Search Documents

Sort by

  • TMS
    Assessment Of The Performance Of The Tundish Of A Six Strand Continuous Casting Unit Of Companhia Siderurgica Belgo-Mineira (CSBM), Brazil Using Physical Modeling

    By Mônica Suede Santos Silva

    This work describes characterization of the performance of the tundish of a six strand continuous casting unit of the Companhia Siderúrgica Belgo Mineira, João Monlevade, Brazil using physical modelin

    Jan 1, 2003

  • AUSIMM
    Assessment of the potential for formation of acid rock drainage from open pit, run of mine waste at the Porgera Mine, Papua New Guinea

    By Stewart R

    Potential acid rock drainage from the destruction of metalliferous sulph-ides is recognised as a critical factor in the design and economics of any mining venture. While this realisation is relatively

    Jan 1, 1994

  • SME
    Assessment of the Potential for Radioactive Pollution at a Phosphogypsum Waste Dump and Possibilities for Ra226 Removal

    By V. T. Vacariu, P. D. Georgescu, N. Tomus

    To assess the potential for radioactive pollution unique to the environmental conditions of the Bacau phosphogypsum waste dump, surface samples were taken, drillings were performed on the entire waste

    Jan 1, 1999

  • SAIMM
    Assessment Of The Precision And Bias Of An Online Gauge Using A Single Reference Instrument ? Synopsis

    By F. Lombard

    We consider the Grubbs estimation of the precision of an online gauge. Typically, this type of estimation involves independent results from two or more reference instruments (sampling and laboratory a

    Jan 1, 2012

  • SME
    Assessment Of The Real Economic Feasibility Of Potential Critical Raw Materials Mining Projects In The U.s.; Implementation Of A Newly Developed Computational Tool - SME Annual Meeting 2022

    By M. A. Islam, H. Mischo, G. Barakos

    Among the thirty-five declared critical raw materials (CRM) in the United States, there is no sustainable domestic production for the fourteen of them, while for some others domestic supply does not m

    Mar 2, 2022

  • IMMS
    Assessment Of The Rehabilitation Of The Sea-Bed Following Marine Aggregate Dredging

    By Siân E. Boyd

    Studies of benthic recolonization in the aftermath of marine aggregate dredging in the U.K. and elsewhere are limited and are largely confined to experimental circumstances. Investigations of the phy

    Jan 1, 2002

  • IMMS
    Assessment Of The Rehabilitation Of The Seabed Following Marine Aggregate Dredging

    By S. E. Boyd

    Studies of benthic recolonization following the cessation of dredging in U.K. waters and elsewhere are limited, and are largely confined to experimental circumstances. Investigations of the physical

    Jan 1, 2004

  • ISEE
    Assessment of the Relative Efficiency of Two Stemming Materials

    By Tapan Goswami

    A column of stemming material keeps explosion gases at high pressure for longer times in a blasthole. In general, use of appropriate stemming enables the achievement of the desired level of fragmentat

    Jan 1, 2000

  • CIM
    Assessment of the Remaining Life for Turbine Components Made Of Advanced Materials through Analyses and Testing

    By W. Beres

    Many non-commercial operators are currently faced with the need to operate fleets of legacy gas turbine engines. How long such engines can be kept in service safely, without replacing a significant po

    Jan 1, 2015

  • DFI
    Assessment Of The Risk Of Pile Driving To Juvenile Fish - The Problem

    By James J. Anderson

    In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th

    Jan 1, 1990

  • SAIMM
    Assessment Of The Risk Of Plug Or Water Barrier Failure Due To Seismicity At South Deep Mine

    As part of a comprehensive risk analysis which was carried out into the effectiveness of the water barrier between South Deep and Randfontein Estate mines, the potential threat posed by large seismic

    Jan 1, 2006

  • SME-ICGCM
    Assessment of the Rockburst Proneness in Hard Rock Coal Mines

    By S. P. Singh

    Rockburst is a sudden manifestation of the release of elastic strain energy stored in the rock. Therefore the tendency of the rock to burst should depend upon its ability to accumulate elastic strain

    Jan 1, 1986

  • AUSIMM
    Assessment of Underground Production Blast Designs and Blasting Performance

    By B Mohanty, D Zwaan

    Systematic near-field vibration monitoring of stope blasts was carried out in a large, deep underground mine. A total of 31 production blasts were studied in order to investigate the effectiveness of

    Aug 24, 2015

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • CIM
    Assessment of Unpredictability in Hydraulic Fracturing for Stress Amelioration around Underground Excavations

    By J. P. Harrison, G. F. Gambino

    "This paper examines unpredictability in the parameters governing hydraulic fracturing (HF) as used in stress amelioration for underground excavations, with the aim of showing how this unpredictabilit

    Jan 1, 2015

  • SAIMM
    Assessment of vibration exposure of mine machinery operators at three different open-pit coal mines

    By A. Tekin

    In almost all branches of industry, machinery and equipment in operation cause vibration. Some sources of vibration affect only the operator’s hands, fingers, and arms, while others have adverse effec

    May 2, 2022

  • SAIMM
    Assessment Of Viscosity Of Slags In Ferrochromium Process

    By L. Forsbacka, M. Nakamoto, L. Holappa

    Viscosity of the slag is one of the central parameters when producing FeCr in submerged arc furnaces. It contributes to smelting behaviour and reduction kinetics of chromite ore as well as to the Cr r

    Jan 1, 2007

  • CIM
    Assessment of Wall Control Blasting Practices at the Ekati? Diamond Mine

    By J. Peterson

    A review of blast designs and improved blasting practices at the Ekati??Diamond Mine is presented along with the results of three blast-monitoring experiments. Blast monitoring was undertaken to inves

    May 1, 2001

  • SME
    Assessment Of Weak Altered Rock Masses At The Island Creek Copper Mine

    By R. S. Olsen

    Intensely altered rock has had a large effect on slope stability as slopes increase in height at Island Copper mine. Traditionally used, fracture-controlled rock slope stability design techniques have

    Jan 1, 1987

  • AIME
    Assessment of wear mechanisms in grinding media

    By A. K. Gangopadhyay, J. J. Moore

    The effect of grinding media composition, mineral type, and slurry environment on the wear rate of various grinding media (balls) are discussed. Sufficient wear data have been obtained and correlated.

    Jan 1, 1986