Search Documents

Sort by

  • SME-ICGCM
    Longwall Shield Recovery Using Mobile Roof Supports (64264c53-830d-4e84-b91e-78532103884a)

    By Frank Chase

    Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face

    Jan 1, 2007

  • ISEE
    Journal: 100 Years / Harper’s Weekly New York May 21, 1870 / (Continued from the March/April 2006 Journal of Explosives Engineering) / The Value of Detonating Caps in Blasting

    By Robert Hopler

    It is the nature of the initial detonation to the powder around the cap which governs the greater or less effect of the explosion of the whole charge. The cap communicates to the first particles of po

    Jan 1, 2007

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • AUSIMM
    Optimisation of Flotation Circuit Configuration at PT Newmont Nusa Tenggara

    By K McCaffery, R P. Halomoan

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • SAIMM
    Development Of A Mineral Flotation Frother For Nchanga Mine On The Zambian Copperbelt

    By H Zimba, S Sondashi, M Chitambo

    By the time a reagent is finally accepted by a mine for use on its plant it could have gone through several screening and evaluation stages. These stages may include laboratory and plant evaluation te

    Jan 1, 2007

  • AUSIMM
    Project-Finance Risks ù Due Diligence Matters

    Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/

    Jan 1, 2007

  • AUSIMM
    Validation of the AMIRA P9 Flotation Model Using the Floatability Characterisation Test Rig (FCTR)

    By J-P Franzidis

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant. It was developed as part of the AMIRA P9 project, primarily to determine ore floatabilit

    Jan 1, 2007

  • SAIMM
    Evaluation Of Exploration Projects (01da8ac4-b154-4819-9d4f-fbf56eeb33f9)

    By A. Morley

    It is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment

    Jan 1, 2007

  • AUSIMM
    Rockfall Hazard Mitigation Best Practice

    By A Teen

    An open cast mine on the West Coast of the South Island of New Zealand proposes to remove up to 30 m of overburden to access an ore body neighbouring National Reserve land. Part of the conditions of t

    Jan 1, 2007

  • SAIMM
    Optimisation Of Flotation Circuit Configuration At PT Newmont Nusa Tenggara (cfd7ecd0-efe3-4487-b843-71559e2ce6be)

    Two column flotation cells have been installed as single-stage rougher cleaners at Batu Hijau. The objective was to provide additional residence time in the cleaner circuit to maintain maximum recover

    Jan 1, 2007

  • DFI
    Full-Scale Tests To Evaluate Lateral Pile Resistance At The Edge Of A Slope

    By Artak D. Mirzoyan

    Pile foundations near the edge of a slope are often required to resist lateral loads. This is particularly important for piles at abutments of bridges. However, very few full-scale tests are availab

    Jan 1, 2007

  • SME
    Methods For Determining Roof Fall Risk In Underground Mines (e9e99c27-c4ac-4dc4-b19d-607c245139c5)

    By T. Bajpayee, L. Prosser, A. Iannacchione

    Reducing the number of roof fall injuries is a goal of the NIOSH mine safety research program. Central to this effort is the development of assessment techniques that will help to identify the nature

    Jan 1, 2007

  • AUSIMM
    Advances of Iron Ore Beneficiation in China

    China has large amounts of iron ore reserves, but iron ore in China, with low-grade, small disseminated particles and many other associated minerals, is difficult to dress. In recent years, with the f

    Jan 1, 2007

  • SME
    Calcium Activated Stablization And Costruction Of Road With Fly Ash

    By S. Mishra, C. Shon, D. Saylak

    Only 40% of fly ash generated by the power plants in US are recycled and used for commercial applications. Of these, the high lime, Class C ash had been preferred. Systematic laboratory and field-scal

    Jan 1, 2007

  • AUSIMM
    The Use of Continuous Materials Handling Equipment in an Open Cut Iron Ore Mine

    The scarcity of truck tyres combined with decreases in the availability of labour, increases in fuel costs and a buoyant international economy driving project budget blowouts, have all combined to cha

    Jan 1, 2007

  • SME
    Blasor – A Generalized Strategic Mine Planning Optimization Tool

    By B. Law, M. Menabde, B. Baird

    Blasor is a new mine planning tool which is being used in the long and medium-term optimization of multi-open-pit operations throughout BHP Billiton’s Base Metals and bulk commodities portfolio. It i

    Jan 1, 2007

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • CIM
    Recent Smelting & Acid Plant Operation at Saganoseki Smelter

    By F. Hashiuchi

    In 1996, the Saganoseki custom smelter & refinery successfully shifted to a single flash smelting furnace operation and increased the copper production capacity to 450,000mtpy in 1998. As the next ste

    Jan 1, 2007

  • SME
    Determination Of A Mining Cutoff Grade Strategy Based On An Iterative Factor

    By A. Bascetin, A. Nieto

    One of the most difficult problems in mining operation is how to determine optimum cutoff grades of ores at different periods over the lifespan of the mine that will maximize the net present value (NP

    Jan 1, 2007

  • CIM
    Application of Passive Sonar Technology to Mineral Processing and Oil Sands Applications “If you can measure it, you can manage it.”

    By Mark Fernald, Christian O’Keefe, John Viega

    "In this presentation, the SONARtrac™ technology platform will be described. CiDRA's proprietary clamp-on, passive sonar array-based flow meter technology performs two independent measurements – flow

    Jan 1, 2007