Search Documents

Sort by

  • IIMP
    Angostura project. A High Sulfidation Gold Silver Deposit located in the Santander Complex of North Eastern Colombia.

    By Frederick Felder

    The paper point out the Angostura deposit is located in Colombia. The Angostura deposit, located within the Eastern Cordillera of Colombia is hosted by Triassic-Jurassic quartz monzonite and quartz di

    Apr 22, 2003

  • IIMP
    Volcanogene and sediment-hosted base metal potential in the colombian cordilleras: a preliminary paleo-tectonic analysis supported by empirical examples

    By Robert Shaw

    "The paper point out the volcanogene and sediment-hosted base metal deposit from the Colombian cordilleras have been considered in the light of tectonogenic models for these deposit types, based upon

    Apr 22, 2003

  • IIMP
    Structural openings and the localization of ore bodies

    By Eric Nelson

    The paper point out the structural openings and the localization of ore bodies. Structural openings in rocks constitute the primary permeability network for the formation of most hydrothermal ore de

    Apr 22, 2003

  • NIOSH
    Coal Operator Mining Facts - 2001

    In 2001, a total of 2,144 coal mining operations reported employment to the Mine Safety and Health Administration (MSHA). Coal mines comprised 14.7% of all mining operations. • Bituminous mines compr

    Apr 1, 2003

  • NIOSH
    Technology News - No. 504 - NIOSH Releases New AHSEM and ARBS Software Programs To Improve Ground Control

    It is now widely accepted that horizontal stress is present nearly everywhere underground. Often it is more severe than the vertical stress. It is a major cause of roof control problems in undergro

    Apr 1, 2003

  • NIOSH
    Technology News - No. 505 - NIOSH Releases New Coal Mine Roof Rating Software

    Introduction The Coal Mine Roof Rating (CMRR) is a roof classification system. It was first introduced to the mining community in 1994.The CMRR filled a longstanding need to quantify geologic desc

    Apr 1, 2003

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 2

    By D. Berkley

    The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining an

    Mar 1, 2003

  • NIOSH
    Technology News - No. 503 - Hazcom Helper Compliance Tool For MSHA Rule 30 CFR Part 47

    Develop tools that mine personnel can use to comply with 30 CFR,Part 47. Background The new MSHA rule, 30 CFR, Part 47 (also known as the HazCom rule), requires all mines to develop a written pr

    Mar 1, 2003

  • DFI
    Session 26 "Groutability and Grout Evaluation"

    By Peter Yen

    This session consists of five papers. Three involved research on the properties of grout materials, specifically ultrafine cements and polyurethane grouts. Two papers present the development of soil g

    Feb 10, 2003

  • DFI
    Session 23 "Grout in Rock and Mining"

    By John Davie

    We used a Remtek survey in Glenrock and had very good luck with it when we first started the initial investigation. We would have loved to have used that more but my understanding is the equipment is

    Feb 10, 2003

  • DFI
    Session 11 Jet Grouting II

    By George Burke

    Of the three projects, particularly the extensive Nimitz II (downtown) project, a single system, which was part of the operation, was used to control the spoil. Spoil control was continuous with the w

    Feb 10, 2003

  • DFI
    Session 28 "Modeling and Verification"

    By Dawn Shuttle

    In trying to find a grout, or some kind of stabilizer that would work in this application, we established some performance criteria. Of those, what I controlled the most was viscosity, then I had a wh

    Feb 10, 2003

  • DFI
    Keynote Lecture 3: G. Stuart Littlejohn Compensation and Permeation Grouting

    By G. Stuart Littlejohn

    In spite of recent concerns in certain European countries, I believe that silicate-ester grouts will continue to be employed in practice, unless more cost-effective inorganic grouts are developed for

    Feb 10, 2003

  • DFI
    Keynote Lecture 1: James Warner Compaction Grouting/Limited Mobility Grouting

    By James Warner

    Although use of low mobility grout is just now beginning in some parts of the world, its advantage for many applications has been well established through more than 50 years of positive experience. Th

    Feb 10, 2003

  • DFI
    Session 8 " Jet Grouting and Deep Mixing"

    By Masaki Kitazume

    Five papers were presented orally to the topics of Jet Grouting and Deep Mixing. The session was started with a brief introduction by the moderators. Following the oral presentation, floor discussions

    Feb 10, 2003

  • DFI
    Long Term Performance of Grouts and the Effects of Grout By-Products

    By Stephan A. Jefferis

    I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the

    Feb 10, 2003

  • DFI
    Session 30 "Grouting for Tunnels 2"

    By Raymond Henn

    Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting

    Feb 10, 2003

  • DFI
    Session 19 "Compensation Grouting"

    By Douglas Heenan

    The fracture orientations were inferred based on theory and previous experience. The fracture pattern was not monitored during the project. Grout volume was recorded at each sleeve port and real time

    Feb 10, 2003

  • DFI
    Session 21 "Grouting in Karst"

    By Jim Henry

    I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi

    Feb 10, 2003

  • DFI
    Session 24 "Compaction Grouting and Consensus Guide"

    By Richard Berry

    The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th

    Feb 10, 2003