Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Case Study On The Operation Of A Flottweg Tricanter® Centrifuge For Solvent-Extraction Crud Treatment At Bwana Mkubwa, Ndola, Zambia
By Gift Chisakuta, Bravo Mbao, Nils Schwarz, Angus Feather, Anthony Mukutuma
Bwana Mkubwa is a 50 000 tons per annum copper cathode producer, owned by First Quantum Minerals and located in Ndola, on the Zambian Copperbelt. The Bwana Mkubwa solvent-extraction circuit was starte
Jan 1, 2007
-
National Minerals Policy Practices: Key To Minerals Supply In Europe
By H. Wagner
Recently a detailed study ?Minerals Planning Policies and Supply Practices in Europe? has been completed. The study, conducted on behalf of DG Enterprise, demonstrated that there are very few written
Jan 1, 2007
-
Flow Rate Measurement Of Non-Newtonian Suspensions From A Tank Using Notches
By R. Haldenwang, R. Erasmus, P. T. Slatter, R. P. Chhabra
Notches are used routinely for measuring the flow rate of water with free surface flows. As far as can be ascertained, no work has been done to investigate the performance of these flow rate measureme
Jan 1, 2007
-
Case Study - Total Life Cycle Planning for a Greenfield Site
Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl
Jan 1, 2007
-
Management Of Contaminated Soil And Groundwater: A Perspective For The Chilean Copper Industry
By A. Bezama
For over a decade European countries have addressed contaminated sites by developing technologies for managing both polluted soil and groundwater. This development has not only been driven by health a
Jan 1, 2007
-
Searching for the Optimal Heap Leach Application Rate
By O. Bernal
The Sociedad Minera Cerro Verde S.A.A, a subsidiary of Phelps Dodge Mining Company, operates a copper mining facility located in southern Peru. This "mine-forleach" operation currently produces 90,000
Jan 1, 2007
-
A Methodology to Control Peak Particle Velocity Levels at Multiple Locations by use of Electronic Detonators
By W. J. Birch, D. Leckenby, R. Farnfield
The use of electronic detonators to improve fragmentation is becoming universally accepted. However their use in limiting peak particle vibrations levels is still in its infancy. Most of which is anec
Jan 1, 2007
-
Exploitation Of A Massive Low Grade Zinc-Lead Resource At Rosh Pinah Zinc Corporation, Namibia
By S Rupprech, T Lund, H Fourie, PH van Rooyen, NM Vegter
Rosh Pinah Zinc Corporation (Pty) Ltd (RPZC) operates an underground mine at Rosh Pinah in southern Namibia producing zinc and lead sulphide concentrates. It currently mines around 0.7 Mtpa run-of-min
Jan 1, 2007
-
Differential Flotation Commissioning at Telfer
By C R. Headley, S O. Hille, N P. Jacob
The redevelopment of the Telfer Gold Mine in the Pilbara region of Western Australia was primarily based on the construction of a 17 Mtpa dual train concentrator coupled with open pit and underground
Jan 1, 2007
-
New Test Methodology For Estimating The Abrasiveness Of Soils For TBM Tunneling
By F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen
Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes
Jan 1, 2007
-
Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support
By Daniel Su
Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai
Jan 1, 2007
-
Numerical Information System Supporting Safe Management Of Copper Post-Flotation Tailings Pond "Elazny Most", Poland
By W. Swidzinski
"Zelazny Most" post-flotation copper mine tailings pond is the only place to of storeing wastes for KGHM POLSKA MI EDZ S.A. The flotation tailings is are the main waste stream in copper mining in Pola
Jan 1, 2007
-
Leaching of Bulk Flotation Concentrate as an Alternative to Treat a Complex Sulfide Ore
By C. A. Sosa-Blanco
Minera Sabinas in central Mexico treats a complex sulfide ore containing galena, chalcopyrite, sphalerite and argentite as valuable minerals, and in some cases important amounts of non-magnetic pyrrho
Jan 1, 2007
-
Liquidus Temperatures in Calcium Ferrite Slags Equilibrated with Molten Copper at fixed Oxygen Partial Pressures
By S. Nikolic
"Calcium ferrite slags are currently used in a number of copper-converting processes. Despite the industrial importance of this system the phase equilibria have not been fully investigated. Characteri
Jan 1, 2007
-
Application of Mobile Primary Crushing and Belt Conveying Systems for Iron Ore Mining
This paper briefly reviews the background of mobile primary crushers and their current main areas of application. The benefits of applying mobile primary crushing and belt conveying systems are analys
Jan 1, 2007
-
Balance of Feed Split to Ball Mills in Parallel
By E. You
The concentrator at Kennecott Utah Copper currently has 4 lines with a configuration of one SAG mill feeding two ball mills. The slurry that reports to each ball mill will vary resulting in an unequal
Jan 1, 2007
-
Performance Driver Trees for Optimising Open Pit Operations
Performance driver trees or KPI trees are reasonably well-known tools for analysing performance in mining operations. However, the tools are often not user friendly. They may be technically correct bu
Jan 1, 2007
-
Good Times at Arizona Conference Are Tempered With Concerns For the Future
By William M. Gleason
When SME’s 2006 Arizona Conference convened in December at the Hilton El Conquistador Resort in Tucson, AZ, there was considerable excitement among the 387 attendees. There was a noticeable buzz s
Jan 1, 2007
-
Support Of The Leipzig City—Tunnel Extension Using A Tie-Back Supported Freeze Wall
By Helmut Hass, Michael B. Gilbert
The extension of the commuter railway system (S-Bahn) in Leipzig, Germany willrequire the construction of an underground line crossing the downtown area of thecity to tie the Bavarian Station in the S
Jan 1, 2007
-
Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida
By H. E. Urtubia, C. W. Bailey
"BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L
Jan 1, 2007