Search Documents

Sort by

  • TMS
    Alkaline Arsenic Leaching From Smelter Flue Dust And Leaching Solution Regeneration

    By A. Robles

    The main goal of the present work is to propose a viable alternative for selective arsenic elimination from copper smelter flue dust without the need of a global leaching scheme for all the individual

    Jan 1, 1999

  • SME
    Passivation Of Smectite Impurities And The Reduction of Kaolin Slurry Viscosity

    By R. A. Lowe, P. B. Malla

    Smectite is a common impurity in the kaolins of Georgia.This impurity is harmful to the low-shear rheology of kaolin slurries in concentrations as low as a few weight percent. The deleterious effect

    Jan 1, 1999

  • AUSIMM
    Classification and Control of Hazards in Underground Mines in Poland

    By M Malec, J Szczerbinski

    Hazards in underground mines are concomitant with the mining of mineral deposits and have their source in a minerÆs work environment. The authors of the paper have undertaken a trial classification of

    Jan 1, 1999

  • SME
    Enrichment of the manganese to iron ratio of ferruginous low- grade manganese ore using solid reductant

    By Y. V. Swamy, B. Bhoi, H. S. Ray

    Low-grade manganese ores with low Mn/Fe ratios can he enriched through selective carbon reduction of iron oxide to magnetite followed by magnetic separation o f the magnetite. Thermogravimetric ana

    Jan 1, 1999

  • DFI
    What Has Been Learned About Drilled Shafts From The Osterberg Load Test - Summary

    By Jorj O. Osterberg

    The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc

    Jan 1, 1999

  • SME
    Drill and Blast Operations and Water Control Measures atLake Mead Intake No. 2

    By Richard W. Kimball, Richard F. Coon

    This paper describes drill and blast excavation and groundwater control measures at the Lake Mead Intake No. 2 project. The construction includes a deep access shaft, intake shaft, surge chamber, fore

    Jan 1, 1999

  • AUSIMM
    VHMS Mineralisation in NW Papua New Guinea

    By K Akiro

    Volcanogenic massive basemetal sulphide and gold mineralisation of predominantly low sulphidation style has been located within Lower Tertiary basaltic and felsic volcanic and sedimentary sequences at

    Jan 1, 1999

  • AUSIMM
    High Quality Pig Iron from AusIron Processing

    By Fogarty J. G H

    Ausmelt Technology has a unique capability of removing the impurities, phosphorus and sulphur, from the feed materials to the process. Sulphur is removed to the gas phase almost completely because of

    Jan 1, 1999

  • CIM
    The Parga Catalana

    By P. Molera

    "In Catalonia, between the 10th century and 1878, some installations were developed which at first were called ""factories"" and later ""fargas"", since they manufactured iron and steel of low carbon

    Jan 1, 1999

  • SME
    Upper Rouge Combined Sewage Overflow Storage and Treatment Tunnel

    By F. J. Klingler, K. M. Swaffar, M. M. Rabbaig

    The Detroit Water and Sewerage Department has undertaken a $1.2 billion effort to capture and treat combined sewage overflows from various outfalls along the Detroit and Rouge Rivers in Detroit, Michi

    Jan 1, 1999

  • SME
    Application of safety engineering to reduce the risk of haulage accidents in surface coal mines using dump trucks

    By K. Pathak

    Loaders and dump trucks are the most commonly used surface-mining equipment. Negligence of the safety-engineering aspects of dump trucks may result in serious accidents in a mine. A reduction in the r

    Jan 1, 1999

  • CIM
    Optimizing inventory stockpiles and mine production: An application of separable and goal programming to phosphate mining using AMPL/Cplex

    By M. L. Smith

    "In the Phosporia formation of SE Idaho, ore quality varies by depth, seam and distance along strike; phosphorus recovery is sensitive to these variations. Plant ore feed can be blended over time to m

    Jan 1, 1999

  • SME-ICGCM
    Pillar Collapse at Welgedacht Colliery, South Africa: A Case Study

    By J. Nielen van der Merwe

    During the process of pillar extraction at the Welgedacht Colliery, an unexpected pillar collapse resulted in the entrapment of equipment. The area was visited soon after the event to evaluate the sta

    Jan 1, 1999

  • TMS
    The Chilean Copper Smelter Management Way

    By Sergio Demetrio

    Over a period of nearly a hundred years throughout this century, the company direction and management of copper smelters in Chile has evolved from one characteristised by a paternalistic, autocratic s

    Jan 1, 1999

  • SAIMM
    The Increasing Role Of Direct Reduced Iron In Global Steelmaking

    Direct reduced iron (DRI), produced by the reaction between iron ore and reducing gasses, is used as a source of low-residual iron, in addition to ferrous scrap and pig iron, in the production of stee

    Jan 1, 1999

  • SME
    Backfill --Whatever It Takes (fcae3bd4-481a-4110-9923-93fcb6b0528e)

    By D. Kump

    The Bullfrog Mine is an underground gold mine that uses the underhand-cut-and-fill mining method. The portal was established on June 18, 1991. Mining is expected to be completed by the summer of 1999.

    Jan 1, 1999

  • SME-ICGCM
    Skin Failure Of Roof And Rib In Underground Coal Mines

    By Eric R. Bauer

    Skin failures of roof and rib in underground coal mines continue to be a significant safety hazard for mine workers. Skin failures do not usually involve failure of the support systems but result from

    Jan 1, 1999

  • TMS
    Two-Phase Flow Numerical Simulation of Molten Steel and Argon Gas in a Continuous Caster Mold

    By Toshia Ishii, Jun Kubota, Noriko Kubo

    "For steel continuous castings, it is essential to control molten steel velocity at the meniscus, since the velocity is closely related to surface defects on the resultant products. Argon gas is suppl

    Jan 1, 1999

  • TMS
    Copper Ore Preconcentration By Heavy Media Separation For Reduced Capital And Operating Costs

    By Walter E. McCulloch

    Recent laboratory bench scale and pilot plant metallurgical tests at Mountain States R and D International have demonstrated that some copper ores because of relatively coarse copper sulfide mineraliz

    Jan 1, 1999

  • AUSIMM
    Tunnelling Projects in Singapore

    By A J. Burchell

    The introduction reviews the tunnelling carried out in Singapore since the early 1980s. Between 1983 and 1990, Phases 1 and 2 of the mass rapid transit system were constructed. These included some 20

    Jan 1, 1999