Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Hydraulic Handling in Mining Fully Automatic Large-Scale Test Unit on a Practical Scale
The process of hydraulic transport through pipelines, worldwide well known for the transport of fine-grain solids is also being used to a greater extent in mining for the handling of primarily coarse-
Jan 1, 1980
-
Predicting and Optimising the Strength of Cemented Paste Fills
By Kanhaiya Mishra, Phanil. K. Mandal, S. K. Behera, P. S. Paul, Prashant Singh, C. N. Ghosh
The techno-economic and social benefits of cemented paste backfill (CPB) resulted in its wide acceptance by the mining industry. The Ordinary Portland Cement (OPC) remains the key binder but to dimini
Jul 14, 2022
-
Process for deep concentration of iron ores
By Sarra Scherbakova, Alexander Kurkov, Andrey Egorov
"Deep concentration of iron ores involves extraction, in addition to magnetite concentrate, of hematite and martite concentrates and recovery of other valuable components. A flotation technology was d
Jan 1, 2014
-
Collision probability of fine particles in the bubble wake - An experimental study with 4D particle tracking velocimetry, A.-E. Sommer, S. Heitkam, and K. Eckert
By K. Eckert, A. E. Sommer, S. Heitkam
One highly relevant challenge in flotation is the recovery of fine particles. Due to their low inertia, these particles are mostly pushed aside by rising bubbles. Consequently, they typically exhibit
Jan 1, 2020
-
Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump
By R Van Laeren, G Langerak, S Fityus, K Koosmen
Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal
Jul 27, 2015
-
Deriving maximum value from mineral waste streams
By D Osborne
Current mineral extraction and valorisation activities still have a strong focus on the ‘delivered product(s)’ which might be a bulk commodity such as metallurgical coal, hematite, bauxite, etc., and
Sep 1, 2024
-
Study On The Enhanced Flotation Of Pyrrhotite
By Ye Junjian
The feed ore is the concentrate of low intensity magnetic separation of pyrite tailings, containing TFe47.47%, S19.41% and SiOpyrrhotite. The exploratory tests showed that using a process of flotation
Sep 1, 2012
-
Hydrometallurgical Treatment of Port Kembla Copper-Smelter Fume
By Boden A
A procedure was developed for recovering metal values from copper-smelter fume. The fume is first leached to neutrality with dilute sulphuric acid to obtain a solution of zinc sulphate containing a lo
Jan 1, 1977
-
Golconda Cyanide Regeneration Process
By Peter W. Willcocks
The Cyanide Regeneration Process (CRP) was developed by Golconda Engineering and Mining Services and installed at Golconda's Beaconsfield Gold Tailings Retreatment Project situated in Tasmania, Austra
Jan 1, 1998
-
Recovery Of Mercury From Amalgamation Tailing, Buffalo Mines, Cobalt (681f3240-5f15-46ef-82ee-c3313e82f45e)
By E. B. Thornhill
Discussion of the paper of E. B. THORNHILL, presented at the San Francisco meeting, September, 1915, and printed in Bulletin No. 104, August, 1915, pp. 1653 to 1670. D. B. HUNTLEY, Oakland, Cal.-Abou
Jan 12, 1915
-
Uranium Mill Waste Disposal ? Introduction
By Robert G. Beverly
The presence of radioactivity in uranium mill wastes has resulted in somewhat unique waste disposal methods. In addition to the common problems of disposing of large quantities of solid wastes, neutra
Jan 1, 1968
-
Investigation of the Process of Cobalt and Nickel Sulphation from Pyrite Concentrate and Nickel Matte
By Abishev D. N, Balakirev V. F, Davydov G. I
The problem of recovery of cobalt products from poorly oxidised nickel ores (Kempirsaisk deposit) and pyrite concentrates with a low content of cobalt (Sokolovsk-Sarbaisky deposit) has not been sol
Jan 1, 1996
-
Mexican Paper - The Treatment of Clay-Slimes by the Cyanide Process and Agitation
By E. A. H. Tays, F. A. Schiertz
In 1893 the Anglo-Mexican Mining Company, Limited, purchased the Guadalupe and adjoining mines, and, after opening up the Guadalupe, constructed a 20-stamp mill, which was started in August, 1894.
Jan 1, 1902
-
Development And Evaluation Of A Urethane Jacketed Tail Roller For Continuous Mining Machines
By J. Shawn Peterson, David S. Yantek, Adam K. Smith
Occupational noise-induced hearing loss continues to be one of the most pervasive health problems in the mining industry, despite over 25 years of regulation. One of the loudest pieces of equipment u
-
Barrick Goldstrike Roaster Facility Dry Grinding And Leaching
By D. Denton, L. Buckingham
The dry grinding and leaching circuits of the Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of
Jan 1, 2001
-
CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone
By Peter Dunn
London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for
May 1, 2011
-
Case Studies with the Falcon Concentrator
By G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante
"A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a
Jan 1, 1993
-
Barrick Goldstrike Roaster Facility Dry Grinding and Leach
By Dayle Denton, Lloyd Buckingham, Kenneth G. Thomas, Jacques McMullen
"The dry grinding and leaching circuits of Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of the
Jan 1, 2001
-
Research on the Influence of Grain Size Composition on Cassiterite Recovery
By T. Guan, G. Fu, X. Zhou, L. Deng
"One kind of tailings from gravity separation of polymetallic mine contains 0.5–0.8% SnO2. The proportion of –0.037 mm size fraction of the tailings is 37.12%, and the distribution rate of SnO2 is 60.
Jan 1, 2016
-
Development of the Rainy River Gold Project and Processing Plant
By Paolo Toscano, Dave Hall
"This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m
Jan 1, 2016