  • SME
    Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By A. T. Visser

    The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp

    Jan 1, 1999

  • SME
    Application Of Economic Parameters And Cutoffs During And After Pit Optimization (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By B. K. Baird, P. C. Satchwell

    The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each

    Jan 1, 1999

  • SME
    Application Of Economic Parameters And Cutoffs During And After Pit Optimization

    By B. K. Baird

    The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each

    Jan 1, 1999

  • SME
    Coal Mine Subsidence Prediction Using A Boundary-Element Program

    By Keith A. Heasley

    Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub

    Jan 1, 1999

  • SME
    An Engineering Cost Study: Cis Vs Ris With Aurix® 100

    By Michael J. Virnig, Murdoch W. MacKenzie, Michael R. Davis

    The objective of this paper is to present preliminary capital and operating cost estimates (±25%) comparing conventional carbon-in-solution (CIS) with resin-in­solution (RIS) using AuRIX® 100 for the

    Jan 1, 1999

  • SME
  • SME
    Adaptive Control In Processing Gold Ore

    By Ron VanRiper, Ben W. Burdett, Randy A. Ynchausti, Jeff D. McKay, Dan Lampshire, Thomas W. Toronto

    An adaptive process control system was installed in Cortez Gold Mines Mill #2 Grinding Plant in Nevada. The installation, commissioning, and testing of the system took approximately 80 manweeks, but f

    Jan 1, 1999

  • CIM
    Modern Seafloor Hydrothermal Deposits - Volcanic Island Arcs - Geochemistry Of Shallow Submarine Hydrothermal Fluids From Paleohori Bay, Milos, Aegean Sea

    By D. Stüben, G. P. Glasby

    "Abstract - Shallow submarine hydrothermal fluids from Paleohori Bay off the Greek Island of Milos have been investigated in detail. The extensive gas and warm (max. 93°C) water vents are enriched in

    Jan 1, 1999

  • SME
    Refractory Gold Ore Treatment By Fluidized Bed Roasting For Barrick Goldstrike

    By Andy Cole, Stanley Bunk, Steve Dunn, Thom McCord

    In 1994, Goldstrike initiated a research program to investigate processing options for treating what was then the small amount of carbonaceous ore identified in the reserves. The focus of the research

    Jan 1, 1999

  • SME
    Optimizing Profitability Of Heap Leaching

    By Ken Deter

    I have some general comments on optimizing profitability based on working in heap leach operations in tropical environments. Many of my planned comments this morning have been stated earlier in the Co

    Jan 1, 1999

  • SME
    Using Envirobond™ To Prevent Acid Rock Drainage

    By Steven Schurman

    Acid Rock Drainage (ARD) is one of the most serious and persistent pollution problems facing today's mining industry. ARD is formed when pyrite (FeS) is exposed to natural weathering conditions. Pyrit

    Jan 1, 1999

  • SME
    Caterpillar's New C-Series Trucks Featured At MineDemo

    Caterpillar recently held two, two-day demonstration programs for its mining customers. The event, billed as MineDemo by Caterpillar, consisted of two sessions held on consecutive weeks at the company

    Jan 1, 1999

  • TMS
    Chile's Mining And The Application Of The Basel Convention

    By G. E. Lagos

    This paper analyses the scope and instruments employed by the Basel Convention for regulating the transboundary movement of hazardous wastes, the present and projected hazardous waste regulations of C

    Jan 1, 1999

  • TMS
    Concentrate Injection And Oxygen Enrichment In Peirce Smith Converters At Noranda's Altonorte Smelter

    By Ernest D. Mast

    Noranda's Altonorte custom smelter, located in the 2nd region of Chile, 20 kilometres southeast of the city of Antofagasta, started operations in 1993. Presently, 1150 tonnes per day of new feed

    Jan 1, 1999

  • CIM
    Frobisher's gold on Kodlunarn Island - fact or fable?

    By John Loop, W. A. Gibbins, Donald D. Hogarth

    "Introduction Background The Frobisher voyages of 1577 and 1578 were organized by the Cathay Company for the express purpose of finding and mining gold ore. Since publication of the Baffm expedition o

    Jan 1, 1999

  • SME
    Selection Of A Biooxidation Process For The Pre-treatment Of Refractory Gold Ores

    By James L. Whitlock, Amy E. James

    During the past twenty years, numerous advances have been made in the technologies used to pretreat sulfidic refractory gold ores. These advances have included improved equipment design, increased gol

    Jan 1, 1999

  • SME
    Improvement Of Cyanidation At New Britannia Mine

    By G. Deschenes, M. Fulton

    The New Britannia Mine processes a qumtz-carbonate gold ore containing 4.63 git Au at a rate of 2,200 tpd. The ore contains approximately 3 .0% arsenopyrite, 2. 7% pyrite and the rest is gangue minera

    Jan 1, 1999

  • SME
    Mine To Mill Integration - The Next Step Improvement

    By J. O. Craig Imrie

    Mine operations are being squeezed to do more with less. This is not new. But, where do mine operators turn for the next stage of improvement? Many have waged strong wars on the cost reduction front a

    Jan 1, 1999

  • SME
    Commercial Status Of Bioleaching

    By Corale L. Brierley

    This paper lists commercial bioheap and stirred tank bioleach operations and explains the status of these operations. A total of 17 commercial-scale bioleaching plants have been commissioned. Bioleac

    Jan 1, 1999

  • SME
    Design Of Stillwater Mining Company's East Boulder Mine

    By B. Strickland

    The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished

    Jan 1, 1999