Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME-ICGCM
    A System to Provide Early Warning on Impending Goaf

    By Gift Makusha

    Total extraction mining of coal is being undertaken on a small scale by Anglo Coal South Africa. Longwall mining has been done in the group at New Denmark colliery since the 80s and recently the compa

    Jan 1, 2005

  • SME-ICGCM
    A Resin Quality Testing Procedure for Collieries

    By D. Minney

    The quality of resin used in South African collieries is currently controlled according to South African Bureau of Standards, "SABS-1534:2002". It has however been found that resin which passed the SA

    Jan 1, 2005

  • SME-ICGCM
    Numerical Modeling as a Tool to Predict Pillar Condition and Assist in Mining Sequencing

    By P. Palmer

    Using 3D numerical modeling as a tool to predict rock behavior during mining extraction is still an uncommon practice at many underground operations. This paper will discuss how 3D numerical models we

    Jan 1, 2005

  • SME-ICGCM
    Development of a New Roof Bolt Technology to Improve Gate- Road Performance

    By Vince Caggiano

    The newly developed Hilti OneStep roof bolt combines the standard 5-step anchoring process (i.e. drilling, transfer of drill steel, insertion of resin, insertion of rod and tightening) into one easy o

    Jan 1, 2005

  • SME-ICGCM
    Test Method for Assessing Water Degradation Potential of Coal Measure Rocks for Analyses of Floor, Roof, and Ribs

    By G. J. Hasenfus

    There are no known published methods of estimating the degradation of coal measure rocks by water that are simple and efficient, yet still provide a quantitative, meaningful value for assessing the st

    Jan 1, 2005

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Development of the Laboratory Short Encapsulation Pull Test for a Revised British Standard on Rock Reinforcement Components Used in Coal Mining

    By D. Bigby

    The current British Standard on rock reinforcement components used in coal mining (BS7861:1996) employs the axial double embedment tensile PET) test to determine the main system load transfer performa

    Jan 1, 2005

  • SME-ICGCM
    The Influence of the First Layer Thickness of Immediate Roof on its Stability

    By Lixun Kang

    Bedded structure is the characteristics of coal measures strata. Bedding planes, coal streaks and soft rock bands existing in roof strata destroyed its continuity in the direction perpendicular to the

    Jan 1, 2005

  • SME-ICGCM
    Experimental and Numerical Methodology Assessment of Load Transfer Capacity of Bolts

    By Naj Aziz

    n Australia, the common method of laboratory testing of bolt for load transfer capacity determination is by short encapsulation push testing. Some concerns are raised about the validity of the test me

    Jan 1, 2005

  • SME-ICGCM
    Roof Control and Roadway Support Design in the #9 Coal Seam, Wuhushan Coal Mine, China

    By Yundong Ma

    In this paper the dynamic process of rock deformation and failure in the roadways of the #9 coal seam, Wuhushan Coal Mine by was simulated using the software "Rock Failure Process Analysis System (REP

    Jan 1, 2005

  • SME-ICGCM
    Implication of Highly Anisotropic Horizontal Stresses on Entry Stability at the West Elk Mine, Somerset, Colorado

    By J. F. T. Agapito

    Overcore measurements at the North Fork Valley (NFV) coal mines in western Colorado have shown that horizontal stresses are highly anisotropic. Measurements have been made in four mines at various dep

    Jan 1, 2005

  • SME-ICGCM
    Development of a Laboratory Facility for Testing Shear Performance of Installed Rock Reinforcement Tendons

    By L. Mahony

    This paper describes the design, construction and commissioning testing program for a laboratory facility at the School of Mining Engineering, UNSW, Australia, aimed at evaluating reinforcement tendon

    Jan 1, 2005

  • SME-ICGCM
    Analysis of Entry Stability Associated with Multi-seam Mining - A Case Study

    By Jisheng Han

    Interaction effect exists when two or more neighboring seams are mined. The mining activity in one seam causes stress redistribution and strata movement in both the roof and floor. When the thickness

    Jan 1, 2005

  • SME-ICGCM
    Stability Mapping System

    By Quanxi Wang

    This paper presents a new stability mapping system which tightly integrates structural and geologic mapping with geo- mechanical stress analysis for use in support design and mine plan- ning. The stru

    Jan 1, 2005

  • SME-ICGCM
    Mechanical Response of Split-Set Rock Bolts in Squeezing Ground

    Researchers from the National Institute for Occupational Safety and Health's Spokane Research Laboratory installed Split-Set rock bolts instrumented with strain gauges to document the mechanical

    Jan 1, 2005

  • SME-ICGCM
    The Slope Stability Assessment in the Wall Overlooking the Sungun Copper Concentrator Plan

    By S. Mehrdad Heidari

    The concentrator plant is located near a very high (105m), large (- 500m) and steep (a, > 45' ) wall. Geologically, the wall was composed of very complicated formations and broad range of soils a

    Jan 1, 2005

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Highwall Mining in a Multiple-seam, Western United States Setting Design and Performance

    By Tom Vandergritft

    With advances in system design driving higher productivity, safety, and coal recovery, highwall mining is becoming an attractive option for extending reserve life at surface mines. Typically, highwall

    Jan 1, 2005

  • SME-ICGCM
    Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)

    By Frank E. Chase

    The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar

    Jan 1, 2005

  • SME-ICGCM
    Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004

    By Lewis Dr. Wade

    It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO

    Jan 1, 2005