Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Remediation Planning at a Derelict Mine Site Affected by Acid Drainage
By J Brisebois
The Wisemans Creek derelict mine site is located in native forest approximately 150 km west of Sydney. Mean annual rainfall at Bathurst, 20 km to the north, is 634 mm and reasonably distributed throug
Jan 1, 2003
-
The Pinehouse Limestone Project
By Doug Smith, Gary Taylor, Paul Ogryzlo
"Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre
Jan 1, 2003
-
Analysis for pillar extraction potential (A-PEP)—a risk-based program for underground coal mining
By G. H. Lind
Research into the safe and economic extraction of underground coal pillars in the Witbank and Highveld coalfields of South Africa highlighted that future practices will have to consider pertinent risk
Jan 1, 2003
-
Visualizing the Evolutions of Microstructure through Quenching Processes
By Makiko Takahashi
A tool is being developed to predict and visualize the microstructural evolution of steels during quenching. This tool utilizes experimental data and reference data that are stored in a database to pr
Jan 1, 2003
-
Pyrite Oxidation Rates Determined Based on Quantitative Mineralogy of Long-Term Column Leaching Tests
By N DavT
Pyritic tailings from the Quirke mine waste management area in Elliot Lake, Ontario were subjected to long-term column leaching experiments in two PVC columns measuring 122 cm in height and 15.2 cm in
Jan 1, 2003
-
A Set Of Indices Based On Indentation Tests For Assessment Of Rock Cutting Performance And Rock Properties
By H. Copur
Experimental studies for quantification of force and brittleness indices relevant to rock cutting performance are presented. A simple interpretation method is developed, which quantifies the force-pen
Jan 1, 2003
-
Small Scale Study of Damage Due to Blasting and Implications on Crushing and Grinding
By C. Pelley, S. Kelebek, S. Gregersen, P. Katsabanis
A series of small scale tests have been conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the physical properties of the rock as well as its resistance to crushin
Jan 1, 2003
-
Re-Processing of the Chromite Concentration Tailings and Description of a New Beneficiation Method
By A. Güney, G. Önal
"Karagedik Chromite Concentrator of the ETI Holding Co., which is located in Fethiye (south Turkey), has been producing chromite concentrate assaying 47-48 % Cr2O3 from the chromite ores containing 30
Jan 1, 2003
-
Excavator Selection
The excavator selection process is quite complex due to the large number of influencing factors, many of these are variable and difficult to accurately define. The majority of mining companies prepare
Jan 1, 2003
-
Beneficiation Technology Of Phosphates: Challenges And Solutions
By S. El-Mofty, P. Zhang, N. A. Khalek
This article reviews different technologies used for beneficiation of siliceous and calcareous phosphate ores of different origin. The review sheds light on recent trends suggested for solving problem
Jan 1, 2003
-
The Elimination of Rock-fall Fatalities in Ontario Hardrock Mines
By Douglas Morrison
Hardrock mines in Ontario generally operate at between 3,000 and 7,500 ft below surface and generally experience significant rockburst activity below 5,000 ft. Since the introduction of bulk mining te
Jan 1, 2003
-
Some Aspects Of Cementation Reactions
By Ian M. Ritchie
Cementation or metal displacement reactions such as Cu2+ + Fe Cu + Fe2+ are among the oldest known hydrometallurgical reactions. They are still used in the recovery of some metals and in the
Jan 1, 2003
-
Pyrometallurgical Reactors -Closers Of The Recycling Material Cycle-(Invited)
Pyrometallmurgical reactors constitute a key processing component in the total primary and secondary resource cycle, being involved both in primary smelting, converting and extraction, as well as the
Jan 1, 2003
-
Removal of Low Level Mercury from Aqueous Streams Using Silica Polyamine Composites
By Edward Rosenberg
The synthesis and characterization of silica polyamine composites modified with a variety of sulfur containing ligands is described. The two most successful ligands in terms of sulfur in-corporation a
Jan 1, 2003
-
Economies of Scale in Surface Mining Equipment ù Dimensions and Impact Analysis
By M Scoble, R A. Hall
The mining industry has aggressively sought competitiveness through increased productivity and return on investment. A primary strategy has been the pursuit of economies of scale. This has also been d
Jan 1, 2003
-
Improved understanding of high pressure pre-grouting effects for tunnels in jointed rock
By N. Barton, E. Quadros
This paper addresses the prediction of groutable joint apertures, grout penetration limitations, and possible grout take volumes per cubic metre of rock, as a result of 5 to 10 MPa pre-injection press
Jan 1, 2003
-
Sulfur And Oxygen Partial Pressure Ratios Prediction In Copper Flash Smelting Plants Using Reddy-Blander Model (179070f4-60ac-4b6d-ac5a-2f581fe26c75)
By Bora Derin
The partial pressure ratios of sulfur and oxygen for several copper flash smelting plants were derived using the Reddy-Blander (RB) model and predicted dissolved sulfur contents available in the liter
Jan 1, 2003
-
The Coming Of Age Of Thin Reactive Support Liners (Superskins) For Underground Support Applications
By B. S. Hulvey
Thin support liners are becoming more accepted and being developed with improved properties because the mining industry as a whole has been offering underground safe test trial sites. This is because
Jan 1, 2003
-
A Resource-Oriented Analysis Of Metallic Raw Material Flows
The long-term goal of the Collaborative Research Centre 525 is the identification of options for the resource-sensitive supply and utilization of metallic raw materials. In order to address these issu
Jan 1, 2003
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details
By Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003