Search Documents

Sort by

  • SME
    Risk Management In Action—Controlling Difficult Ground By Innovation

    By A. Moergeli

    The Swiss are building the world’s longest tunnel, the 57-Kilometer (35-mile) long Gotthard Base Tunnel. Lot 252, Tunnel Amsteg: Two Hard Rock Tunnel Boring Machines (TBM) crossed hydro-thermally deco

    Jan 1, 2007

  • ISEE
    Forthcoming European Directive on Pyrotechnic Articles

    By R. Wharton, M. Bagley

    The paper reviews the likely introduction of a European directive covering the sale of pyrotechnic articles in member states of the European Union. The background and structure of the directive are de

    Jan 1, 2007

  • SME
    Optimization And Increasing Throughput At Jacobina (a9df8bff-6540-4d54-8f51-771ea8d749a4)

    By R. Costa, A. Kozak, B. Fukuhara

    Introduction The Jacobina mine is located in the state of Bahia in northeastern Brazil approximately 330 km northwest of the state capital city of Salvador and 9 km from the town of Jacobina. The

    Jan 1, 2007

  • CIM
    Developments in Permanent Stainless Steel Cathodes within the Copper Industry

    By K. L. Eastwood

    The ISA PROCESSTM cathode plate is characterised by its copper coated suspension bar, coupled with a blade employing austenitic stainless steel alloy 316L. The blade material has become the mainstay o

    Jan 1, 2007

  • CIM
    On-Line Free Acidity Measurement of Copper and Other Base Metal Containing Solutions

    By M. Huang

    Electrodeless conductivity was employed to investigate the feasibility of continuous on-line monitoring of the free acidity of sulphate and/or chloride solutions of Cu and other base metals from vario

    Jan 1, 2007

  • CIM
    Combustion Synthesis of TIC/Al2O3 Composite and its Oxidation Behaviour

    By Z. I. Zaki

    Synthesis of TiC /A1203 Composite from TiO2, Al and graphite using combustion technique has been investigated at different initial temperatures; room, 400 and 600 °C. The effect of initial temperature

    Jan 1, 2007

  • SAIMM
    Manganese Removal From Cobalt Solutions With Dilute Sulphur Dioxide Gas Mixtures

    By J van Rooyen, S. Archer, M. Fox

    The use of dilute sulphur dioxide (SO2) gas mixtures for the oxidation/precipitation of manganese has been explored widely in recent years. The technical merit of the concept is well proven and implem

    Jan 1, 2007

  • CIM
    Non-Dispersive Solvent Extraction of Copper from Ammoniacal Solutions

    By M. L. F. Gameiro

    The aim of this study was to check the feasibility of non-dispersive solvent extraction to recover copper from ammoniacal solutions using hollow fibres as contactors. Data of mass transfer using the B

    Jan 1, 2007

  • AUSIMM
    Aggregate Size Optimisation Program at the Lafarge Marblehead Plant

    By C Smith, D Lilly

    The Lafarge Marblehead Plant in Marblehead, Ohio, USA produces 4.2 million tonnes of sized aggregate yearly. In 1997, a program was instituted to maximise primary crusher productivity through the opti

    Jan 1, 2007

  • SME
    Modeling For Real-Time Performance Measurement: A Strategic Approach

    By Russell Barr, Robert E. Cook

    As most mining companies are taking advantage of the high market prices for base metals such as steel, copper and zinc, numerous challenges still face them. While demand is strong from countries like

    Jan 1, 2007

  • AUSIMM
    The Myth of Dangerous Human-Caused Climate Change

    Human-caused global warming has become the environmental cause celebre of the early 21st century. The strong warming alarmist camp currently includes the United Nations, most Western governments, most

    Jan 1, 2007

  • ISEE
    Numerical Modeling of the Effect of High Stresses on Blast Induced Damage

    By A. S. Tawadrous

    The stress field around a detonating charge in a borehole was calculated using AUTODYN for a variety of in-situ stress conditions. Calculations were conducted for zero in-situ stress, hydrostatic cond

    Jan 1, 2007

  • AUSIMM
    Magnetite in Hydrothermal Orebodies and Host Rocks in the Proterozoic Belt Supergroup, USA û A Preliminary Report

    By S E. Box, J L. Mauk

    The Middle Proterozoic metasedimentary rocks of the Belt Supergroup contain important metallic mineral deposits like the diagenetic sediment-hosted stratiform copper mineralization, including the Troy

    Jan 1, 2007

  • SME
    Ergonomic Interventions At Vulcan Materials Company (7e1e12a8-2c8d-42fd-aede-72f57e60f631)

    By J. Torma-Krajewski, C. Hipes

    Many mining companies apply ergonomic principles, but it is done either informally and/or reactively. Examples of an informal approach include replacing worn equipment, such as seats, with models tha

    Jan 1, 2007

  • SME
    Hydro-Jex: Heap Leach Pad Stimulation Technology; Ready For World Wide Industrial Adoption?

    By T. Seal

    The Hydro-Jex technology has been used by Newmont Mining Corp. on the gold heap leach pads on the Carlin Trend - Nevada for three years to recover the inventory gold and change the chemistry in the pa

    Jan 1, 2007

  • CIM
    Data mining, mining data: Energy consumption modelling

    By S. Dessureault

    The relatively recent explosion of available data in all business sectors has induced a common expression of “drowning in data, starving for information.” The mining sector is affected by the informat

    Jan 1, 2007

  • AUSIMM
    Improvements in Truck and Shovel Scheduling Based on Capacity Constraint Modelling

    By P C. Hagan

    Production scheduling is often reliant on an estimation of a mineÆs trucking capacity. While this mechanistic approach is relatively simple, it often over-estimates actual throughput resulting in und

    Jan 1, 2007

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Uncertainty Based Push-Back Design Algorithm In Open Pit Mining

    By J. Gholamnejad

    In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi

    Jan 1, 2007