficient and effective way to use shape charges when considering standoff distances and the amount of an explosive to be used. For each shape charge test that was per

    Jan 1, 2011

  • ISEE
    Blasting the Aliceville Bridge - a Society Joint Venture

    By E Emery Gray, Gary Ard

    Each year when hundreds of Engineers and Specialists in the explosives industry meet for the SEE Annual Conference, new ideas are exchanged and new business relationships formed. Harbert Construction

    Jan 1, 1981

  • ISEE
    Analysis of Annual-Delayed Successive (4D) Geophysical Charges in a Borehole

    By D. Preece

    The mining and oil industry employs techniques such as geologic mapping, core drilling and electromagnetic and potential field techniques to explore for new deposits. Since new discoveries of major ne

    Jan 1, 2011

  • ISEE
    Close Proximity Blasting at the University of Georgia

    By Mick Fritz, Gregory Poole

    Construction blasting is always challenging when in close proximity to existing structures, but when you are next to a landmark like Sanford Stadium at the University of Georgia it can get intense. Bl

    Jan 1, 2011

  • ISEE
    The 8 Millisecond Rule is Dead – Or Is It?

    By Daniel Richards, Dr Rob Farnfield, Dr Geoff Adderley

    The 8-millisecond rule has been in use for many years as a basic technique to help minimize vibration levels from surface blasting operations. The rule was based on work carried out in the 1960’s by t

    Jan 21, 2025

  • ISEE
    On Explosives Useful Work and Rock Mass Fragmentation Energy

    By Lina Lopez, Jose Sanchidrian, Jean Du Mouza, Essaieb Hamdi

    This paper evaluates the actual energy delivered by the explosives used in the fragmentation of rock during blasting vs. the available theoretical explosive energy. The evaluation of the fragmentation

    Jan 1, 2002