Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)
By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp
Jan 1, 1999
-
Application Of Economic Parameters And Cutoffs During And After Pit Optimization (SME Annual Meeting March 1-3, 1999, Denver, Colorado)
By B. K. Baird, P. C. Satchwell
The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each
Jan 1, 1999
-
Application Of Economic Parameters And Cutoffs During And After Pit Optimization
By B. K. Baird
The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each
Jan 1, 1999
-
Coal Mine Subsidence Prediction Using A Boundary-Element Program
By Keith A. Heasley
Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub
Jan 1, 1999
-
An Engineering Cost Study: Cis Vs Ris With Aurix® 100
By Michael J. Virnig, Murdoch W. MacKenzie, Michael R. Davis
The objective of this paper is to present preliminary capital and operating cost estimates (±25%) comparing conventional carbon-in-solution (CIS) with resin-insolution (RIS) using AuRIX® 100 for the
Jan 1, 1999
-
Advances In Flotation - Flash Roughing With The Dual Outlet Skimair® Flotation Cell: Increasing Revenues And Reducing Cos T
By David Green
Power point slides
Jan 1, 1999
-
Adaptive Control In Processing Gold Ore
By Ron VanRiper, Ben W. Burdett, Randy A. Ynchausti, Jeff D. McKay, Dan Lampshire, Thomas W. Toronto
An adaptive process control system was installed in Cortez Gold Mines Mill #2 Grinding Plant in Nevada. The installation, commissioning, and testing of the system took approximately 80 manweeks, but f
Jan 1, 1999
-
Modern Seafloor Hydrothermal Deposits - Volcanic Island Arcs - Geochemistry Of Shallow Submarine Hydrothermal Fluids From Paleohori Bay, Milos, Aegean Sea
By D. Stüben, G. P. Glasby
"Abstract - Shallow submarine hydrothermal fluids from Paleohori Bay off the Greek Island of Milos have been investigated in detail. The extensive gas and warm (max. 93°C) water vents are enriched in
Jan 1, 1999
-
Refractory Gold Ore Treatment By Fluidized Bed Roasting For Barrick Goldstrike
By Andy Cole, Stanley Bunk, Steve Dunn, Thom McCord
In 1994, Goldstrike initiated a research program to investigate processing options for treating what was then the small amount of carbonaceous ore identified in the reserves. The focus of the research
Jan 1, 1999
-
Optimizing Profitability Of Heap Leaching
By Ken Deter
I have some general comments on optimizing profitability based on working in heap leach operations in tropical environments. Many of my planned comments this morning have been stated earlier in the Co
Jan 1, 1999
-
Using Envirobond™ To Prevent Acid Rock Drainage
By Steven Schurman
Acid Rock Drainage (ARD) is one of the most serious and persistent pollution problems facing today's mining industry. ARD is formed when pyrite (FeS) is exposed to natural weathering conditions. Pyrit
Jan 1, 1999
-
Caterpillar's New C-Series Trucks Featured At MineDemo
Caterpillar recently held two, two-day demonstration programs for its mining customers. The event, billed as MineDemo by Caterpillar, consisted of two sessions held on consecutive weeks at the company
Jan 1, 1999
-
Chile's Mining And The Application Of The Basel Convention
By G. E. Lagos
This paper analyses the scope and instruments employed by the Basel Convention for regulating the transboundary movement of hazardous wastes, the present and projected hazardous waste regulations of C
Jan 1, 1999
-
Concentrate Injection And Oxygen Enrichment In Peirce Smith Converters At Noranda's Altonorte Smelter
By Ernest D. Mast
Noranda's Altonorte custom smelter, located in the 2nd region of Chile, 20 kilometres southeast of the city of Antofagasta, started operations in 1993. Presently, 1150 tonnes per day of new feed
Jan 1, 1999
-
Frobisher's gold on Kodlunarn Island - fact or fable?
By John Loop, W. A. Gibbins, Donald D. Hogarth
"Introduction Background The Frobisher voyages of 1577 and 1578 were organized by the Cathay Company for the express purpose of finding and mining gold ore. Since publication of the Baffm expedition o
Jan 1, 1999
-
Selection Of A Biooxidation Process For The Pre-treatment Of Refractory Gold Ores
By James L. Whitlock, Amy E. James
During the past twenty years, numerous advances have been made in the technologies used to pretreat sulfidic refractory gold ores. These advances have included improved equipment design, increased gol
Jan 1, 1999
-
Improvement Of Cyanidation At New Britannia Mine
By G. Deschenes, M. Fulton
The New Britannia Mine processes a qumtz-carbonate gold ore containing 4.63 git Au at a rate of 2,200 tpd. The ore contains approximately 3 .0% arsenopyrite, 2. 7% pyrite and the rest is gangue minera
Jan 1, 1999
-
Mine To Mill Integration - The Next Step Improvement
By J. O. Craig Imrie
Mine operations are being squeezed to do more with less. This is not new. But, where do mine operators turn for the next stage of improvement? Many have waged strong wars on the cost reduction front a
Jan 1, 1999
-
Commercial Status Of Bioleaching
By Corale L. Brierley
This paper lists commercial bioheap and stirred tank bioleach operations and explains the status of these operations. A total of 17 commercial-scale bioleaching plants have been commissioned. Bioleac
Jan 1, 1999
-
Design Of Stillwater Mining Company's East Boulder Mine
By B. Strickland
The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished
Jan 1, 1999