    Damage to Rock: Near Field Seismic Models Revisited

    By Santiago Gómez, Pablo Segarra, José A. Sanchidrián

    In this paper, differences between the industry-standard Holmberg-Persson (H-P) approach and a semi-analytical vibration prediction model called full-field solution (FFS) are analized. The analysis is

    Feb 1, 2020

  • ISEE
    Underground Mega Mass Blasting with Electronic Initiation Near Urban Area (d4770d5b-0062-4b3c-9658-460485a3a3f4)

    By Jean-Francois Lagueux, Andre Pomerleau

    Goldex Mine is an underground mine located near the town of Val-d’Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco

    Jan 1, 2011

  • ISEE
    Vibration Control at Long Harbour

    By Michael Burrell

    This project involved the protection of an historic landfill located on the site. Construction blasting was for a permanent access road to carry traffic to and from a new metal processing plant being

    Jan 1, 2012

  • ISEE
    Trial Study--Self Consuming Detonators to Reduce Ore Contamination

    By Kurt B. Oakes, Brian M. Fortelka

    Unimin Corporation operates an underground Silica Sand mine at Guion, AR located in North Central Arkansas. The Silica Sand deposit at Guion is part of the St. Peter Sandstone Formation, which is over

    Jan 1, 1999

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    Economic and safety benefits of StratablastTM for steeply dipping coal seams - a case study

    By Tapan Goswami, Brent Geoff

    Mining multiple steeply sloping coal seams introduces challenges in terms of safety and productivity. Work on steeply sloping surfaces for the processes of bench preparation, mark-out, drilling, loadi

    Jan 1, 2010

  • ISEE
    Improvement of the technology for performing blasting works in Studena quarry

    By Valeri Mitkov

    Studena Quarry is one of the main suppliers of inert materials for concretes production in Sofia. It is characterized by massif heterogeneity in density and fissuration. Failure to take into consider

    Jan 1, 2010

  • ISEE
    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Strain and Peak Particle Velocity as Vibration Criteria: Some Thoughts

    By Syed Haq, Kyle Optt, David Campo, Doug Anderson

    Limitations on allowable levels of vibration from construction activities generally consider either annoyance or damage. While activities such as drilling and roller compaction primarily create annoya

    Jan 1, 2004

  • ISEE
    Modeling An Artificial Screen For Reducing Seismic Vibration

    By Lazar Kricak, Vladislav Kecojevic, Dragan Bogunovic

    In spite of many advantages explosives have, their usage may cause environmental problem such as seismic vibration. One of the solutions to this particular problem may be application of an artificial

    Jan 1, 2007

  • ISEE
    Vibration impact reduction to the community through low density bulk emulsion.

    By E. Líder, J. Pavez, J. Rivera

    The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a

    Jan 1, 2024

  • ISEE
    Explosive Operations for Constructing a Tunnel Based PCB Collection System

    By Gerard McAlinden, Daniel Frost, Patrick McAlinden, James McAlinden

    In an effort to recover Polychlorinated biphenyls (PCB’s) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installatio

    Jan 1, 2010

  • ISEE
    Automatic 3D Fragmentation Analysis from Drone Imagery

    By Andreas Gaich

    A new 3D fragmentation analysis method for muck piles is presented. It works with aerial imagery from UAVs (drones) and handles entire muck piles with minimum user intervention.

    Feb 1, 2020

  • ISEE
    Application of Differential Blasting for Value Chain Optimisation

    By Stephen Mansfield, Saran Sankar

    The Sentinel open pit copper mine, operated by First Quantum Minerals Ltd, is located in the North West province of Zambia. The Sentinel orebody is a sediment-hosted, structurally modified deposit in

    Jan 21, 2025

  • ISEE
    Recent Projects - Emergency Bridge Blasting

    By Brent Blanchard

    As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur

    Jan 1, 2003

  • ISEE
    Microseconds Matter in Monitoring

    By Gregory B. Poole

    Data collected with 16K sampling at a variety of blasting sites (construction, quarry, trench, mine) and monitoring locations was analyzed to effectively show the 16 different 1K readings all based on

    Feb 1, 2020

  • ISEE
    New Technologies in Electronic Blasting For Enhanced Safety and Productivity

    By Raphael Trousselle, William Reisz

    The blasting industry is now well into its second decade of commercial use of electronic detonators. As an increasing number of blasters are introduced to the technology, the benefits are becoming mor

    Jan 1, 2012

  • ISEE
    Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal Mine

    By Ajoy Singh

    A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex

    Jan 1, 2012

  • ISEE
    Kuz-Ram Equation Analysis: A Reparametrization for the Peruvian Case

    By Dennys Huaman, Carlos Rojas

    Using the Levenberg-Marquardt algorithm to reparametrize the Kuz-Ram original model equation of the mean characteristic size and assess the errors of both models and their comparisson using different

    Feb 1, 2020

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024