Search Documents

Search Again

Search Again

  • SME
    Tailings Disposal (a95e7aed-62e5-40b4-9aa4-6e0c56901a53)

    By Norman L. Weiss

    The full importance of tailings disposal is yet to be realized by the mining industry, but our awareness of its present and future implications is growing faster, perhaps, than any single phase of ore

    Jan 1, 1985

  • TMS
    Selecting An Economical And Safe Tailings Disposal

    By Han Ilhan

    This paper discusses and describes aspects of a cost effective and safe tailings impoundment selection. In light of the current low metal prices and recent tailings embankment failures around the worl

    Jan 1, 1999

  • SME
    Geochemical Aspects Of Seepage From Mill Tailings

    By K. O. Johnson

    Contaminant transport of mine and mill tailings is controlled by the hydrologic flow regime and the geochemical mobility of the contaminants. Contaminant' mobility is primarily determined by chem

    Jan 1, 1988

  • IMPC
    Research and Practice on Old Tailings Reutilization

    By Y. P. Huang

    Experiment results and operation practice on reutilizing old tailings dumped at SCIM (Shang-chang Iron Mine) of KISCO (Kunming Iron and Steel Corp.) are presented. In a production period over 30 years

    Jan 1, 2014

  • SME
    Water Conservation By Sub-Aerial Tailings Deposition

    By D. R. East

    The concept of sub-aerial tailings deposit.ion using a managed rotational deposition system to form a deposit of partly-saturated tails for North American conditions was introduced by Knight and descr

    Jan 1, 1989

  • SME
    Recovery Of Anthracite From Preparation Plant Tailings

    By M. S. Klima

    Tests were conducted to investigate the potential for recovering anthracite from preparation plant tailings. Samples were collected from tailings streams or slurry ponds of several anthracite cleaning

    Jan 1, 1995

  • SME
    Mechanisms Controlling Metal Release in Mill Tailings

    By Jasna Jurjovec, David W. Blowes, Carol J. Ptacek

    At the Kidd Creek site, natrojarosite residue, derived from the zinc refinery circuit, is mixed with mill tailings before final disposal in the tailings impoundment. Column experiments were conducted

    Jan 1, 2000

  • SME
    Gypsum Tailings Pond Design Kimberly, British Columbia

    By George C. Toland

    Tailings disposal has been a problem for the mining engineer since the beginning of the metal milling process. Disposal systems in common use have evolved as the most economic method for the disposal

    Jan 1, 1971

  • SME
    Site And Method Evaluations For Tailings Disposal

    By Rob Dorey

    The disposal of mine waste continues to be one of the main controlling factors in the economics and feasibility of project development. Particular to gold and precious metal mining, waste disposal is

    Jan 1, 1998

  • SME
    Co-disposal Of Tailings And Mine Waste

    By Kevin Phelan, Gary Johnson, Peter Sperring

    The vast majority of tailings in the Western Australian Goldfields are deposited in purpose-built storage facilities. At mine-sites with open-pit mining operations there is also the requirement to min

    Jan 1, 1995

  • CIM
    The Hydraulic Construction of Mine Tailings Dams

    By B. Hoare, H. M. Hill

    "SYNOPSISTailings volumes, disposal systems, effects of dam failures, construction materials, and concentrator process water volumes are discussed. Earth dams and tailings dams are discussed in detail

    Jan 1, 1970

  • AIME
    Stability Enhancement Of Tailings By Horizontal Drainage

    By Joseph G. Franzone, Alan K. Kuhn, Jerry J. Oliver

    INTRODUCTION Tailings produced by many uranium milling operations consist of fine sands with some silt and slimes. When fine sandy materials are placed by hydraulic methods behind an impermeable d

    Jan 1, 1982

  • SME
    Tailings Management for Cyanide Leach Gold Plants

    By Peter C. Lighthal, Harvey N. McLeod, Iain G. Bruce

    This paper describes the practical aspects of handling cyanide leach tailings. Alternative systems for cyanide destruction are briefly discussed. The provision of adequate retention time to allow natu

    Jan 1, 1987

  • CIM
    Rehabilitation of Tailings Areas of Uranium Mines

    By A. J. Vivyurka

    "This is a talk about the experiences that Rio Algom Mines Ltd. has had in the Elliot Lake uranium area trying to make the tailings more compatible with the surrounding environment. To get a better id

    Jan 1, 1975

  • AUSIMM
    Legume and Grass Revegetation of Mine Tailings

    By C P. C David, J P. T Domingo

    Addressing nutrient deficiency, among other factors, is vital to the growth and establishment of plants in mine spoils and tailings ponds. Although several organic amendments are available for this pu

    Jul 16, 2014

  • AUSIMM
    Assessing static liquefaction for upstream tailings dams

    By A Litwinowicz, M Laxman, A Fourie, A L. Li

    This paper presents a design approach and analytical methods that were used for assessing the potential of static liquefaction and developing the mitigation measures for a tailings dams. The rigour of

    Jul 1, 2021

  • IIMP
    Geomembranes mitigate environmental issues in tailings dams

    By Pascual Perazzo Vaschetti Gabriella

    The increasing emphasis on environmental issues has crucial importance in mining projects, hence in tailings dams. Their water barrier needs a two-fold environmental assessment: the environmental impa

    Sep 30, 2022

  • CIM
    The Systematic Reclamation of Gold Mine Tailings

    By Jean-Claude LeRoy, Herman Keller

    "INTRODUCTIONEROCON's work is the reclamation of mine wastelands. It has had considerable experience in particular in the reclamation of gold mine tailings in the Canadian Shield since the latter part

    Jan 1, 1975

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • CIM
    Settlement of Tailings Slurries by Creep Compression

    By J. Don Scott

    Analytical predictions of the rate and magnitude of settlement of deposited oil sands tailings slurries generally overestimate how fast pore pressures will dissipate. Field deposits of nonsegregating

    May 1, 2004