Search Documents

Sort by

  • SAIMM
    Composite Failure Mechanisms In Coal Measures Rock Masses - Myths And Reality - 1. Introduction

    By John V. Simmons, Peter J. Simpson

    Excavated slopes in open pit coal mines are designed to be as steep as possible consistent with stability and safety requirements. Slope failures occur for many reasons, including oversteepening. Th

    Jan 1, 2006

  • CIM
    Pilot Plant Demonstration of the Mintek Thermal Magnesium Process

    By M. Abdellatif

    Successful demonstration of The Mintek Thermal Magnesium Process (MTMP) was achieved in November 2004 at the pilot-scale, About 30 tons of magnesium producing recipe was smelted in the DC arc furnace

    Jan 1, 2006

  • NIOSH
    Assessment And Evaluation Of Noise Controls On Roof Bolting Equipment And A Method For Predicting Sound Pressure Levels In Underground Coal Mining

    By Rudy J. Matetic

    Over-exposure to noise remains a widespread and serious health hazard in the U.S. mining industries despite 25 years of regulation. Every day, 80% of the nation’s miners go to work in an environment

    Jan 1, 2006

  • TMS
    A New Advanced CFD Model For Flash Smelting And Converting Processes

    By Tapio Ahokainen

    Commercial modeling software and increasingly efficient computers enable today computational fluid dynamics (CFD) to be used as a tool for a more comprehensive understanding of the flash smelting and

    Jan 1, 2006

  • SME
    Effect Of Elevated CO2 And Pb On The Growth Of Pinus Densiflora And Soil Microbial Community

    By S. -H. Kim

    This work investigated the effect of the concentration of CO2 and lead contamination on the forest ecosystem. Changes of the plant growth, lead concentration in soil, plant, and soil microbial communi

    Jan 1, 2006

  • AUSIMM
    Rehabilitating a Historical Coal Mine in Wangaloa, New Zealand

    By C M. Evans, D Thomas

    Solid EnergyÆs Wangaloa open cast coal mine was operated between 1945 - 1989, and remained closed and disused until 2001 when SENZ initiated a mine rehabilitation programme. It is nearing the final st

    Jan 1, 2006

  • TMS
    Characterization Of Precipitates In Structural Titanium Microalloyed Steel By Transmission Electron Microscopy And High Resolution (HRTEM)

    By L. Béjar-Gómez

    The aim of this research work is to study and characterize precipitates in structural microalloyed steel by transmission electron microscopy and analysis by high resolution (HRTEM). Microalloyed steel

    Jan 1, 2006

  • SAIMM
    A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.

    By Simon St J Tose

    The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t

    Jan 1, 2006

  • SME
    Industry Technologies Featured at MPES Meeting

    The development of technologies to improve mining and mineral processing is an ongoing process. These new technologies are the result of the industry’s drive to lower costs and improve productivity.

    Jan 1, 2006

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • TMS
    Processing Of Al Alloy-AlN Metal Matrix Composites

    By Vinod K. Namilakonda

    In situ synthesis of discontinuously reinforced aluminum alloy metal matrix composites was investigated. Aluminum alloy (A356: Al-7 wt% Si) was reinforced with dispersed AlN particles. Thermodynamic c

    Jan 1, 2006

  • AUSIMM
    Paragenesis of Hydrothermal Minerals in the Rise and Shine Shear Zone, Otago Schist

    By D Craw

    The Rise and Shine Shear Zone is a mineralised low angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. Rocks from the shear zone obtaine

    Jan 1, 2006

  • SME
    Determination Of The Optimum Sampling Density For A Multi-Seam Lignite Deposit

    By M. Modis

    According to previously established theoretical analysis and under certain conditions, a critical sampling grid can be determined for an earth-related space-distributed natural variable. Sampling abov

    Jan 1, 2006

  • DFI
    Slurry Trench Design and Construction in Difficult Conditions

    By Peter Deming

    "PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear

    Jan 1, 2006

  • SME
    Factors Affecting Synthesis Of Ferronickel Slag Based Geopolymers

    By D. Zaharaki

    The optimisation of geopolymer synthesis was studied bymixing low Ca electric arc ferronickel slag with kaolinite, sodium silicate solution, sodium hydroxide pellets and water. The pulp was heated at

    Jan 1, 2006

  • AUSIMM
    Developing a Copper Mine in a Developing Country

    Designing and constructing OxianaÆs Sepon gold and copper operations in one of the most remote areas in Laos has been a great achievement; one which was recognised by the engineering industryÆs highes

    Jan 1, 2006

  • NIOSH
    The Effects Of Scaling Height And Scaling Bar Design On Applied Forces And Bilateral Muscle Activity Of The Back And Shoulders ? Introduction

    By William Porter

    Hand scaling is a physically demanding job and is responsible for numerous overexertion injuries in mining. This experiment studied rib scaling from an elevated bucket to examine force generation cap

    Jan 1, 2006

  • TMS
    Comparison Of Oxidation Behavior Of Nitride Based Hard Ceramic Thin Film Coatings Using Thermal Analysis Techniques

    By N. Solak

    CrN, TiN and Ti-B-N coatings were deposited onto H13 hot-working tool steel and alumina substrates by arc-PVD. The coatings were characterized with respect to their mechanical and structural propertie

    Jan 1, 2006

  • SAIMM
    Mining An Open Pit Over And Through Old Sub-Level Caving Operations At Kwaggashoek East Open Pit, Thabazimbi Iron Ore Mine

    By C J. de Beer

    The Kwaggashoek East pit is one of the four production areas of Thabazimbi Iron Ore Mine. The Kwaggashoek East Open pit mines through the abandoned sublevel caving operations of the Kwaggashoek East u

    Jan 1, 2006

  • TMS
    New Eco-Process For The Preparation Of Metal Oxide Varistors

    By Renaud Metz

    The DOPA process (Direct Oxidation of a Precursor Alloy) was used to prepare ceramic powders based on doped SnO2 and ZnO. The DOPA process consists essentially in the direct oxidation of a homogeneous

    Jan 1, 2006