Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Adaptive and Intelligent Control of Cone Crushers

    By Bearman R. A, Parkin R. M

    In the comminution industry cone crushers are widely used for secondary and subsequent stages of size reduction. Traditionally cone crushers have been operated and monitored manually. Alteration of

    Jan 1, 1995

  • AUSIMM
    Managing Underground Risks in Singapore Through Geotechnical Interpretative Baseline Reports

    By L N. Loganathan

    Risk exposure in tunnel projects is extremely high due to various factors such as variability of subsurface conditions, selection of inappropriate design and tunnelling methods, improper risk assessme

    Jan 1, 2008

  • AUSIMM
    Commissioning of Production Blasting with the EXEX 1000 Electronic Delay Detonator Sytem

    By Jones M

    The concept of precise, accurate timing with Electronic Delay Detonators (EDDs) was first seriously addressed in the mid-1980s and much was made of the cheapness and profusion of digital watches in

    Jan 1, 1995

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Assessment of climate risk in the Australian mining industry

    By M Allen

    By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy

    Jul 25, 2018

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • AUSIMM
    Managing Process Water Quality in Base Metal Sulfide Flotation

    By R Dunne, S Hart, G Levay

    While water represents a major proportion of the mineral pulp processed in flotation circuits, relatively little research effort has been committed to understanding and controlling the influence of wa

    Jan 1, 2003

  • AUSIMM
    Application of RISKGATE to Coal Mine Tailings Dams

    By M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe

    RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan

    Jul 16, 2014

  • AUSIMM
    Positive influence of WHIMS concentrate on the sintering performance of Roy Hill fines

    By S Hapugoda, J R. Manuel, X Cao, B D. McDonald, N A. Ware, L Lu

    Roy Hill is a large iron ore mining, processing, railing and port operation in the Pilbara region of Western Australia. Since delivering its first shipments to customers in December 2015, Roy Hill has

    Nov 8, 2021

  • AUSIMM
    Maximising asset value through optimal block by block decisions on marginal material

    By F Phillips, E Deucker, J Kato

    It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari

    Mar 15, 2021

  • AUSIMM
    The Challenger Gold Mine

    By M Sandy, P Bamford

    The Challenger Gold deposit was discovered in 1995 by Dominion Mining Ltd in a remote western area of the Gawler Craton in South Australia. Mine development commenced in 2002 with initial production f

    Jan 1, 2008

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget Mine

    By F K. R Klose

    Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or

    Oct 12, 2022

  • AUSIMM
    Process Control - A Technology for the Present and Future

    By DJ McKEE

    Process control emerged in the mid-1960s as a new and exciting method of improving the performance of mineral processing operations. The early Australian developments, principally in Broken Hill and

    Jan 1, 1992

  • AUSIMM
    Extraction of Tin-Problems and Developments

    The main features and recent developments in the processes of benefication and extractive treatments of tin ores are reviewed. The need for development of processes to recover fine tin, tin from low-g

    Jan 1, 1992

  • AUSIMM
    The Downward Trend of Mining - Infrastructure Costs

    By Glassock C. D

    Most Australian mining projects are becoming smaller, more remote and with lower grades of ore. Their small size has been making it harder for mining companies to absorb the large infrastructure co

    Jan 1, 1997

  • AUSIMM
    Does process control sampling always have to be a compromise?

    By M Singh, R C. Steinhaus, J J. Rust

    Metallurgical process control systems in mineral plants often employ state-of-the-art monitoring analysers in an attempt to optimise plant operations and enhance mineral recoveries. These systems are

    May 9, 2017

  • AUSIMM
    Uralite Dolerite Dykes in Relation to the Broken Hill Lode

    By Edwards A. B

    Re-opening of the old Proprietary mine has provided new exposures of the system of uralite dolerite dykes observed in 19110 by the Geological Sub-Committee of the Scientific Society of Broken Hill. Th

    Jan 1, 1956