Case Study Of Three Bidirectional Static Load Tests For Bored Piles At Sabana Costa RicaBy Mauricio Coto
Three bidirectional static load tests (BDSLT) were executed on bored concrete piles, as part of the permanent foundations for two buildings sites located at the Sabana, San Jose, Costa Rica, separated
-
Case Study on the Frederick Douglass Memorial Bridge and the use of Large Diameter Open End Steel Pipe Piles, Washington, DCBy Karl A. Higgins, Michael D. Venezia
The South Capitol Street Corridor Project is one of the District Department of Transportation’s (DDOT) largest projects, and is currently under construction. This case study will focus on the design o
Jan 1, 2019
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic EnvironmentBy Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban SlopeBy Mike Fabius
The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o
Jan 1, 2006
-
Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial DepositsBy John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura
"This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par
Jan 1, 2017
-
Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar StrainmetersBy Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula
"This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat
Jan 1, 1900
-
Case Study: MGM Casinonational Harbor, Washington, DC Displacement Cast-In-Place Piles in Coastal Plain SoilsBy Karl A. H iggins, James P. Racine
"Displacement Cast-in-Place (DCIP) piles are not a common deep foundation type in the Washington, DC Metro Area market. As a result, less regional data is available for these foundations compared to o
Jan 1, 2017
-
Case Study: Natomas Levee Improvement Program Cutoff WallsBy Matthew D. Marks
"The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica
Jan 1, 2017
-
Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In VirginiaBy Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed
Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw
-
Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank ErosionBy Brandon Smith, William Bohlen
Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al
Jan 1, 2019
-
Case Study: The Use Of Post Tensioned Piles For Wind Turbine FoundationsBy Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi
Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical SolutionsBy John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019
-
Cast Insitu Piling For The King's Wharf Project, Sydney, AustraliaBy Slav Tchepak
The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin
Jan 1, 2000
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Cement Deep Mixing in Lach Huyen Port Infrastructure Construction Project in Northern VietnamBy Masakazu Takano, Koji Suzuki, Naotoshi Shinkawa
"Cement deep mixing (CDM) method successfully applied to a marine construction project in northern Vietnam is reported. The method is classified as wet method, in which cement slurry is injected into
Jan 1, 2015
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015