Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Trump International Is OPA Winner"Standing 92 stories high and just over 1,362 ft tall, Chicago’s Trump International Hotel and Tower is perfectly positioned at the center of one of the world’s most impressive skylines.The Tower serv
Jan 1, 2009
-
TTMJ – The New System for Slurry (Diaphragm) Wall JointsBy Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley
"TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-
Jan 1, 2017
-
Tubex-Grout-Injected-Piles For The Parenco Paper Mill In Renkum (The Netherlands) - The Application Of Tubex-Groutinjection-Piles For The Parenco Paper Mill PM-1 In Renkum (The Netherlands)By Sikko Doornbos
For the extension of the Paper Mill of Parenco in Renkum, the Netherlands, the application of a pile foundation was required. The demands for this pile foundation were very explicit a vibration free a
Jan 1, 1987
-
Tunnel Construction with Pressed-In Sheet Pile Walls Next to High-Rise Residential BuildingsBy Takefumi Takuma, Tsunenobu Nozaki
Light rail transit (LRT) systems have been built in cities all over the world in order to cope with increasing population and heavy car traffic in their downtown cores and surrounding areas. Light rai
Oct 7, 2024
-
Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability ChallengesBy Shawna Munn, Jakub Hudler
This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines
Jan 1, 2018
-
Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NYBy Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand
"The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The
Jan 1, 2016
-
Two Miles of Anchored Bulkhead Supports Howard Frankland Bridge MegaprojectBy Casey D. Shanahan, Dustin Walkenhorst
The Howard Frankland Bridge megaproject consists of a new, 3.2-mile (5.1 km) bridge extending I-275 across Tampa Bay. Two steel sheet pile and combi-wall bulkheads with a total wall length of over 11,
Oct 31, 2023
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building HubBy Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration ResistanceBy Glen Mann, H. G. Vestberg, Robert D. Holtz
"Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically
Jan 1, 2005
-
Ultimate Lateral Load of a Pile in Cohesive Soil under Static LoadingBy Dileej M. Dewaikar, Poonam A. Patil
"In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met
Jan 1, 2005
-
Ultimate Lateral Resistance of Piles in Cohesive SoilBy Lassaad Hazzar
The ultimate lateral resistance of piles in cohesive soil is studied using the well-known finite difference code, FLAC2D. The Modified Cam Clay (MCC) constitutive relation is adopted in the analyses t
Aug 1, 2013
-
Ultimate Pullout Capacity Of Batter PilesBy M. R. Madhav
The ultimate pullout capacity of single batter piles has been presented in literature in three contradictory trends. These trends are: the pullout capacity of a single batter pile increases, remain al
Jan 1, 2010
-
Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in ClayBy Kjell Karlsrud
"Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o
Jan 1, 2014
-
Ultimate Skin Friction Of Single Batter Piles In Sand ? SynopsisBy A. M. Hanna
This paper presents the experimental investigation on the ultimate skin friction of batter piles. The model piles were pushed in medium dense sand deposits at different inclinations up to 30 with resp
Jan 1, 2010
-
Ultimate Soil Pressures For Pile Groups In Soft Clay Subjected To Lateral Soil MovementsBy L. F. Miao
Studies were carried out to investigate the ultimate soil pressure acting on pile(s) undergoing lateral soil movement in soft clay. A special apparatus has been designed to apply a uniform rectangular
Jan 1, 2008
-
Ultimate Uplift Capacity Of Piles And Pile Groups In Granular SoilBy B. M. Das
Laboratory model test results for the ultimate uplift capacity of rough rigid single and group piles embedded in sand have been presented. Model tests on single piles were conducted in loose, medium,
Jan 1, 1989
-
Ultimate Uplift Capacity Of Single And Group Piles In Clay ? SynopsisBy B. M. Das
Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes
Jan 1, 2010
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - IntroductionBy Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Uncertainties Arising During Drilling And Performance Of Flight Auger - Cast PilesBy F. M. Abdrabbo
Flight auger bored piles are formed by screwing a continuous flight auger into the ground, and pumping cement/sand grout or concrete down the hollow stem of the auger as its withdrawn. The auger is dr
Jan 1, 1993