Search Documents

Sort by

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009

  • CIM
    Introduction to the SMART Benchmarking Program

    By Tom Demorest

    SMART is an association of mining companies that meet regularly to coordinate the technology development needed by the mining industry. Since 1995, the member companies and institutions have directed

    May 1, 2009

  • CIM
    Radial Flow Permeability Testing of Indiana Limestone

    By P. Mattar

    The geotechnical importance of studying fluid flow through porous media and soils in particular, becomes evident when dealing with groundwater movement in surficial geomaterials that can be initiated

    May 1, 2009

  • NIOSH
    Escape from Farmington No. 9 An Oral History - Background

    By Michael J. Brnich

    On November 20, 1968, a massive explosion rocked the underground workings of Mountaineer Coal Co.?s Farmington No. 9 Mine in West Virginia. Of the 99 miners who were working in the mine at the time of

    May 1, 2009

  • CIM
    Slope Stability Radar for Managing Rock Fall Risks in Open Cut Mines (f7671fea-c20b-4d8f-92db-191a4e6e4965)

    By Neal Harries

    Ground movement is normal in open cut mining operations, mainly caused by excavation response and blasting. Movement of the ground can be acceptable provided it is not unexpected and catastrophic. How

    May 1, 2009

  • CIM
    Investigation on the Mechanism of Coal Mine Bumps and Relating Microscopic Experiments

    By Y. X. Zhao

    This paper briefly describes the characteristics and induced factors of coal mining bumps based on the investigation of recent bumps accidents occurred in China. According to the theory of non-equilib

    May 1, 2009

  • CIM
    National Strategy Overcoming HR Challenges in the Canadian Mining Industry

    Session 1 ? Intro to MiHR ? Business Case for Aboriginal Inclusion ? Overview of the Mining HR Guide for Aboriginal Communities ? Two presentations of Programs featured in the Guide ?? The RAP Pr

    May 1, 2009

  • CIM
    New Discoveries in the Relationship Between Macro and Micro Grindability

    By John Starkey

    This paper examines 5 years of SAGDesign testing data with particular emphasis on the grinding test results from two recent projects, the Fortune Minerals Limited NICO project, and the Aurora Energy R

    May 1, 2009

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009

  • CIM
    Considerations for Technology Introduction Under the Explosive Free Rock Breakage Explosive-Consortium

    By Bétournay. M. C.

    Advantages ?Safety ?Health ?Rapid, continuous development, productivity ?Stope dilution reduction Disadvantages ?High cost and long time for equipment development ?Hard rock mining condition l

    May 1, 2009

  • CIM
    Influence of Shear Surface Geometry on Deformation Processes in Massive Landslides

    By K. S. Kalenchuk

    Massive landslides display complex deformation processes. For instance, slope movements of the Downie Slide, monitored using borehole inclinometers, extensometers, and survey monuments, show considera

    May 1, 2009

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009

  • CIM
    In-Situ Measurements of Cemented Paste Backfill in Long-hole Stopes

    By Ben D. Thompson

    Cemented Paste Backfill has proven to be of critical importance to the operation of a number of Canadian mines, primarily due to the rapid backfilling rate this method permits. In order to improve the

    May 1, 2009

  • CIM
    Quantifying the rate of Corrosion in Selected Underground Mines

    By J. F. Dorion

    This paper presents the results of on-going investigations on the performance of support systems in Québec underground mines. The focus of these investigations is on site observations complemented by

    May 1, 2009

  • CIM
    Prevention and Control of Rockbursts in Dongguashan Copper Mine

    By L. Tang

    A seismic monitoring system was installed in 2005 at Dongguashan Copper Mine, the deepest metal mine in China. Based on the seismic events monitored in situ, the possibility of rockburst prediction an

    May 1, 2009

  • CIM
    Dynamic Testing of Threadbar used for Rock Reinforcement

    A comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation

    May 1, 2009

  • CIM
    Weak Rock Mass Span Design ? Best Practices

    By A. Ouchi

    This paper presents ground control best practices in weak rock environments including the "Unsupported" Weak Rock Updated Span Design Curve and awareness pertaining to the potentially detrimental effe

    May 1, 2009

  • CIM
    Regional-Scale Paleoclimate Influences on a Proposed Deep Geologic Repository in Canada for low and Intermediate Level Waste

    By S. D. Normani

    A Deep Geologic Repository (DGR) for Low and Intermediate Level radioactive waste has been proposed by Ontario Power Generation for the Bruce Nuclear site in Ontario, Canada. The DGR is to be construc

    May 1, 2009

  • CIM
    An in-Shovel Camera-based Technology for Automatic Rock Size Sensing and Analysis in Open Pit Mining

    By Shahram Tafazoli

    This article presents a novel technology for sensing the size of rocks after blasting in hard rock mines. Blast engineers require rock size statistics to carefully adjust the blasting parameters. The

    May 1, 2009