Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Seismic source parameters used to monitor rockmass response at Brunswick mine (5a673da7-13e1-42d4-880a-c4441be71d76)By B. Simser, V. Falmagne
"Noranda’s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping techniqu
Jan 1, 2004
-
Factors Affecting the Dissolution of Gold from Refractory Flotation TailingsBy H. U. Ross
"INTRODUCTION Extensive studies have been carried on pure gold to determine the various factors that affect its dissolution in alkaline cyanide solutions. With the extension of milling to refractory o
Jan 1, 1973
-
Some Perspectives on Pyrometallurgical Activities at The University of Toronto COM 2015 - 54th Annual Conference of Metallurgists held in Conjunction with AMCAA - America's Conference on Al AlloysBy A. McLean, M. Barati
In this paper, examples are presented of pyrometallurgical research and associated teaching activities during the past century within the Department of Metallurgical Engineering, now the Department of
Jan 1, 2015
-
Nickel production from low-iron laterite ores: Process descriptionsBy R. A. Bergman
"Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge
Jan 1, 2003
-
Labour Market Intelligence; An update for the Canadian Mining IndustryOVERVIEW OF PRESENTATION ? What is LMI ? Who uses LMI and how? ? Value of LMI to the Mining Industry ? Mining Industry Workforce Information Network (MIWIN) ? The Challenge: Forecasting the futur
May 1, 2009
-
POWERPLAY - Realizing Savings Through Energy ManagementBy Andy Lemay
Vale (previously known as CVRD) is: ? The second-largest mining company by market capitalization (NYSE:RIO) ? Headquartered in Brazil ? Global workforce of over 100,000 employees including outsourc
May 1, 2008
-
A Continuous Improvement Model Linking Planning and OperationsBy Paul Clark
Generation - Profile l 9,726 megawatts (MW) of capacity l 46,877 gigawatt hours (GWh) produced at an average plant availability of 88.4% l 47 facilities in four geographies: Canada; the U.S.; Mexic
May 1, 2004
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Filtering and Shipping Concentrates at BritanniaBy E. R. Packer
"The mill of Anaconda Britannia Mines is located on the eastern shore of Howe Sound, approximately 32 miles north of Vancouver, British Columbia. The mill has a daily capacity of 3400 to 3500 tons and
Jan 1, 1972
-
The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacityBy George Hope, Brigitte Lacouture
"The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted
Jan 1, 2003
-
Circuit Modifications at Westmin Resources Myra Falls OperationsBy C. Veloo
"Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.
Jan 1, 1992
-
The Tectonic, Magmatic and Mineralization History of the Sudbury Structure (4c0ad050-3f5c-4d02-9b1c-381b1fa8e9bb)By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson
"The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of shatter-coned
Jan 1, 1997
-
Cyclone Modelling - Case StudiesBy R. N. Murarka
"Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced
Jan 1, 1992
-
Comparative View on the Metallurgy of the KIVCET-CS and Other Direct Lead Smelting ProcessesBy K. B. Chaudhurl
The thermodynamics of the reactions taking place are examined with the aid of equilibrium diagrams for the Pb-O-S system. Based on investigations of chemical, mineralogical and differential-thermo ana
Jan 1, 1978
-
The Tectonic, Magmatic and Mineralization History of the Sudbury StructureBy Harold L. Gibson, Don H. Rousell, Ian R. Jonasson
"Abstract - The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of sh
Jan 1, 1997
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
Experiences of Two-Stage Classification at Outokumpu ConcentratorsBy M. Tarvainen
"Lately, the development work in closed circuit grinding has mainly been focused on mills and on different types of instrumentation, mathematical models and automation in spite of the fact that the po
Jan 1, 1980
-
Calibration of Level Detection Systems in Flotation Columns Using a Conductivity ProbeBy A. Uribe-Salas, J. A. Finch, B. J. Huls
Froth depth or interface level is an important control variable in column flotation which can influence both grade and recovery. A common method of locating the level is based on sensing the hydrostat
Jan 1, 1989
-
Factors affecting the conversion of calcium cyanamide to black cyanideBy R. A. Bergman, C. A. Pickles, J. M. Toguri
"Black calcium cyanide is utilized mainly as a reagent for gold extraction. It is produced by reacting calcium cyanamide, sodium chloride and calcium carbide at temperatures in the range of 1200°C to
Jan 1, 2002
-
Metallurgical Testing of Gold OresBy T. Salman
Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)
Jan 1, 1975