Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Estimation of Bulk Density for Mineral Resource Reporting

    By G. J. Arseneau

    Mineral resource statements are reported as tonnage and grades. While great care is placed on generating a reliable estimation of grade, the determination of bulk density for resource estimation is of

    Aug 1, 2013

  • CIM
    Estimation of Coal Quality Using Indicator Kriging Applied to Data Obtained By Borehole Geophysical Logging

    By Tiago Webber

    Mineral resources estimation comprises basically two stages: (i) data collection, analysis and validation, and (ii) the estimate of the grades and tones of the deposit. The most applied method for sam

    Oct 1, 2009

  • CIM
    Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in Canada

    By D. J. Farmer

    Mining hoists are major components of any underground mine, however, the detailed design work required to get the actual power required for a particular hoist is outside the scope of preliminary feasi

    Jan 1, 1997

  • CIM
    Estimation of Hydraulic Conductivity of Underground Rock Cavern: A Case Study

    By Zhiye Zhao, Jianping Sun, Zhipeng Xu

    "The subsea rock cavern project is an underground storage facility. For cost-effective and safe excavation, the risk caused by the groundwater seepage into the rock cavern must be addressed. As one of

    Jan 1, 2015

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • CIM
    Estimation of large open pit haulage truck requirements

    By G. H. Blackwell

    Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement

    Jan 1, 1999

  • CIM
    Estimation of leakage in ventilation ducting

    By G. Auld

    "A simple method is presented whereby the additional quantity and static pressure necessary to compensate for ventilation duct leakage may be estimated using the circular reference functions of modern

    Jan 1, 2002

  • CIM
    Estimation of liberation

    By T. Yalcin

    "This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,

    Jan 1, 1985

  • CIM
    Estimation of Rock Block Strength

    By M. Pierce

    Empirical relations exist for the estimation of rock block strength at scales larger than standard core sizes. Two recently published relations account for the significant impact that microflaws (pore

    May 1, 2009

  • CIM
    Estimation of Shock Loss Factors At Shaft Bottom Junction Using Computational Fluid Dynamics and Scale Model Studies

    By T. Purushotham, B. Samanta

    ABSTRACT; The shaft bottom junction in a mine ventilation system is an important source of shock loss due to the combined effect of bend and area change. The occurrence of high-volume ?ow rates throug

    Jan 1, 2010

  • CIM
    Estimation of Stresses and Properties of Coal–Rock Mass Based on Inverse Problem Solution

    By L. A. Nazarova, M. Vandamme, L. A. Nazarov, R. I. Rodin

    "The paper describes a new method of interpreting the “canister test” data for the quantitative estimation of gas-kinetic parameters of coal bed based on the developed model of gas emission from coal

    Jan 1, 2015

  • CIM
    Estimation of the Average Value of Gold Ore

    By W. A. Jones

    THE estimation of the average value of gold ore involves many considerations, among them the correct sampling of the deposit, the dilution by waste, and the loss of high-grade fines. It is a common ex

    Jan 1, 1943

  • CIM
    Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity Measurements

    By M. Pötsch, A. Kluckner, P. Söllner, W. Schubert

    "The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass

    Jan 1, 2015

  • CIM
    Ettringite formation in lime-remediated mine tailings: I. Thermodynamic modeling

    By F. P. Hassani, J. F. Boily, A. M. O. Mohamed, M. Hossein

    The optimal geochemical parameters required to form ellringite in a lime-remediated site have been investigated with the use of thermodynamic modelling. The speciation of sulphate and 10 metals analyz

    Jan 1, 1995

  • CIM
    Etude du drainage superficiel et souterrain de la -mine à ciel ouvert des Mines Gaspé, Murdochville, Québec

    By A. Liard, H. Sommelet, G. Sauriol

    "Description des études qui ant conduit à la conception spécifique du système de drainage de la mine à ciel ouvert. Les approches différentes sont examinées ainsi que la valeur du système recommande.I

    Jan 1, 1981

  • CIM
    Etude Iithogéochimique des roches volcaniques dans la region de la mine Lemoine, district de Chibougamau, Quebec

    By André Gobell

    "La distribution des éléments majeurs dans une séquence de roches volcaniques felsiques, la formation de Waconichi, au sud de Chibougamau, indique que les roches pyroclastiques du secteur ouest de ce

    Jan 1, 1980

  • CIM
    Etudes de libération des minerais à I'Université Laval (Quebec)

    By J. C. Marchand, M. A. Berube

    "L'objectif principal recherché lors du broyage d 'un minerai est de libérer adéquatement ses valeurs utiles en vue de leur concentration ultérieure. La pratique courante consiste à tenter d

    Jan 1, 1983

  • CIM
    Evaluating Copper Sulfide Leach Practices with a Heap Leach Model

    By G. P. Cooper

    A comprehensive computational heap leach model was used to evaluate options for operating a chalcocite-ore heap leach process. The stockpile leach model is based on the computational fluid dynamic sof

    Jan 1, 2007

  • CIM
    Evaluating Decision-Focused Stakeholder Consultation at EKATI Diamond Mine

    By Andrew Thrift

    Overview ? Problem ? Research question ? Literature review ? Methodology ? Results ? Discussion and recommendations ? New developments Problem ? Increasingly higher expectations ? Inadequate

    May 1, 2006

  • CIM
    Evaluating Immediate Mining Induced Ground Movement by Monitoring the Performance of the Primary Support System

    By Wei Wei

    Mining induced ground movement and/or stress redistribution could cause ground instability issues. This is particularly true when the extraction of large stopes is done with one or two large productio

    Jun 1, 2012