Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fundamental Tests On The Performance Of High Capacity Pin PilesSMBy Donald A. Bruce
Pin Piles are small diameter, bored, cast-in-place piles used to underpin structures. They were first employed over 40 years ago in Italy, and have been used in the U.S. since the late 1970's. Ho
Jan 1, 1993
-
Case History: Estimating Ground Vibrations Caused By Pile DrivingBy Tracy Brettmann
A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat
Jan 1, 1999
-
Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge (16c93b01-e1c3-48e5-bd32-54e8ea2106cb)By Robb L. Swenson
Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of
Jan 1, 2013
-
The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining StructuresBy Barry C. Slocombe
The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in
Jan 1, 2008
-
Toward Understanding the Seismic Performance of Rigid InclusionsBy J. Tanner Blackburn, James R. Gingery, Lisheng Shao
Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.
Jan 1, 2018
-
A Case Study On Underreamed Piles ? SynopsisBy Rajesh Minda
160 numbers of double bulb underreamed piles were constructed based on the safe loads specified in IS code at Tripura. The pile load tests yielded a much lower capacity. A detailed investigation work
Jan 1, 1996
-
Analyzing Drivability Of Open Ended Piles In Very Dense SandsBy James A. Schneider
The successful installation of long piles driven into very dense sands relies on the occurrence of the reduction in local friction with increased pile embedment, a phenomenon known as ?friction fatigu
Jan 1, 2010
-
Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case HistoryBy Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero
"SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m
Jan 1, 2014
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case HistoryBy Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990
-
Present To Future Design Considerations Of Deep Foundations ? 1. IntroductionBy William S. Gardner
It is certainly an honor to have been invited to address the Deep Foundation's Annual Meeting on such a vast and weighty topic as "Present to Future Design Considerations of Deep Foundations." Ac
Jan 1, 1991
-
Innovative Design At Lake LenexaBy Jacques Moraille
The public is asking for more aesthetic designs if they can be proven cost-effective at providing an appealing element to new dams. Lake Lenexa was designed and built around the idea of providing for
Jan 1, 2009
-
Diaphragm Wall Construction In Hong KongBy Arturo Ressi di Cervia
The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job
Jan 1, 1993
-
Dynamic Pile Testing In Soils Exhibiting Set-Up - IntroductionBy Juan M. Antorena
A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio
Jan 1, 1995
-
Underpass Support Using Secant Pile Walls And Cement Deep Soil Mix Bottom SealBy Carole L. B. Mitchell
The South 180th Street Grade Separation underpass in Tukwila and Renton, Washington, USA, permits vehicular traffic to pass beneath Burlington Northern Santa Fe and Union Pacific railroad tracks. The
Jan 1, 2004
-
Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel ApproachBy Aly M. Mohammad
The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con
Jan 1, 2009
-
Practical Aspects Of Compensation Grouting ? SynopsisBy Philip J. H. Ball
The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial
Jan 1, 2000
-
Deep, Large Diameter Bored Piles In Hong Kong, Two Selected Cases - SynopsisBy Yvone Franco Crosato
The dense population of Hong Kong requires the construction of tall buildings in reclaimed areas or perched on the slopes of the many hills. The large loads to be supported are carried by deep foundat
Jan 1, 2000
-
Preserving The Foundations Of Some Of Boston?s Oldest BuildingsBy Michael J. Atwood
Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood
Jan 1, 2011
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002