Search Documents

Sort by

  • SME
    Factors Affecting Tree Growth In Bauxite Mining Wastes

    By C. Tsiouvaras

    Restoration of bauxite mining areas constitutes a difficult issue to address due to the destruction of the vegetation and soil decay of the excavated area. In this study woody species growth, in relat

    Jan 1, 2007

  • CIM
    Upsets on Antimony Content in Electrolytic Copper Produced at Caraiba Metais

    By I. M. Santos Moraes

    The control of minor impurities (mainly As, Sb and Bi) in copper refineries has been a great challenge. Caraiba Metais' copper refinery produces a very high quality copper, registered in LME as g

    Jan 1, 2007

  • AUSIMM
    Strategic Planning for the Future of Illawarra Coal

    In the future, Illawarra Coal, the primary metallurgical coal producer in the southern coal fields of New South Wales, will face many unique challenges not found in other coal or minerals production a

    Jan 1, 2007

  • SAIMM
    The Development Of A Metallurgical Flowsheet To Treat Tails

    By H. Jeram

    The ilmenite, rutile and zircon processes of the mineral separation plant generate tailing streams, which still contain valuable mineral. This is due to a combination of factors, which include separat

    Jan 1, 2007

  • SME
    Study Of Stability Of Mercury And Silver Polythiocarbonate Nanofilms Generated During Optimized Mercury Removal From Cyanidation Pregnant Eluate

    By C. Bucknam, M. McComb

    Mercury and silver polythiocarbonate sludge that was generated from the pilot testing of optimized mercury removal from cyanidation pregnant eluate solutions prior to Merrill-Crowe recovery of gold an

    Jan 1, 2007

  • CIM
    Phase Relations and Activities of Arsenic and Antimony in the Cu-O-As and Cu-O-Sb SYSTEMS at 1523 K

    By L. Voisin, K. Yamaguchi, D. G. Mendoza, K. Ltagaki

    The behavior of arsenic and antimony in the Cu-0 system was thermodynamically investigated to understand their elimination during a blister-making stage in copper smelting. Firstly, the phase relation

    Jan 1, 2007

  • CIM
    Pilot-Scale Evaluation for the Codelco Continuous Converting Process

    By A. Moyano

    The development of the traditional converting process performed in a PeirceSmith or Hoboken converter is limited by the investment magnitude associated to the fulfillment of the environmental regulati

    Jan 1, 2007

  • SME
    Steeluniversity.Org: A New Internet E-Learning Resource On Sustainability

    By J. Pflieger

    The International Iron and Steel Institute (IISI - http://www.worldsteel.org) has initiated the development of a comprehensive freely-available, internet-delivered package of highly interactive e-lear

    Jan 1, 2007

  • AUSIMM
    The Application of PIMA to Alteration Mapping of the Hyde-Macraes Shear Zone, Otago, New Zealand

    By L Reynolds

    The portable infrared mineral analyser (PIMA) was trialled to determine the extent and intensity of any hydrothermal alteration halo associated with gold mineralisation in the Hyde-Macraes Shear Zone

    Jan 1, 2007

  • SAIMM
    Innovated Solutions For Automated Charging And Stoking

    By J. Dienenthal

    Automatic Charging and Stoking Machines for use at ferroalloy furnaces are in operation for more than 20years. Dango & Dienenthal Maschinenbau GmbH (short: DDS) has developed several machine generatio

    Jan 1, 2007

  • CIM
    Innovations In Hydrometallurgical Performance Management: Heap Leaching Solvent Extraction And Electrowinning Plants

    By O. A. Bascur

    Several new hydrometallurgical plants have been built in the past years, new processes and equipment as well as advanced process control systems are being used to deal with the increasing requirements

    Jan 1, 2007

  • CIM
    Gold recovery from waste-activated carbon— a comparison between mechano-chemical pretreatment and charcoal augmented oxidation

    By W. K. Buah, R. K. Amankwah

    Waste-activated carbon generated by gold ore processing plants that employ carbon adsorption technologies may contain very high gold values and represent a potential source of extra revenue. In this r

    Jan 1, 2007

  • SAIMM
    Intelligent Gearing System - Solution To Understand And Correct Operational Conditions That Reduce he Fatigue Life Of A Girth Gear

    By David Brown, Dirk van Dyk

    Horizontal rotating mills are being used all over the world associated with different mineral and power generation industries. David Brown South Africa, with over 140 years of experience in gear manuf

    Jan 1, 2007

  • SAIMM
    Ilmenite Smelting: The Basics

    While some of the practical details of ilmenite smelting are not well documented, there is a substantial body of literature on the principles of ilmenite smelting, and the behaviour of solidified tita

    Jan 1, 2007

  • SME
    Premature Mine Closures - Causes And Effects

    Over 800 mines have closed in Australia in the past 25 years. This paper summarizes the data obtained from those closures and includes all Australian States and Territories and all commodities, includ

    Jan 1, 2007

  • CIM
    Modelling of Two-Phase Flow in a Solvent Extraction Pulsed Column

    CFD (Computational Fluid Dynamic) models have been developed and validated for a pulsed column with disk-doughnut internals, as used for solvent extraction. First a single phase model was developed to

    Jan 1, 2007

  • SME
    Improving Coarse Particle Flotation For Energy Savings

    By H. Do, R. Yoon

    Mineral flotation is effective over a relatively narrow particle size range of approximately 10 to 100 µm. If the upper particle size limit can be increased, however, a run-of-mine ore may be coarse g

    Jan 1, 2007

  • SAIMM
    A Comparison Of The Effect Of Chemical And Bioleaching On The Kinetics Of Sphalerite Leaching.

    By J. W. van der Merwe, C Strydom, D. C. Odendaal, M. I. Sampson

    Keywords: Sphalerite, Bio leaching, Chemical leaching Sphalerite concentrates were prepared from tailings dam samples obtained from Rosh Pinah Mine in Namibia. The samples were subjected to froth f

    Jan 1, 2007

  • ISEE
    Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation (d38b618a-cd5f-421d-af88-424d08f01edd)

    By Dale S. Preece

    A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would

    Jan 1, 2007

  • SAIMM
    The Market & Cost Environments For Bulk Ferroalloys

    By Andrew Jones

    This paper discusses the worldwide market and cost environments for the bulk ferroalloys namely manganese alloys (ferromanganese, silicomanganese), ferrosilicon and ferrochrome (high-carbon ferrochrom

    Jan 1, 2007