Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 8938 - Laboratory Processing and Characterization of Waste Materials From Manganese Nodules
By B. W. Haynes
This Bureau of Mines report describes the laboratory processing of manganese nodules and the results of tailings characterization obtained during the cooperative program with the Department of Commerc
Jan 1, 1985
-
The use of gravity and magnetic separation to recover copper and lead from Tsumeb flotation tailings
By J. Svoboda, W. J. C. Venter, R. N. Guest
The use of gravity or magnetic separation followed by upgrading on a shaking table recovered about 25 per cent of the copper and lead minerals, at a combined metal grade of 20 per cent, from the final
Jan 1, 1988
-
Reducing mining tailings and operational dilution: a new application of the room-and-pillar mining method
By G. de Tomi, G. C. Teodoro, E. Rodovalho, T. M. El Hajj, J. A. S. Tenório
The selection of an underground mining method stems from a multivariate analysis that considers geomechanical, geological, economic, and operational parameters. Even after identifying the most compati
Sep 9, 2024
-
Water-related Data Requirements for Improved Life Cycle Assessment of Mining, Mineral Processing and Tailings Management
By G Mudd, N Haque, S A. Northey
Life cycle assessment (LCA) provides an internationally standardised framework for estimating the environmental impacts associated with products or services (International Organisation for Standardisa
Jun 28, 2016
-
Experimental Study on Pre-Discarding Tailings for a Low Grade Complex Multi-Metals W-Mo Ore
By Liu Jin
"In order to reduce the dosage costs and increase the economic benefits of a full floating process in a low grade complex multi-metals W-Mo ore, based on the study of the magnetic characteristics of t
Jan 1, 2018
-
Designing Self-Sustaining Tailings Management Facilities: A Case Study From Silvermines Rehabilitation Project, County Tipperary, Ireland
The Silvermines area of north County Tipperary in Ireland has experienced mining activity for over a thousand years, with lead, zinc, copper, barite and sulphur being extracted from a series of Carbon
Aug 1, 2013
-
OFR-13-74 Solutions To Problems Of Pollution Associated With Mining In Northern Idaho
By Dale R. Ralston
This investigation was divided into two major phases. Phase I of the study was an examination of the occurrence and production of acid water within the Bunker Hill Mine in northern Idaho. The second p
Jan 1, 1973
-
The New Paradigm for Phytostabilising Mine Wastes – Ecologically Engineered Pedogenesis and Functional Root Zones
By T Baumgartl, L Zhou, D Mulligan, L Huang
The rapid production and accumulation of mineral processing wastes in the environment can present serious threats to environmental quality and human health. Phytostabilisation with native plant ecosys
Jul 16, 2014
-
A New Approach To Fine Solids Dewatering
By C. St. J. Lowe
Weir Minerals ? Linatex has developed a new approach to the dewatering of fine solids, particularly mine and process plant tailings and wastes. The Weir process, patented in 2009, uses standard proce
Feb 23, 2014
-
The Brukunga Pyrite Mine ù A Field Laboratory for Acid Rock Drainage Studies
By R C. Cox
The Brukunga pyrite mine was operated from 1955 to 1972 to supply feedstock for sulfuric acid production in the South Australian fertilizer industry. Iron sulfide ore, mined by Nairne Pyrite Ltd, was
Jan 1, 2003
-
Process Mineralogy Based on Mineral Liberation Analyser (MLA) and Phosphorus Recovery for a Fine Phosphate Tailing
By Song Mao, Local Joint Engineering Lab of Efficient Util of Dominant Mineral Resources from Karst Regions, Guizhou Key Lab of Comprehensive Utilization of Non-metallic Mineral Resource, Xianhai Li, Qin Zhang, unjian Ye, Guizhou University, Wei Cheng, Zhihong Liu
"Phosphate tailing is a kind of industrial waste that emitted from separation processing of phosphate ores, which is usually discarged to the tailing pond without treatment. Recovery of phosphorus fro
Jan 1, 2016
-
CIL Gold Leaching and Adsorption with a Deficiency in Free Cyanide
By Derham DW, Newcombe LA
The operations of the Mount Morgan gold tailings retreatment plant were significantly improved in 1984 by the desliming of the CIP plant feed, which reduced cyanide consumption and increased percen
Jan 1, 1993
-
Shiralgin Mining and Processing Complex- Case Study of Gold Deposit Development in the Kyrgyz Republic
By A. V. Golovanov, A. V. Mihailova
"NPO RIVS employs complex approach to engineering and design of the new facilities in close cooperation of Mining, Research, Hydrometallurgy, Design, Construction, Power Supply, Automation, Production
Jan 1, 2018
-
OFR-161(4)-82 Probabilistic Modeling Of Tailings Embankment Designs - Volume II - Model Application And Verification
By Loren R. Anderson
A probabilistic slope stability computer model was developed at Utah State University and independently evaluated by CH2M Hill Consulting Engineers as a design and analysis tool. Volume I of this repo
Jan 1, 1982
-
Determining Radon Attenuation Of Cover Materials Using Field Experimentation
By K. E. Robinson, G. Re, L. Skoski
Introduction A new technology is evolving as a result of growing industry and government concerns over the potential impacts of possible airborne emissions from uranium tailings piles. A major comp
Jan 1, 1980
-
Flotation Concentration At Anaconda, Mont.
By Frederick Laist
I. EXPERIMENTAL FLOTATION CONCENTRATION INTRODUCTION EARLY in 1914 it was decided to test, on a fairly large scale, the treatment by flotation of Anaconda slime and mill tailing. For this purpose a
Jan 3, 1916
-
Arizona Paper - Flotation Concentration at Anaconda, Mont.
By Albert E. Wiggin, Frederick Laist
Early ill 1914 it was decided to test, on a fairly large scale, the treatment by flotation of Anaconda slime and mill tailing. For this purpose a standard-type Minerals Separation machine was instal
Jan 1, 1917
-
The Use of Hydraulic Cyclones in Preparing a Backfill Product
By H. E. Lake
VERY EARLY in the initial stages of underground development work at Eldorado's Beaverlodge operation, the decision was made to use mill tailings as a backfill product. Mining and milling commence
Jan 1, 1956
-
Notes on the Working of the MacArthur-Forrest Process for Extracting Gold
In redesigning the cyanide plant at Mount Torrens, in conjunction with Mr. L. W. Grayson, the manager, several minor alterations were introduced in order to have the operations under thorough control,
-
Improved Recovery of Coarse Florida Phosphate
By Broderick E. Davis
Each year, about 45 Mt (50 million st) of flotation tailings are discarded in Florida phosphate operations. These tailings only contain about 4% of the phosphate in the ore. However, more than half of
Jan 1, 1993