  • SME
    Autoclave Operation Cost Reduction Through Customer - Vendor Problem Solving Communication

    By M. S. Hunter, Al Bishop

    In 1994, Lone Tree Mine invited Hunter Hawk to participate in a problem-solving arena at their mine located in Valmy, Nevada. Lone Tree was experiencing consistency problems with autoclave valve compo

    Jan 1, 1998

  • TMS
    Cyanide And The Environment; Barrick Gold Corporation's Perspective

    By John R. Goode

    Barrick Gold Corporation operates gold mines in the United States, Chile, 'Peru, Canada, and in the near future, in l1anzania. Barrick meets environmental requirements and limits the potentially

    Jan 1, 1998

  • SME
    Heap Leaching At Newmont's Muruntau Operation

    By D. Scott Barr

    The Zarafshan/Newmont Joint Venture operates the Muruntau heap leach project, located in the Kyzylkum desert of central Uzbekistan. The mine produces more than 12.4 t/a (400,000 oz/year) of gold from

    Jan 1, 1998

  • AUSIMM
    Design and Construction of the First Major Diamond Mine in Canada's Northwest Territories

    No paper was submitted for the proceedings, verbal presentation only (no material available).

    Jan 1, 1998

  • SME
    Easy Areas for Improvement and Good Ideas I've Seen When Reviewing Plant Operations-From a Prominent Consultant in Base and Precious Metals

    By Terry McNulty

    DOUG HALBE: I've decided that we're going to change tactics here and we're going to be nice to people from now on. [Co-chair makes gesture of intense disbelief; laughter] I've also

    Jan 1, 1998

  • SME
    Capitalization: Bolivia's Innovative Approach for Privatization, the Vinto Case

    By William P. Blacutt

    This paper describes the strategy, the struggles, and the obstacles encountered during the last two years in the ongoing process to capitalize Vinto. The effort involves the offering of a vertically i

    Jan 1, 1998

  • SME
    The Alumbrera Pipeline, World's Longest Copper Ore Concentrate Sluny Pipeline

    By Fred Morelko, Michael Connelly, Brad L. Ricks

    INTRODUCTION The $1.1 billion Bajo la Alumbrera Project, started up in 1997 by Minera Alumbrera Limited in the Catamarca Province of Northwestern Argentina, is the first large scale modern mining p

    Jan 1, 1998

  • CIM
    Flotation Improvements at Placer Dome's Campbell Mine

    By J. A. Folinsbee, Andre Robitaille, Tony Y. Chong

    "Conventional crushing and grinding is followed by gravity concentration to recover free milling gold. Refractory gold, finely disseminated within the pyrite and arsenopyrite matrix, is recovered by f

    Jan 1, 1998

  • AUSIMM
    Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject (AuslMM '98 - The Mining Cycle)

    By D J Williams

    Coal washery wastes comprise tailings, finer than 0.5 to 0.1 inn depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings sl

    Jan 1, 1998

  • SME
    Its Everyones Business

    By Scott Lawson

    BOB FALCONER: Our next topic leader is Scott Lawson. Scott is manager of human resources for Independence Mining Company, Cripple Creek and Victor Gold Mining Company, Victor, Colorado. Scott has 25 y

    Jan 1, 1998

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Environmental Rheology and the Mining Industry (Mine Fill 98')

    By DV Boger

    Rheology is the science which deals with the deformation and flow of matter. Thus nccology is concerned with the flow of any material. The mining industry is concerned with digging things out of the

    Jan 1, 1998

  • AUSIMM
    Paste Backfill Production Using Canmet's Silo Technology

    By A Annor, L J. Chen

    The production of paste backfill has typically been accomplished through the adaptation of existing technology. Thickeners and disc filters have several drawbacks when applied to production of tailing

    Jan 1, 1998

  • AUSIMM
    Whittle Programmings's Present and Future Tools for the Strategic Planning of Mines

    The author reviews design evaluation theory and existing optinustion tools and then describes how these have guided recent developments in Whittle Programming's strategic mine design package: F

    Jan 1, 1998

  • CIM
    Modifications of the CCD Circuit at Cameco's Key Lake Uranium Operation

    By Charles "Chick" Rodgers, Anthony Sarion

    "With declining feed grade and increased production targets, it became necessary to upgrade Key Lake's eight stage counter current decantation (CCD) circuit. Following laboratory trials, mill operatio

    Jan 1, 1998

  • TMS
    Electron Microscopy Study of TiB Reinforced Nanocrystalline .Ti-MMC's Produced by Mechanical Alloying and Thermohydrogen Processing of TiH2-B Powder Mixtures

    "Mechanical alloying (MA) synthesizing technology and thennohydrogen processing (THP) were utilized to produce nanocrystalline Ti-MMC's reinforced by TiB intermetallic compound by using TiH2-B powder

    Jan 1, 1998

  • SME
    New Facility Design Engineering: On-Site Versus Engineering Companies' Offices

    By Rich Perry

    HARRY HINDS: Our second speaker today is Rich Perry. Rich is the manager of leach and dewatering at Newmont Gold Company's Carlin operations. He has been the operator of Newmont's refractory

    Jan 1, 1998

  • SME
    Ihor Kunasz: An Interview With SME's 1998 President

    Editor's note: Biographical information about Ihor Kunasz, president, Newmont Uzbekistan, can be found in the February 1998 issue of ME, page 94 and in the May 1996 issue, page 92. Your perso

    Jan 1, 1998

  • CIM
    Laboratory Flotation of Voisey's Bay Ovoid Zone Massive Sulphide

    By P. Lostritto, G. E. Agar, G. Labonte, M. Cherevaty

    "A locked cycle flotation test was done on a sample from the ovoid portion of the Voisey 's Bay copper-nickel sulphide ore. The chemical conditions for this test were generated by prior independent te

    Jan 1, 1998

  • ISEE
    A Review of Rock Slope Development with Explosives Since the 1960's

    By Harry L. Siebert

    Pre-splitting was substituted for line drilling to achieve stable rock slopes and reduce excavation beyond the pay line on a Connecticut highway project in 1962-63. Changes have occurred in developing