Search Documents

Sort by

  • CIM
    Current Technical Reports Under NI 43-101

    By Greg Gosson

    These materials are provided for general information purposes only and do not constitute legal advice. Readers are advised to seek specific legal advice from their own counsel in relation to any decis

    May 1, 2009

  • CIM
    Variable Frequency Drives as Applied to Ventilation Systems

    By Cheryl L. Allen

    The power required to operate a ventilation system can be 25% to 50% of the total energy requirements of a mine. In an effort to reduce energy consumption, initiatives are being introduced at Vale Inc

    May 1, 2009

  • CIM
    NASA Lunar Mining and Construction Activities and Plans

    By Gerald Sanders

    Presentation Topics ? We?re Going to the Moon Again? ? What is Lunar Mining ? In-Situ Resource Utilization? ? What Are The Challenges to Lunar Mining? ? What is NASA Currently Doing?

    May 1, 2009

  • CIM
    3-Dimensional Numerical Modelling of Stope Sequencing for Mine Planning

    There are many inherent risks in creating a mine plan for a new ore zone in an underground mine; one of such risks is the redistribution of stresses that could be a cause of instability. Using numeric

    May 1, 2009

  • CIM
    Burr Project Potash Mine Development

    Burr Mineral Resource has: ?Grade / Thickness / Tonnage ?Dry Caprock ?Low Carnallite ?Low Clay / Insolubles ?Flat & Continuous Deposit ?Proper depth

    May 1, 2009

  • CIM
    Use of a Stereo-Topometric Measurement System for the Characterization Of Rock Joint Roughness In-Situ and in the Laboratory

    By B. S. A. Tatone

    The surface roughness of unfilled rock discontinuities has a major influence on the deformational and hydraulic behaviour of discontinuous rock masses. Although it is widely recognized that surface ro

    May 1, 2009

  • CIM
    Poroelastic Modelling of Production and Injection-Induced Stress Changes in a Pinnacle Reef

    By H. Soltanzadeh

    This paper summarizes semi-analytical and closed-form solutions that can be used to assess the poroelastic stress changes induced within a porous formation (reservoir) during a pore pressure change. F

    May 1, 2009

  • CIM
    Improving Mineral Project Performance

    By Frederick Biery

    Outline ? Project Challenges ? Results from 100 recent projects ? What factors are driving the best and worst projects ? A look at recent mining projects ? Conclusions

    May 1, 2009

  • CIM
    Dynamic Tests of a New Type of Energy Absorbing Rock Bolt ? The D Bolt

    By C. C. Li

    The D bolt is a new type of energy-absorbing rock support element recently developed in Nor-way. The D bolt is not only able to accommodate large rock deformations, but can also provide a load-bearing

    May 1, 2009

  • CIM
    Earth Moving Equipment Safety Round Table - The EMESRT Story (2006-2008)

    Mining companies around the globe have long struggled with the need to ensure that earth moving equipment is designed to be operated and maintained under all site conditions without causing harm to pe

    May 1, 2009

  • CIM
    Liven up your talent Acquisition Strategies with Social Media

    Situation Brands & Employment Value Propositions of mining sector firms are perceived negatively Competitive labour market is generally not aware of the diversity of mining careers Jobs requiring

    May 1, 2009

  • CIM
    Get More Reliable Production from Existing Mobile and Fixed Assets ?Technology Advancements to Optimize Asset Performance

    By Keith Donovan

    Why are we here? Improve equipment performance & health ? Eliminate undesirable downtime and expensive secondary damage ? Maximize equipment life, optimize running costs (reduce costs) ? Improve s

    May 1, 2009

  • CIM
    An Improved Definition of Rock Quality Designation, RQDc

    By L. Li

    The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet

    May 1, 2009

  • CIM
    Measurement of Surface Roughness of Rock Discontinuities

    By G. V. Poropat

    Roughness of a discontinuity may be an important factor influencing shear strength of the discontinuity. Traditionally, determining the roughness of a discontinuity surface and providing a numerical m

    May 1, 2009

  • CIM
    The use of Engineered Wetland Technology for Long Term Minewater Treatment at Closed Minestreatment Mines

    CONSTRUCTED WETLANDS (CWs) ?Human-Constructed ?Built Specifically to Remove Contaminants ?Can Treat a Wide Variety of Wastewaters Including Stormwater(SW) ?Three Major Kinds ?Pond Wetlands ?Fr

    May 1, 2009

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    Waste Land to Biofuel Source

    By Alan S. Lock

    Large scale feasibility studies for the establishment of oil-seed and cellulose producing crops on mine tailings have been successfully conducted over 1 growing season with the purpose of these crops

    May 1, 2009

  • CIM
    How 3D Images Support Rock Engineering

    By Andreas Gaich

    COMBINED 3D IMAGES _ Highly detailed 3D geometry _ Identification of fine fractures together with a general impression of the situation _ Dealing with unfavourable outcrop geometries

    May 1, 2009

  • CIM
    Pavoncelli Tunnel Case Study

    This paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L

    May 1, 2009

  • CIM
    A New Analytical Model to Simulate SAGD Process Considering Geomechanics

    By A. Azad

    SAGD (Steam Assisted Gravity Drainage) is an in-situ oil recovery technique for heavy oil reservoirs. The technique has been successfully applied to many projects in the past 25 years and the process

    May 1, 2009