Search Documents

Sort by

  • AUSIMM
    Freeport Indonesia's Deep Ore Zone Mine

    By T Casten

    Freeport IndonesiaÆs DOZ (Deep Ore Zone) mine is scheduled to commence production in the second half of 2000. The DOZ will produce 25 000 tpd using mechanised block cave mining methods and will have a

    Jan 1, 2000

  • AUSIMM
    Footwall Stability at the LKAB's Kiruna Sublevel Caving Operation, Sweden

    By C DahnTr-Lindqvist

    The Kiruna mine produced about 19 Mt processed iron ore in 1999 using sublevel caving. General failure in the hangingwall has been widely studied and its mechanism is rather well understood. Failure i

    Jan 1, 2000

  • SME
    A Novel Fine Screening Device-the Pansep Screen

    By Rein Buisman, Michael Fullam

    This paper outlines the general operating principles, benefits and applications for the Pansep Screen. The Pansep is a continuous fine screen developed in 1997 capable of processing high volumes of fi

    Jan 1, 2000

  • SME
    Evaluations Of 3m Fluorad™ Fc-gold On Gold Extraction From Production Heap Leaching At Daisy Gold Mine (Glamis Gold)

    By Shawn Orser, Jennifer Waddell, Mike Sierakowski, Tom Barrett

    Production evaluations were conducted at Daisy Gold Mine (Glamis Gold, formerly Rayrock), between August, 1997 and August, 1998 to quantify the effect of 3M fluorochemical surfactants (fluorosurfactan

    Jan 1, 2000

  • SME
    Leaching Gravity Concentrates Using The Acacia Reactor

    By W lethlean, Laurie Smith

    When coarse gold is present in an ore, there are advantages in physically recovering this gold in the grinding section of the ore processing plant. This reduces the risk of the coarse gold being locke

    Jan 1, 2000

  • AUSIMM
    A Local Authority's View of Mining and the Resource Management Act

    Mining is still a significant economic activity within the Hauraki District. The Martha project is particularly significant. Estimates are that in the order of 850 direct and indirect jobs are derived

    Jan 1, 2000

  • SME
    Cover system to mitigate ARD in an arid climate - setup of field test plots at BHP Iron Ore's Mt. Whaleback operation (Technical Paper)

    By O. Porterfield, M. O’Kane, M. Endersby

    BHP Iron Ore initiated research programs in January 1995 to develop long-term plans for decommissioning waste rock material at its Mt. Whaleback operation. More than 2 Gt (2.2 billion st) of waste roc

    Jan 1, 2000

  • DFI
    Cast Insitu Piling For The King's Wharf Project, Sydney, Australia

    By Slav Tchepak

    The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin

    Jan 1, 2000

  • TMS
    Mitsubishi Materials' High Performance Oxygen Free Copper and High Performance Alloys

    By Norihisa Iida, Yutaka Koshiba, Tsutoipu Masui

    "Mitsubishi Materials has many years of experience in the production of oxygen free copper (OFC) and its alloys with a fully continuous-casting process. Four grades of OFC, commercial, electronic, sup

    Jan 1, 2000

  • ISEE
    Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine

    By D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco

    Jan 1, 2000

  • TMS
    Improvements in the Leaching Circuito of Immsa's Zinc Plant in San Luis Potosi, Mexico

    By S. Castro, P. Alfaro, C. Moctezuma

    IMMSA operates a conventional roasting-leaching-purification-electrolysis plant for the production of zinc from concentrates in San Luis Potosi, Mexico. The leaching circuit was designed to take into

    Jan 1, 2000

  • AUSIMM
    Waihi Gold Mine's Community Story

    Waihi Gold Mining Company Limited, a wholly owned subsidiary of Normandy Mining Limited, operates the Martha gold mine, located in the township of Waihi, New Zealand. The operation, an unincorporated

    Jan 1, 2000

  • SME
    Noranda's exploration strategy

    By D. L. Stevens

    Following an in-depth scenario and strategic-planning exercise in 1997, Noranda's mine production goal was set at 500 kt/a (550,000 stpy) of both copper and zinc metal in five years. There had be

    Jan 1, 2000

  • TMS
    CTP's Experience in the Removal of Contaminants and Odors in the Recycling Industry - A New Process for Simultaneously Removing Voes, and Dioxins and Furans

    By Heimo Thalhammer

    During the refining of lead, copper or other metals the furnaces used in the process · often produce waste gases. This paper illustrates how these waste gases can be successfully treated and destroyed

    Jan 1, 2000

  • SME
    Winter field test for heap leaching Carmacks copper ore in Canada's Yukon Territory

    By W. J. Schlitt, K. McNaughton

    A heap-leach field test was conducted during the 1993-1994 winter season at Carmacks, Yukon Territory, Canada. The purpose of the test was to demonstrate the viability of heap leaching Carmacks oxide

    Jan 1, 2000

  • SME
    Newmont's Deep Post Underground Mine: The Challenge Of Constructing And Operating An Underground Mine Within A Large, Active Open Pit

    By J. F. Barry

    Newmont Mining Corporation and Barrick Goldstrike Mines, Inc. concluded an exchange of land and reserves in an agreement signed May 3, 1999.This exchange of assets allowed Newmont to develop the Deep

    Jan 1, 2000

  • SME
    Using diagnostic process analysis to improve cash flow at Newmont's Carlin Mill #4 (Technical Paper)

    Mill #4 processes mildly refractory ore from Carlin Trend deposits. Diagnostic analysis of plant operating data was used to generate a mathematical model containing the important parameters influencin

    Jan 1, 2000

  • TMS
    Operations at the Doe Run Company's Herculaneum Primary Lead Smelter

    By N. D. Schupp

    The Doe Run Company's Herculaneum, Missouri lead smelter has existed in continuous operation since 1892. Throughout the history of the plant extensive developments have been made to improve throughput

    Jan 1, 2000

  • ISEE
    Top Hammer Hydraulic Drilling Pushing the Practitioners' Envelope

    By William Hissem

    When we look out on our business landscape today, the words higher, faster, fdwther come to mind. Compliance issues, business integration, increasing production and profitability demands are convergin

    Jan 1, 2000

  • ISEE
    Diagnosis of Utility Pipelines' Response to Explosives using Modal Analysis

    By Selamawit Asfaw, Mohamad Sharif

    In recent years, the use of modal analysis has increased to include many different aspects of the construction industry. Computer modal analysis can be used in determining the dynamic properties of a

    Jan 1, 2000