Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Characteristics of Fluid Coexisting with Granitoids Associated with Miocene Iron-Copper-Lead-Zinc Mineralisation of the Chichibu Skarn Deposit, Japan

    By T Mizuta, H Satoh, M Ogasawara, M Miyata, M Fukuyama

    The Miocene Chichibu granitoids associated with the Chichibu skarn deposit are divided into North Body, South Body and Daikoku altered stock. Orebodies of the Chichibu skarn deposit are mainly distrib

    Jan 1, 2008

  • AUSIMM
    Silver Recovery at North Kalgurli (1912) Limited

    During the past seven years silver recovery has been increased from 9 per cent to over 61 per cent. The changes in plant practiee which have led to this increase are described. Gold room clean-up p

    Jan 1, 1964

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    The critical role of mine planners in the evolution of closure at BHP

    By J Heyes, R Getty, M Sanapala

    Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti

    Sep 18, 2023

  • AUSIMM
    A User-Oriented, Mini Computer Based System for Open Cut Coal Mine Planning

    By Van Hoorn PD

    For the development of BHP's Gregory open cut coal mine in Central Queensland a mini computer was successfully used to assist staff in the evaluation of the deposit and the planning of the mi

    Jan 1, 1978

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Thickening at Karara – The Role of Test Work and Innovative Design

    By G Hart

    As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’

    Jul 11, 2011

  • AUSIMM
    Flotation Cell Design û Experiences with the Jameson Cell

    By Manlapig E. V

    ABSTRACT- I Results are given for a series of tests in which a 300 mm pilot-scale Jameson cell has been used in copper recleaner flotation, and for the flotation of a lead rougher feed. the results

    Jan 1, 1991

  • AUSIMM
    A Casting Method for Artificial Rock Specimens

    By Mostyn G. R

    An important problem in rock engineering is to control the properties of artificial rock. A compaction technique for casting artificial rock specimens with controlled properties is described, i.e.

    Jan 1, 1992

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    CAF Backfill of Primary Stopes at Callie Underground Mine

    Callie underground gold mine is part of the Newmont Tanami Operations, and is now the primary provider of ore to the Granites processing Mill. The Callie underground mine has produced in excess of 7.6

    Jan 1, 2005

  • AUSIMM
    A theoretical goaf resistance model based on goaf gas drainage data

    By Y Wang

    Inadequate goaf gas control may lead to gas exceedances in the ventilation return air, which will trip power in longwalls and cause production stoppage. To effectively control gas emissions, Australia

    Oct 12, 2022

  • AUSIMM
    The Effect of Downhole Survey Uncertainty on Modelled Volume

    Downhole survey uncertainties observed at various De Beers operations prompted an investigation into their possible effect on deposit shape and volume. An accurately surveyed artificial æboreholeÆ was

    Jan 1, 2009

  • AUSIMM
    Technical Note on an Improved Cyclosizing Technique

    The design and operating characteristics of the hydraulic cyclone elutriator were described in detail by Kelsall and McAdam (1963), and the method of operation of the commercially available version, t

    Jan 1, 1974

  • AUSIMM
    Process Mineralogy as a Tool in Modelling Mineral Processing Operations

    By T Vizcarra, G Sandoval, C L. Evans

    One of the challenges in the development of mineral processing simulators is modelling the liberation characteristics of particles produced by comminution circuits. Understanding the mineral character

    Jan 1, 2008

  • AUSIMM
    Experimental and thermodynamic study of the phase equilibria in the NiO-CaO-FeO-Fe2O3 system in air and in equilibrium with metal (Fe-Ni) alloy

    By S Sineva, E Jak, M Shevchenko, D Shishin

    This study represents a part of comprehensive research aimed at integrating nickel into a thermodynamic database constantly developed at Pyrosearch. The behaviour of Ni in calcium-ferrite slags is con

    Aug 21, 2024

  • AUSIMM
    The Lochiel Trial Pit Design and Excavation

    By Sullivan T. D

    The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P

    Jan 1, 1988

  • AUSIMM
    Application of Mobile Primary Crushing and Belt Conveying Systems for Iron Ore Mining

    This paper briefly reviews the background of mobile primary crushers and their current main areas of application. The benefits of applying mobile primary crushing and belt conveying systems are analys

    Jan 1, 2007

  • AUSIMM
    Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop Project

    By Smith G. A

    The scope and complexity of the Melbourne Underground Rail Loop Project and the budget restraints on the planning, design and construction of the works necessitated sound manage- ment procedures fo

    Jan 1, 1981

  • AUSIMM
    The True Values and Uses of Coal Seam Gas Water

    Arrow Energy NL has been operating a number of coal seam gas wells in the Darling Downs region of Queensland. At the time of writing this paper, the region is enduring an extended drought period. The

    Jan 1, 2006