Search Documents

Sort by

  • DFI
    Dynamic Centrifuge Model Tests on Pile-Type Deep Mixing Method Reducing Lateral Flow of Liquefied Ground

    By Tsuda Wakaki, Naoki Takahashi, Natsuki Okuno, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa

    "Deep mixing (DM) method has been increasingly employed as a countermeasure against subsoil liquefaction in recent years. Pile-type DM, however, is considered to have little effect as a liquefaction c

    Jan 1, 2015

  • CIM
    Shear Stregth Enhancement of Rock Mass Due to Passive Rock Bolts

    By L. P. Srivastava

    Rock bolts have been used since long to enhance the shear strength response of jointed rocks in civil and mining engineering structures. However, the assessment of strength response of a rock mass rei

    Jan 1, 2015

  • SME
    Air Cleaning Performance of a New Environmentally Controlled Primary Crusher Operator Booth

    By B. Holen, J. R. Baregi, J. A. Organiscak, A. B. Cecala

    The National Institute for Occupational Safety and Health (NIOSH) cooperated with 3M Company in the design and testing of a new environmentally controlled primary crusher operator booth at the company

    Jan 1, 2015

  • CIM
    Fracture Behavior Evaluation of High Strength Al7050 Alloy at Room and Elevated Temperatures Using Notched Specimens

    By K. Purazrang, P. Musavi Garavi, P. Sh. Naseri, P. Abachi

    The fracture behavior of high strength Al7050 alloy was investigated at room and elevated temperatures using small size, V-notched tear (called Kahn specimen) and compact tension, CT, specimens, respe

    Jan 1, 2015

  • SME
    Micro-Price Optimization: An Industrial Case Study for Coal-Fired Utilities

    By F. Stanley, A. Noble, G. Luttrell

    "The supply chain for coal-fired power stations involve a multi-stage network of mining units, preparation plants, blending facilities and transportation systems. Attempts to optimize the supply chain

    Jan 1, 2015

  • CIM
    The Excavation Damaged Zone in Clay Shales: New Rock Mechanics Insights from Discontinuum Numerical Modelling

    By B. Garitte, O. K. Mahabadi, P. Marschall, A. Lisjak, H. R. Müller, T. Vietor, G. Grasselli

    Numerous research studies have shown that clay rock formations exhibit favourable characteristics for the deep geological disposal of radioactive waste. However, one main concern is that the favourabl

    Jan 1, 2015

  • SME
    Wireframe Construction in Resource Estimation: Methods and Practices

    By K. Zabrusky

    "Wireframe construction is an integral part of resource estimation. Wireframes control domaining of samples and data for geostatistical analysis and grade estimation. They may also provide 3D represen

    Jan 1, 2015

  • SAIMM
    A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop Colliery

    By R. Lombard

    "Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po

    Jan 1, 2015

  • CIM
    Numerical Simulation of Rock Cone Pullout and the Influence of Discrete Fracture Network Statistics on Foundation Anchor Capacity

    By B. Panton, J. Carvalho, E. T. Brown

    "A major consideration in the design of high capacity tiedown anchors for dam, bridge and tower foundations is the tensile resistance of the rock mass to pullout, typically as a result of overturning

    Jan 1, 2015

  • CIM
    Geomechanics and Hydrogeology of Deep-Seated Rock Slides in the Surroundings of Large Reservoirs

    By C. Zangerl, T. Strauhal, S. Perzlmeier, M. Holzmann

    "In high mountainous regions, deep-seated rock slides are often observed in foliated metamorphic rocks such as paragneisses, micaschists and phyllites. Given that comprehensive investigations of deeps

    Jan 1, 2015

  • CIM
    Data Acquisition during Ground Freezing at Thyssen Mining’s Newmont Leeville Turf #3 Ventilation Shaft Project

    By G. A. Witwicki

    "The Thyssen Mining Group of Companies has successfully applied ground freezing technology to numerous projects throughout Europe and North America for over 100 years. Recently, the aspect of data acq

    Jan 1, 2015

  • SME-ICGCM
    Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining

    By Guo Wenbing

    "INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody

    Jan 1, 2015

  • SAIMM
    The recovery of platinum group metals from low-grade concentrates to an iron alloy using silicon carbide as reductant

    By G. A. Bezuidenhout, S. Bradshaw, W. Malan

    "The purpose of the study was to investigate the feasibility of SiC reduction of low-grade concentrates from Lonmin’s Rowland and Easterns operations with respect to metal fall and PGM recovery. These

    Jan 1, 2015

  • CIM
    Modeling the Post-Peak Strength Degradation on Tunnel Stability

    By F. Y. Hsiao, H. C. Kao

    Underground excavation in hard rock is normally stable at shallow depth except for wedge failure. However, the excavation depth is rapidly increasing recently. In high overburden stress condition, the

    Jan 1, 2015

  • CIM
    Transitioning from Open Pit to Underground Mass Mining: Meeting the Rock Engineering Challenges of Going Deeper

    By K. Woo

    "With ever-increasing global demand for mineral resources, mining companies are considering developing deeper, more complex and lower grade ore bodies. Recent years have seen the transition from surfa

    Jan 1, 2015

  • DFI
    The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep Foundations

    By Beim Jorge, Piscsalko George

    "Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi

    Jan 1, 2015

  • SAIMM
    Integration of imprecise and biased data into mineral resource estimates

    By E. Machaka, A. Cornah

    "Mineral resources are typically informed by multiple data sources of varying reliability throughout a mining project life cycle. Abundant data which are imprecise or biased or both (‘secondary data’)

    Jan 1, 2015

  • CIM
    Post-Pillar Design for Overhand Cut and Fill Mining in Moderate to High Stress Conditions – A Case Study

    By M. Yao, D. Thibodeau

    "Selective mining, such as post pillar cut and fill, is used in large, flat, irregularly shaped ore bodies where ground stability is to be maintained. This selective mining is used to open the stope t

    Jan 1, 2015

  • ISEE
    Determination of Dynamic Pressure and its Effect on Blasting

    By Ignacio Humeres Valdivia, Alejandro Ferrada Vergara

    In the latest years, the use of innovative blasting techniques has become more frequent in mines all over the world. Such techniques allow the miner to be more aggressive in the distribution of explos

    Jan 1, 2015

  • CIM
    Numerical Simulation of Hydraulic Fracture Propagation of Landfacies Ultra-Heavy Oilsands in Xinjiang Oilfield

    By Y. Jin, H. You, H. Pang, B. Lin

    Successful application of steam assisted gravity drainage (SAGD) on the recovery of land facies ultra-heavy oil in Xinjiang oilfield depends largely on shortening the preheating period with the aid of

    Jan 1, 2015