Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sampling In The South African Minerals Industry
Although not fully accepted in South Africa, the Theory of Sampling originally proposed by Pierre Gy is fast becoming the cornerstone of sampling practice throughout the world. The growing acceptance
Jan 1, 2014
-
The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium
By W. S. Steinberg
Keywords: Pyrometallurgy, furnace, open slag bath, Evraz, Highveld In 1963, the full-scale engineering study for the development of an Iron, Steel, and Vanadium plant was initiated. This was the
Jan 1, 2011
-
Note: The development of AGIT AIR flotation machines
By J. P. Dreyer
Note: The development of AGIT AIR flotation machines by J. P. DREYER HISTORY The first AGITAIR flotation machine was developed and patented in 1932. It has a capacity of 5 ft3t and was named the No. 2
Jan 6, 1976
-
Measuring and Modelling of Density for Delected CaO-Al2O3-MgO Slags
By J. E. Xu, J. Y. Zhang, M. Q. Sheng, K. Wan
"SynopsisThe densities of selected CaO-Al2O3-MgO slag systems were measured at 1823K by the Archimedean method. Thirteen different slag compositions were chosen based on different levels of the MgO co
Jan 1, 2015
-
Development Of A Novel Three-Step Sx Process To Recover Copper From An Acidic Solution
By Baruch Grinbaum, Edwin Bwalya, Robert Minango, Deogratias Bukunkwe
Solvent extraction of Cu from acidic leach, using an oxime extractant, e.g. LIX 984 or Acorga is a well known and established process. As the process advances, Cu is extracted to the solvent and
Jan 1, 2005
-
Problems Encountered in the Operation of a New Colliery
By A. A. Oakes, P. M. C. Wilson
This paper describes some aspects of the planning of a new colliery which commenced production in the Middleburg district in 1966. An account is given of some of the problems encountered in the early
-
Development of an Atmospheric Datamanagement System for Underground Coal Mines
With increasing demand for real-time monitoring of mine parameters, the requirement for appropriate data management in many mining applications is also increasing. This includes atmospheric monitoring
Jan 1, 2014
-
Electrical Energy Management In The Ferroalloy Business
By P. J. Brereton-Stiles, M. S. Rennie, N. Singh
Ferroalloy producers are large-scale users of electrical energy, which in many countries is in short supply and increasingly expensive. Preheating and/or pre-reduction using natural gas, recycled furn
Jan 1, 2004
-
The Development And Implementation Of Industrial Hydrometallurgical Gallium And Germanium Recovery
The Gordonsville Operation of Pasminco US Inc. along with the Center for Advanced Mineral and Metallurgical Processing (CAMP) at Montana Tech studied, developed and implemented a pilot scale hydrometa
Jan 1, 2008
-
Computer Aided Demand Management for Large Scale Gold Mining Operations
By I. E. Lane
Conventional demand management techniques invariably fail to offer optimum control flexibility in an operationally complex gold mining environment. An improved control system for electrical demand man
Jan 1, 1987
-
Grab sampling for underground gold mine grade control
Geologists in some underground gold mines collect grab samples from broken ore piles or trucks as a method of grade control. It is often known as muck sampling. Generally, the goal of grab sampling is
Jan 1, 2009
-
PGM Recovery from a Pregnant Leach Solution Using Solvent Extraction and Cloud Point Extraction: A Preliminary Comparison
By L. Makua, K. Langa, Ndlovu. S., C. Saguru
"Global demand for the three platinum group metals (PGMs) Pt, Pd, and Rh has been steadily growing due to their widespread use in emission control, industrial catalysis, and numerous other application
May 1, 2019
-
Gautrain Tunnels: Surface Vibration And Ground-Borne Noise
By J. L. van Niekerk
The proposed Gautrain Rapid Rail Link (GRRL) will require approximately 15 km of double or twin high-speed rail track tunnels located for the greater part beneath the northern suburbs of Johannesburg,
Jan 1, 2004
-
Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc ? Summary (4cb2c708-51b2-4b55-8a1e-390793b28d6a)
By H. F. Fuls
The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl
Jan 1, 2008
-
The Application Of The Analytical Hierarchical Process In Complex Mining Engineering Design Problems - Synopsis
By P. Kluge
Mining engineers frequently encounter complex design problems for which the critical components of the design are difficult to quantify or compare. Teams of people typically work on these designs and
Jan 1, 2011
-
Physical And Numerical Modelling Of Rock Fracture
By M. U. Ozbay
This paper presents an overview of the research that has been carried out to improve the understanding of the fracture processes occurring in rock under high levels of stress. The onset and growth of
Jan 1, 1996
-
SPOTLIGHT on the continuous casting of steel
By J. P. Hoffman
The School on the Continuous Casting of Steel, the second school organized by the Technical Programme Committee-Metals Technology of The South African Institute of Mining and Metallurgy (SAIMM), was h
Jan 1, 1988
-
Application of an environmental valuation approach that incorporates externality costs in sustainability decision-making of the metallurgical sector - Synopsis
By M. Nyoka
Consideration of the economic, environmental, and social impacts associated with the life-cycle of a technology is of increasing importance for decision-making in industry. It has been suggested that
Jan 1, 2007
-
Evaluation Of Processing Options For The Treatment Of Zinc Sulphide Concentrates At Skorpion Zinc - Synopsis
By H. F. Fuls
Skorpion Zinc, an integrated zinc mine and refinery located in the south of Namibia, has a production capacity of 150 000 t/a of special high grade (SHG) zinc. The Skorpion zinc oxide resource will be
Jan 1, 2013
-
An Analytical Solution to the Batch-Comminution Equation
By R. P. King
An Analytical Solution to the Batch comminution Equation R. P. King, Pr. Eng., B.Sc. (Eng.), M. Se. (Eng.), Ph.D. (Visitor). An analytical solution to the batch-grinding equation is presented in terms