Design and Planning of New Passageway Tunnel for Circulation Improvements at Grand Central— 42nd Street Station, New York City - RETC2023
By Alfredo Valdivia, Dominic Reda, Vojtech Gall
The design and planning for the construction of a new passageway to improve access and circulation to better accommodate anticipated increased passenger flow within Grand Central—42nd Street Station.
Jun 13, 2023
-
Developing Project Cost Estimates in Volatile Markets - RETC2023
By Connor Langford, Murray Gant, Ken Massé
For public organizations, preparing accurate project cost estimates is a critical component in capital project planning. Project delivery methods provide a structured approach to moving projects throu
Jun 13, 2023
-
San Francisco Downtown Rail Extension Project: Evolution of Mined Tunnel Construction Approach and Design - RETC2023
By Meghan Murphy, Yiming Sun, Kush Chohan
DTX is a 1.3-mile-long rail extension being constructed by Transbay Joint Powers Authority to extend Caltrain rail service and future California High Speed Rail service to downtown San Francisco. It i
Jun 13, 2023
-
Pipe Canopy Presupport with SEM Tunneling Under Active Roadway and Rail Tracks - RETC2023
By Todd Kilduff, Ryan O’Connell
Pipe canopies continue to gain momentum as a reliable methodology for construction of excavations below critical facilities with minimal surface settlement tolerances, such as railroads or roadways. T
Jun 13, 2023
-
Design of the Akron Northside Interceptor CSO Tunnel - RETC2023
By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.
Jun 13, 2023
-
Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023
By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick
California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i
Jun 13, 2023
-
Metropolitan Water Tunnel Program in Massachusetts - RETC2023
By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh
Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o
Jun 13, 2023
-
Los Angeles, California JWPCP Effluent Outfall Tunnel Project— Tunneling Under Extremely Challenging Conditions - RETC2023
By R. Schuerch, C. Cimiotti, M. Piemontese, N. Karlin, P. Perazzelli, P. Halton
The new Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to White Point Manifold. The tunnel will
Jun 13, 2023
-
Using GIS Application for Inlet/Outlet Tunnel Geologic Mapping for Ground Support (CH Reservoir Case Study) - RETC2023
By Cory Bolen, Nadav Bar-Yaakov, Eric Zimmerman, Gregory Raines
The Chimney Hollow Reservoir Project broke ground in August 2021, constructing the tallest Asphalt Core Dam in North America, intending to improve reliability of drinking water supply to Northern Colo
Jun 13, 2023
-
Bypass Tunnel Shafts—Shotcrete Lining - RETC2023
By Paul Madsen, Bade Sozer, Thomas Hennings, Eileen Test
The Rondout Bypass Tunnel in New York has two access shafts. The upper sections of the shafts are lined with steel pipe to resist a substantial net internal water head . Initial design included a ¾-in
Jun 13, 2023
-
Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023
By Jake Coibion, Elmira Riahi, Dominic Reda, Walter Klary, Vojtech Gall
Progressive Design-Build is becoming a more common delivery method in the tunneling industry. This approach allows the Owner to select a design-builder primarily based on qualification instead of lowe
Jun 13, 2023
-
Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023
By Raphael Victor
The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to
Jun 13, 2023
-
Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023
By Ross Goodman, Jean-Luc des Rivières
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining
Jun 13, 2023
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023
By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023
By Karin Bäppler
Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w
Jun 13, 2023
-
Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023
By Doug Harding
The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single
Jun 13, 2023
-
Enhanced Probe Drilling and Pre-Grouting Design and Recommendations on Hard Rock TBMs - RETC2023
By Stryker Magnuson
While probe drills are not strictly necessary for all projects, the incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstabl
Jun 13, 2023
-
Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023
By Ryan Ward
The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans
Jun 13, 2023
-
SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023
By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell
The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad
Jun 13, 2023
-
Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023
By Denis Tepavac, Mark Trim
Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design