Search Documents

Sort by

  • SME-ICGCM
    A Lineament Analysis Case Study of the Fola Coal Co., LLC. No. 2 Surface Mine, West Virginia

    By Paul L. Tyrna

    The Fola Coal Co., LLC No 2 surface mine, located in Nicholas and Clay Counties, WV, exploits up to nine coal seams by contour, highwall, and mountain top removal mining methods. After encountering fa

    Jan 1, 2001

  • AUSIMM
    Taharoa Minesite Plant Relocation

    By P Rowe

    New Zealand Steel's Taharoa titano-magnetite mine, south of Auckland, set two national load records when it transported around 2000 t of mining equipment three kilometres overland on time, under

    Jan 1, 2001

  • SME-ICGCM
    Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)

    By Thomas M. Barczak

    Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that

    Jan 1, 2001

  • TMS
    Pretreatment for the Recycling of Spent Li Ion Batteries

    By Denise C. R. Espinosa

    Rechargeable lithium batteries are one of the most promISIng technology in battery development. Although Li ion batteries have been used as an alternative to the more polluting and less performing Ni-

    Jan 1, 2001

  • ISEE
    Displacement and Mixing of Blasted Sedimentary Rocks in Quarrying

    By Stephen Chung, John Carpenter, Scott Gosch, James Breedlove

    While controlling fly rock and ground vibration in quarrying in the neighborhood of a residential area, producing good fragmentation and keeping different grades of material separated in a muckpile ar

    Jan 1, 2001

  • SME
    CEET (Comminution Economic Evaluation Tool) (For Comminution Circuit Design And Production Planning)

    By G. Kosick, G. Dobby

    CEET, an acronym for Comminution Economic Evaluation Tool, was jointly developed by MinnovEX Technologies Inc. and 13 major mining companies for the purpose of designing and predicting the performance

    Jan 1, 2001

  • SME
    Meeting the Challenges and Risks for Tunneling Under San Diego State University

    By Dave Ragland

    The SDSU tunnel and underground station are the first of these type facilities to be constructed by the Metropolitan Transit Development Board. Because there is no previous experience, and because tun

    Jan 1, 2001

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001

  • SME
    EPA’s EPCRA Assistance Visits: Getting Prepared (EPCRA Actually Consists Of Sections Other Than 313?)

    By K. Ward

    The Environmental Protection Agency (EPA) is beginning to provide compliance assistance visits to various industries, including mining, for Emergency Planning and Community Right-to-Know Act (EPCRA) c

    Jan 1, 2001

  • DFI
    Seismoacoustic Effects Of Driving Large Diameter Piles ? Summary

    By Barry C. Roth

    Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground

    Jan 1, 2001

  • AUSIMM
    Belle-Brook 2001 - A Hydrothermal Oddity?

    The Waimumu area, 12 km southwest of Gore, is underlain by the Gore Lignite Measures, an early Tertiary fluvial sequence approximately 500 m thick resting on Triassic-Jurassic argillitic basement. The

    Jan 1, 2001

  • SME
    Environmental Impacts Of Mining Natural Aggregate

    By William H. Langer

    Nearly every community in the United States is dependent on aggregate (sand, gravel, and crushed stone) resources to build and maintain its infrastructure. Unfortunately, developing aggregate resource

    Jan 1, 2001

  • TMS
    H2O in the Flash Furnace

    By W. G. Davenport

    H20 is present in many flash furnace inputs. Examples are: (a) moisture in concentrate and flux (b) humidity in blast (c) moisture in hydrocarbon fuel, particularly coal, Appendix IV. H20 may als

    Jan 1, 2001

  • CIM
    Integration and enhancement of mine operations and maintenance — A structured analysis approach

    By P. Roman, L. Daneshmend

    "During the last decade, mining companies have been overwhelmed by technological solutions to perceived problems. This is particularly true with information technology where rapid advances have result

    Jan 1, 2001

  • SME-ICGCM
    FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field Trial

    By H. Yavuz

    A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T

    Jan 1, 2001

  • TMS
    The Use of Unit Operations of Mining Treatment as the First Step of NiCd Batteries Recycling

    By Denise C. R. Espinosa

    The amount of secondary batteries are increasing about 15% by year. Among these batteries, it can be highlighted the NiCd ones, due to their high consumption. In Brazil, the consumption of NiCd batter

    Jan 1, 2001

  • AUSIMM
    Pre-Set Delay Electronic Detonators: Merits Opposite Programmable Systems

    By C Robertson, J Campos

    The South African mining industry first experienced en-masse use of electronic detonators in the Narrow Reef environment using AELÆs ElectrodetÖ pre-set delay system. In recent years, programmable sys

    Jan 1, 2001

  • SAIMM
    The Road To NPV+

    By R. Hummel

    When the slope angles of the southern side of the Venetia open pit were required to be flattened by some 20 degrees after an analysis completed by De Beers geotechnical engineering in conjunction with

    Jan 1, 2001

  • SME
    Shaft Sinking at the Nevada Test Site U1H Shaft Project

    By Ralph Musick, Brian Briggs

    The U1h Shaft Project is a design/build subcontract to construct one 6.1 meter(m) (20 feet [ft.]) finished diameter shaft to a depth of 321.6 meters (m) (1055 ft.) at the Nevada Test Site (NTS). Atkin

    Jan 1, 2001

  • SME
    John Doe Bloopers, Blunders, and Scams

    By William F. Riggs

    The name of this symposium speaks for itself in the connotation normally assigned to the term 'political. "In this paper, various donors have contributed their stories of metallurgical bloopers,

    Jan 1, 2001