Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in Canada

Canadian Institute of Mining, Metallurgy and Petroleum
D. J. Farmer
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
2
File Size:
68 KB
Publication Date:
Jan 1, 1997

Abstract

Mining hoists are major components of any underground mine, however, the detailed design work required to get the actual power required for a particular hoist is outside the scope of preliminary feasibility studies. Nonetheless, a hoist is costly. Therefore, an accurate estimate is needed for the design parameters and the power required. There are two methods available, namely, the O’Hara method and the Society of Mining Engineers’ method. Tests were done for both methods employing nine friction hoists and 19 drum hoists currently in use at Canadian mines. The O’Hara method provided unacceptable results for both friction and drum hoists. While, the SME method was designed for American regulations and factors of safety which often differ significantly from Canadian ones, good results were obtained. The two relationships deter-mined were simply to add 5% to friction hoist design and to add 4% to drum hoist design. Modifying the SME method by these two factors will allow the hoisting system determined by the SME method to be within the error for a prefeasibility study.
Citation

APA: D. J. Farmer  (1997)  Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in Canada

MLA: D. J. Farmer Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in Canada. Canadian Institute of Mining, Metallurgy and Petroleum, 1997.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account