Search Documents

Sort by

  • SME
    Flotation Separation of Phosphate and Dolomite Using a New Amphoteric Collector

    By Chengliang Jliang, B. K. Parek, Xuxin Shao

    Of the impurities present in phosphate ore, dolomite is the most difficult to remove due to the similar chemical compositions of the impurities and also adsorption of dissolved species of dolomite ont

    Jan 1, 1999

  • TMS
    Reduction Of Silver Losses During The Refining Of Copper Cathodes

    By P. Barrios

    Over a period of one year, an in-depth investigation was carried out in a conventional copper refinery to understand the behaviour of silver in copper electrolysis. The increase in silver content in t

    Jan 1, 1999

  • TMS
    Developments In Direct-To-Blister Smelting At Olympic Dam

    By Arthur G. Hunt

    Smelting using the direct-to-blister process commenced at Olympic Dam on 31 July 1988. The unique nature of the Olympic Dam ore body led to the selection of the direct to blister smelting process. Sig

    Jan 1, 1999

  • SME
    Triennial Conexpo-Con/Agg Show Upcoming In Las Vegas

    More than 100,000 people from 110 countries involved in the construction aggregates and ready mix concrete industries are expected to attend Conexpo-Conlagg '99 in Las Vegas, NV March 23-27. Th

    Jan 1, 1999

  • AUSIMM
    Silver and Tin Distribution between Copper Matte and Fayalite Slag

    By D R. Swinbourne, T Lehner

    Study of the distribution of minor elements between copper matte andfayalite slag is important in determining appropriate methods tomaximise the recovery of valuable metals and the rejection of harmfu

    Jan 1, 1999

  • TMS
    Kidd Process Permanent Cathode Technology Advancements

    By P. E. Donaldson

    Since 1992, Falconbridge has made available to the international copper industry, Kidd Creek's licensed refinery process technology under the name of the Kidd Process. This has resulted in the su

    Jan 1, 1999

  • SME
    Mine Closure And Reclamation Planning In Chile

    By R. L. Kloberdanz

    Compania Minera Disputada de las Condes S.A. (Disputada) is proactively implementing closure and reclamation planning activities at its mining and beneficiation facilities (mining facilities) in Chile

    Jan 1, 1999

  • NIOSH
    Technology News - No. 478 - Apparatus for Measuring the Gas Content of Coal or Rock Core Samples

    To design an apparatus that advances the state of the art in gas content testing equipment. The goal of the design is to incorporate improvements in testing sensitivity/accuracy, durability, and ease

    Jan 1, 1999

  • ISEE
    Seismic Monitoring During Blastings of Building Pit for WTC at Rijeka

    By D Vrkljan, Z Ester

    Excavating the building pit for the World Trade Center at Rijeka, it was necessary to blast over 160000 m3 of hard mass in fused condition. The building pit is located at a densely populated residenti

    Jan 1, 1999

  • CIM
    GUIANA - Geological and Metallogenic Environments of Gold Deposits of the Guiana Shield: A Comparative Study between St-Élie (French Guiana) and Omai (Guyana)

    By Gabriel Voicu, Marc Bardoux, Ross Stevenson, Nuno Machado, Jean Lafrance

    "Abstract - Paleoproterozoic gold is found in two different volcano-sedimentary sequences and intrusive bodies separated by 600 km within the Guiana Shield. The 2148 Ma St-Élie granite intruded volcan

    Jan 1, 1999

  • ISEE
    Modeling Coal Seam Damage in Cast Blasting

    By Dale S. Preece, Stephen H. Chung

    "A discrete element computer program named DMC_BLAST (Distinct Motion Code) has been underdevelopment since 1987 for modeling rock blasting (Preece & Taylor, 1989). This program employsexplicit time i

    Jan 1, 1999

  • ISEE
    Prediction of Ground Vibration Produced from Bench Blasting

    By Gungor Tuncer, Ali Kahriman

    "In bench blast design, not only the technical and economical aspects, such as block size, uniformityand cost, but also the elimination of environmental problems resulting from ground vibration and ai

    Jan 1, 1999

  • AUSIMM
    Quartz Vein Styles in Turbidite-hosted Mesothermal Gold Deposits of Western South Island (New Zealand), Victoria (Australia) and Nova Scotia (Canada)

    By P K. Smith, R J. Ryan, W R. H Ramsay, D C. Arne, F P. Bierlein

    Turbidite-hosted, mesothermal lode gold deposits in Paleozoic metasedimentary rocks of the Buller Terrane, western South Island have a similar geological history and genesis to the Paleozoic lode gold

    Jan 1, 1999

  • SME
    Mine Shaft Conveyance Monitoring (f0f1bf77-fd16-4f91-b699-be3b3d7f3509)

    By T. M. Ruff, W. G. McCoy, M. J. Beus, S. Iverson, W. Hasz

    Technology to enhance safety during mine hoisting has been developed by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health. Assessment of curre

    Jan 1, 1999

  • CIM
    The Upgrading of Primary Gold Gravity Concentrates

    By Bryn Harris, Liming Huang, Andre Laplante

    "This paper reviews flowsheets generally used in gold rooms to upgrade primary gravity concentrates particularly those of Knelsons. It is concluded that even for small operations, which treat between

    Jan 1, 1999

  • AUSIMM
    Mineral Property Valuation, or "What Number Did You Have in Mind?"

    By G J. A Dewar

    The Australian Corporations Law generally requires Independent Expert Reports to be presented in support of capital raising or in defence of mergers and takeovers. The introduction of the VALMIN Code

    Jan 1, 1999

  • TMS
    Iron Removal From Leachate By Limestone Precipitation And Direct Electrowinning Of Copper

    A study of iron-removal from copper leachate by limestone precipitation followed by direct eltctrowinning of copper has been conducted. The influence of the process parameters: amount of precipitant,

    Jan 1, 1999

  • ISEE
    Drill Accuracy

    By Jerald E. Harris

    "Often taken for granted, drill accuracy plays a major role in the relative success or failure of a blast.Expensive technological advances in equipment capabilities, drilling tools, communications, ex

    Jan 1, 1999

  • TMS
    Optimization Of The Blast Furnace Process In A Secondary Copper Smelter

    By Andreas Nolte

    In 1999 HÜTTENWERKE KAYSER AG (HK) in Germany will produce more than 180,000 t/y of electrolytic refined copper. To achieve this production from materials with copper grades from two to seventy percen

    Jan 1, 1999

  • SME
    Improved Strategies for TBM Performance Prediction and Project Management

    By Priscilla P. Nelson, Yousof Abd Al-Jalil, Christopher Laughton

    Prediction of excavation rates is a critical element in the pre-planning of a tunnel boring machine (TBM) project. A realistic evaluation of performance expectations is needed that reflects both the k

    Jan 1, 1999