Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • ISEE
    Safety Considerations when Using Short Lead, (5 cm), Magnadet Detonators

    By Lon D. Santis

    This paper reports on an evaluation of the safety characteristics of short lead, 5 centimeter (cm), Magnadet1 detonators. The Magnadet initiation system uses magnetic induction principles to transfer

    Jan 1, 1992

  • ISEE
    Semi-Automated Fragmentation Assessment

    By Glenn Ludwig, Stephen H. Chung

    Fragmentation has a direct impact on mine costs and productivity. Computer programs have been developed to calculate fragmentation using data on the properties of the explosive, the characteristics of

    Jan 1, 1992

  • ISEE
    Advantages and Disadvantages of Down-the-Hole Hammer Blasthole Drilling vs. Rotary Drilling in Large Scale Open Pit Surface Mining

    By George D. Raitt, Rudy Lyon

    Until fairly recently, Down-The-Hole (DTH or DHD) hammer drilling was never really a factor in large scale open pit surface mining. It was a method confined to water well drillers, aggregate quarries

    Jan 1, 1998

  • ISEE
    A Blasting Efficiency Descriptor "Bed" (for surface blasting)

    By Evan Jannoulakis, Wilfrid Comeau

    Using the Scaled Distance (SD) and the vector sum Peak Particle Velocity (PPVvs) from a single delay, preferably single blasthole, in a shot, a number is derived which has shown itself to be consisten

    Jan 1, 1998

  • ISEE
    Acoustic Response of Structures to Blasting

    By Braden Lusk

    This paper includes results from analysis of recorded Acoustic Responses of Structures to Blasting. The analysis was performed to determine specific characteristics of sounds experienced inside homes

    Jan 1, 2009

  • ISEE
    Blasting on the Iroquois Trail

    By Charles Joyce, William C. Burkle, Dan Murphy

    Rare indeed has a major cross country natural gas pipeline met and surmounted such obstacles as the Iroquois Gas Transmission Line from Canada to Long Island, New York. Of the 370 miles long length a

    Jan 1, 1992

  • ISEE
    Staggered Parallel Cut in Small Headings the Most Cost-Reducing Alternative to All Other Cuts in Mechanized Drifting

    By Max Pena Woolcott, Winfried Rosenstock, Maria Chappuis, Walther Hennig

    "In a Peruvian-German Technical Cooperation project for the Mining Sector the ""Milpo-cut"" along with the electric initiation system has been successfully implemented in a Peruvian metal-ore mine.Spe

    Jan 1, 1994

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Dr. Calvin J. Konya, Anthony Konya

    Beginning on the Niagara Power Project, presplitting became a widely used blasting technique to obtain smooth walls in mining and construction projects reducing scaling, creating more stable pits, all

  • ISEE
    What Every Defense Lawyer Wished his Blasting Company Clients Knew

    By Jay P. Tobin

    This paper will address the legal standards applicable to construction blasting lawsuits and offer best practices suggestions for pre-blast inspections, documenting the construction blasting work, rec

    Jan 1, 2015

  • ISEE
    Impact of Blasting on Downstream Process to Maximize the Profitability of Mining Industries

    By Kyle Wagner, William Joa, Colter Angell, Catherine Johnson, Marty Langenderfer, David Doucet

    The goal of any business is to seek the maximum profitability for the organization through optimization the use of resources, processes and the application of new technologies. An analysis of various

    Jan 1, 2019

  • ISEE
    Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan India

    By H. Venkatesh, Balachander R.

    This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near

    Jan 1, 2006

  • ISEE
    The Importance of Explosive Energy on Mining Costs

    By John T. Day, Lex L. Udy, Mark L. Thomas

    When we consider that the purpose of blasting is to fragment rock or ore so it can be subsequently handled and processed, we can see that the cost of blasting, in reality, affects all downstream steps

    Jan 1, 1987

  • ISEE
    Professionalism in Drilling and Blasting in Surface Coal Mining Operations

    By Dean E. Albon

    The author gives a brief resume of his observations of drilling and blasting supervision in surface coal mines during the past thirty years and recommendations for upgrading this supervision to the ca

    Jan 1, 1979

  • ISEE
    Cooperation in Regulations

    By John Petty, John Loviza

    Single sentence describing content-- "The best ally an Explosives Engineer can have in a court of law is a regulations enforcer stating all codes and standards were met on a jobsite".

    Jan 1, 1996

  • ISEE
    Drilling and Blasting Practices

    By Thomas P. Mahoney

    Phelps Dodge Corporation's Tyrone Mine is a large open pit copper operation located in the southwestern corner of New Mexico. The Tyrone concentrator processes approximately 50,000 tons per day of cop

    Jan 1, 1986

  • ISEE
    Close-In Shockwave Characteristics In Saturated Sand

    By L C. Taylor, H U. Lesiste

    This paper provides a preliminary description of the properties of the output pressure (shock) wave of an end initiated, cylindrical charge of low height to diameter ratio in saturated sand. The prope

    Jan 1, 2013

  • ISEE
    Mining and Fragmentation: Proposal for a More Efficient Mine Management

    By Ivan Carrasco, Benjamin Cebrian

    Mining companies have traditionally organized their structure around a scheme easy to manage: Mining Department and Mill Department. In a challenging landscape for mining, with decreasing grades, incr

    Jan 1, 2014

  • ISEE
    Attenuation of Blasting Vibrations in South Florida, Part II

    By Greg Mclellan, Mark Johnson, John Pepper

    In this paper, the measured vibrations are plotted in terms of the individual PPV components versus Scaled Distance (SD) on logarithmic scales. The maximum PPV is pIotted on a separate graph and equat

    Jan 1, 2001

  • ISEE
    Trench Blasting Guidelines & Pitfalls

    By Vic Sterner

    As cities and towns continue to grow, the need to install sewer, water, gas and other utilities becomes a necessity and the blasting of trenches for these service lines probably constitutes one of the

    Jan 1, 2004

  • ISEE
    Impact of Open-Pit Blasting on the Multi-Seam Workings of Adjoining Underground Coal Mine

    By Ajoy K. Singh, B Mohanty, P K. Singh

    A study was conducted to investigate the damage potential to underground multiseam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal exp

    Jan 1, 2011